Contractor: Consultant:

M/S Sarwar & co. (Pvt) Ltd Creative Engineering (pvt) Ltd
CONCRETE COMPRESSIVE STRENGTH (T-22)
Concrete Class : Plum Conc. 1;3;6 Ratio Date Casting : 29/4/2014 Lab No.
Source of Aggregate :
Trail # : Structure No. Request No.
Structure Location: Part of Structure :
Curing : Laboratory / Field : Laboratory Cured
Cylinder Testing Age Area Type of Load Compressive
Dimensions (CM)
No. Date Days (Cm2) Fracture (KN) Strength
L D1 D2 Avg kg/cm2
A 6/5/2014 7 182.4 240 134.2

B // // // 240 134.2

C // // // 255 142.5

Average for 7 days 137.0

Required: 128 Kg/cm2 Achieved for 7 days 137

D 27/5/2014 28 182.4 320 178.9

E // // // 315 176.1

F // // // 325 181.7

Average for 28 days 178.9

Required: 170 Kg/cm2 Achieved for 28 days 179

Cylinder NO. SSD mass (g) Volume (cc) Density (g/cc)

Tested By : Date : Average (g/cc)


Remarks :

LAB. INCHARGE:
EA (Pvt) Ltd.
N.H.A BASE LAB. PNBP
Contractor: Consultant:
M/S Sarwar & co. (Pvt) Ltd Creative Engineering (pvt) Ltd
CONCRETE COMPRESSIVE STRENGTH (T-22)
Concrete Class : Plum Conc. 1;3;6 Ratio Date Casting : 27/4/2014 Lab No.
Source of Aggregate :
Trail # : Structure No. Request No.
Structure Location: Part of Structure :
Curing : Laboratory / Field : Laboratory Cured
Cylinder Testing Age Area Type of Load Compressive
Dimensions (CM)
No. Date Days (Cm2) Fracture (KN) Strength
L D1 D2 Avg kg/cm2
A 4/5/2014 7 182.4 245 137.0

B // // // 230 128.6

C // // // 245 137.0

Average for 7 days 134.2

Required: 128 Kg/cm2 Achieved for 7 days 134

D 25/5/2014 28 182.4 310 173.3

E // // // 310 173.3

F // // // 320 178.9

Average for 28 days 175.2

Required: 170 Kg/cm2 Achieved for 28 days 175

Cylinder NO. SSD mass (g) Volume (cc) Density (g/cc)

Tested By : Date : Average (g/cc)


Remarks :

LAB. INCHARGE:
EA (Pvt) Ltd.
N.H.A BASE LAB. PNBP
Contractor: Consultant:
M/S Sarwar & co. (Pvt) Ltd Creative Engineering (pvt) Ltd
CONCRETE COMPRESSIVE STRENGTH (T-22)
Concrete Class : Plum Conc. 1;3;6 Ratio Date Casting : 25/4/2014 Lab No.
Source of Aggregate :
Trail # : Structure No. Request No.
Structure Location: Part of Structure :
Curing : Laboratory / Field : Laboratory Cured
Cylinder Testing Age Area Type of Load Compressive
Dimensions (CM)
No. Date Days (Cm2) Fracture (KN) Strength
L D1 D2 Avg kg/cm2
A 2/5/2014 7 182.4 230 128.6

B // // // 235 131.4

C // // // 235 131.4

Average for 7 days 130.4

Required: 128 Kg/cm2 Achieved for 7 days 130

D 23/5/2014 28 182.4 315 176.1

E // // // 320 178.9

F // // // 320 178.9

Average for 28 days 177.9

Required: 170 Kg/cm2 Achieved for 28 days 178

Cylinder NO. SSD mass (g) Volume (cc) Density (g/cc)

Tested By : Date : Average (g/cc)


Remarks :

LAB. INCHARGE:
EA (Pvt) Ltd.
N.H.A BASE LAB. PNBP
Contractor: Consultant:
M/S Sarwar & co. (Pvt) Ltd Creative Engineering (pvt) Ltd
CONCRETE COMPRESSIVE STRENGTH (T-22)
Concrete Class : Plum Conc. 1;3;6 Ratio Date Casting : 24/4/2014 Lab No.
Source of Aggregate :
Trail # : Structure No. Request No.
Structure Location: Part of Structure :
Curing : Laboratory / Field : Laboratory Cured
Cylinder Testing Age Area Type of Load Compressive
Dimensions (CM)
No. Date Days (Cm2) Fracture (KN) Strength
L D1 D2 Avg kg/cm2
A 1/5/2014 7 182.4 255 142.5

B // // // 255 142.5

C // // // 250 139.8

Average for 7 days 141.6

Required: 128 Kg/cm2 Achieved for 7 days 142

D 22/5/2014 28 182.4 350 195.7

E // // // 350 195.7

F // // // 330 184.5

Average for 28 days 191.9

Required: 170 Kg/cm2 Achieved for 28 days 192

Cylinder NO. SSD mass (g) Volume (cc) Density (g/cc)

Tested By : Date : Average (g/cc)


Remarks :

LAB. INCHARGE:
EA (Pvt) Ltd.
N.H.A BASE LAB. PNBP
Contractor: Consultant:
M/S Sarwar & co. (Pvt) Ltd Creative Engineering (pvt) Ltd
CONCRETE COMPRESSIVE STRENGTH (T-22)
Concrete Class : Plum Conc. 1;3;6 Ratio Date Casting : 22/4/2014 Lab No.
Source of Aggregate :
Trail # : Structure No. Request No.
Structure Location: Part of Structure :
Curing : Laboratory / Field : Laboratory Cured
Cylinder Testing Age Area Type of Load Compressive
Dimensions (CM)
No. Date Days (Cm2) Fracture (KN) Strength
L D1 D2 Avg kg/cm2
A 29/4/2014 7 182.4 260 145.3

B // // // 240 134.2

C // // // 250 139.8

Average for 7 days 139.8

Required: 128 Kg/cm2 Achieved for 7 days 140

D 20/5/2014 28 182.4 350 195.7

E // // // 350 195.7

F // // // 345 192.9

Average for 28 days 194.7

Required: 170 Kg/cm2 Achieved for 28 days 195

Cylinder NO. SSD mass (g) Volume (cc) Density (g/cc)

Tested By : Date : Average (g/cc)


Remarks :

LAB. INCHARGE:
EA (Pvt) Ltd.
N.H.A BASE LAB. PNBP
Contractor: Consultant:
M/S Sarwar & co. (Pvt) Ltd Creative Engineering (pvt) Ltd
CONCRETE COMPRESSIVE STRENGTH (T-22)
Concrete Class : Plum Conc. 1;3;6 Ratio Date Casting : 21/4/2014 Lab No.
Source of Aggregate :
Trail # : Structure No. Request No.
Structure Location: Part of Structure :
Curing : Laboratory / Field : Laboratory Cured
Cylinder Testing Age Area Type of Load Compressive
Dimensions (CM)
No. Date Days (Cm2) Fracture (KN) Strength
L D1 D2 Avg kg/cm2
A 28/4/2014 7 182.4 235 131.4

B // // // 245 137.0

C // // // 260 145.3

Average for 7 days 137.9

Required: 128 Kg/cm2 Achieved for 7 days 138

D 19/5/2014 28 182.4 355 198.4

E // // // 350 195.7

F // // // 350 195.7

Average for 28 days 196.6

Required: 170 Kg/cm2 Achieved for 28 days 197

Cylinder NO. SSD mass (g) Volume (cc) Density (g/cc)

Tested By : Date : Average (g/cc)


Remarks :

LAB. INCHARGE:
EA (Pvt) Ltd.
N.H.A BASE LAB. PNBP
Contractor: Consultant:
M/S Sarwar & co. (Pvt) Ltd Creative Engineering (pvt) Ltd
CONCRETE COMPRESSIVE STRENGTH (T-22)
Concrete Class : Plum Conc. 1;3;6 Ratio Date Casting : 19/4/2014 Lab No.
Source of Aggregate :
Trail # : Structure No. Request No.
Structure Location: Part of Structure :
Curing : Laboratory / Field : Laboratory Cured
Cylinder Testing Age Area Type of Load Compressive
Dimensions (CM)
No. Date Days (Cm2) Fracture (KN) Strength
L D1 D2 Avg kg/cm2
A 26/4/2014 7 182.4 255 142.5

B // // // 240 134.2

C // // // 240 134.2

Average for 7 days 137.0

Required: 128 Kg/cm2 Achieved for 7 days 137

D 17/5/2014 28 182.4 345 192.9

E // // // 315 176.1

F // // // 315 176.1

Average for 28 days 181.7

Required: 170 Kg/cm2 Achieved for 28 days 182

Cylinder NO. SSD mass (g) Volume (cc) Density (g/cc)

Tested By : Date : Average (g/cc)


Remarks :

LAB. INCHARGE:
EA (Pvt) Ltd.
N.H.A BASE LAB. PNBP
Contractor: Consultant:
M/S Sarwar & co. (Pvt) Ltd Creative Engineering (pvt) Ltd
CONCRETE COMPRESSIVE STRENGTH (T-22)
Concrete Class : Plum Conc. 1;3;6 Ratio Date Casting : 17/4/2014 Lab No.
Source of Aggregate :
Trail # : Structure No. Request No.
Structure Location: Part of Structure :
Curing : Laboratory / Field : Laboratory Cured
Cylinder Testing Age Area Type of Load Compressive
Dimensions (CM)
No. Date Days (Cm2) Fracture (KN) Strength
L D1 D2 Avg kg/cm2
A 24/4/2014 7 182.4 250 139.8

B // // // 255 142.5

C // // // 255 142.5

Average for 7 days 141.6

Required: 128 Kg/cm2 Achieved for 7 days 142

D 15/5/2014 28 182.4 355 198.4

E // // // 320 178.9

F // // // 330 184.5

Average for 28 days 187.3

Required: 170 Kg/cm2 Achieved for 28 days 187

Cylinder NO. SSD mass (g) Volume (cc) Density (g/cc)

Tested By : Date : Average (g/cc)


Remarks :

LAB. INCHARGE:
EA (Pvt) Ltd.
N.H.A BASE LAB. PNBP
Contractor: Consultant:
M/S Sarwar & co. (Pvt) Ltd Creative Engineering (pvt) Ltd
CONCRETE COMPRESSIVE STRENGTH (T-22)
Concrete Class : Plum Conc. 1;3;6 Ratio Date Casting : 15/4/2014 Lab No.
Source of Aggregate :
Trail # : Structure No. Request No.
Structure Location: Part of Structure :
Curing : Laboratory / Field : Laboratory Cured
Cylinder Testing Age Area Type of Load Compressive
Dimensions (CM)
No. Date Days (Cm2) Fracture (KN) Strength
L D1 D2 Avg kg/cm2
A 22/4/2014 7 182.4 230 128.6

B // // // 245 137.0

C // // // 245 137.0

Average for 7 days 134.2

Required: 128 Kg/cm2 Achieved for 7 days 134

D 13/5/2014 28 182.4 340 190.1

E // // // 320 178.9

F // // // 315 176.1

Average for 28 days 181.7

Required: 170 Kg/cm2 Achieved for 28 days 182

Cylinder NO. SSD mass (g) Volume (cc) Density (g/cc)

Tested By : Date : Average (g/cc)


Remarks :

LAB. INCHARGE:
EA (Pvt) Ltd.
N.H.A BASE LAB. PNBP
Contractor: Consultant:
M/S Sarwar & co. (Pvt) Ltd Creative Engineering (pvt) Ltd
CONCRETE COMPRESSIVE STRENGTH (T-22)
Concrete Class : Plum Conc. 1;3;6 Ratio Date Casting : 13/4/2014 Lab No.
Source of Aggregate :
Trail # : Structure No. Request No.
Structure Location: Part of Structure :
Curing : Laboratory / Field : Laboratory Cured
Cylinder Testing Age Area Type of Load Compressive
Dimensions (CM)
No. Date Days (Cm2) Fracture (KN) Strength
L D1 D2 Avg kg/cm2
A 20/4/2014 7 182.4 240 134.2

B // // // 250 139.8

C // // // 250 139.8

Average for 7 days 137.9

Required: 128 Kg/cm2 Achieved for 7 days 138

D 11/5/2014 28 182.4 330 184.5

E // // // 330 184.5

F // // // 345 192.9

Average for 28 days 187.3

Required: 170 Kg/cm2 Achieved for 28 days 187

Cylinder NO. SSD mass (g) Volume (cc) Density (g/cc)

Tested By : Date : Average (g/cc)


Remarks :

LAB. INCHARGE:
EA (Pvt) Ltd.
N.H.A BASE LAB. PNBP
Contractor: Consultant:
M/S Sarwar & co. (Pvt) Ltd Creative Engineering (pvt) Ltd
CONCRETE COMPRESSIVE STRENGTH (T-22)
Concrete Class : Plum Conc. 1;3;6 Ratio Date Casting : 12/4/2014 Lab No.
Source of Aggregate :
Trail # : Structure No. Request No.
Structure Location: Part of Structure :
Curing : Laboratory / Field : Laboratory Cured
Cylinder Testing Age Area Type of Load Compressive
Dimensions (CM)
No. Date Days (Cm2) Fracture (KN) Strength
L D1 D2 Avg kg/cm2
A 19/4/2014 7 182.4 235 131.4

B // // // 230 128.6

C // // // 240 134.2

Average for 7 days 131.4

Required: 128 Kg/cm2 Achieved for 7 days 131

D 10/5/2014 28 182.4 320 178.9

E // // // 320 178.9

F // // // 330 184.5

Average for 28 days 180.7

Required: 170 Kg/cm2 Achieved for 28 days 181

Cylinder NO. SSD mass (g) Volume (cc) Density (g/cc)

Tested By : Date : Average (g/cc)


Remarks :

LAB. INCHARGE:
EA (Pvt) Ltd.
N.H.A BASE LAB. PNBP
Contractor: Consultant:
M/S Sarwar & co. (Pvt) Ltd Creative Engineering (pvt) Ltd
CONCRETE COMPRESSIVE STRENGTH (T-22)
Concrete Class : Plum Conc. 1;3;6 Ratio Date Casting : 10/4/2014 Lab No.
Source of Aggregate :
Trail # : Structure No. Request No.
Structure Location: Part of Structure :
Curing : Laboratory / Field : Laboratory Cured
Cylinder Testing Age Area Type of Load Compressive
Dimensions (CM)
No. Date Days (Cm2) Fracture (KN) Strength
L D1 D2 Avg kg/cm2
A 17/4/2014 7 182.4 240 134.2

B // // // 245 137.0

C // // // 245 137.0

Average for 7 days 136.0

Required: 128 Kg/cm2 Achieved for 7 days 136

D 8/5/2014 28 182.4 315 176.1

E // // // 315 176.1

F // // // 320 178.9

Average for 28 days 177.0

Required: 170 Kg/cm2 Achieved for 28 days 177

Cylinder NO. SSD mass (g) Volume (cc) Density (g/cc)

Tested By : Date : Average (g/cc)


Remarks :

LAB. INCHARGE:
EA (Pvt) Ltd.