Close Out

You might also like

Download as pdf
Download as pdf
You are on page 1of 5
'SECB Supervision Projects ALSUWEIDI | SITE HSE INSPECTION REPORT Building For Heirs of Ismail Abdul Project: fcetertiohamea Al Maite SECB Project No: | 1722 Location Plot C77, Sector MES Date / Time: 25.05.2021 Who attended inspection? | Engr. Umar (HSE Ms Seapal) Report No. SECBIHSE/1722/32 PRUNE liad DEFINITION. Pee ed Immediate same day acton is required to avols the Nigh isk ofan accident or neddent ‘Action is required within the next 3 days ofthe finding Improvement action rea Caer) 4) INSPECTION FINDINGS Health & Safety Unprotected openings have ‘been observed on all oor Which is increasing the fall hazard. Health & Safety Edge protection and toe] boards are missing t several location . [ACTIONS REQUIRED (What must be done & ACTIONS REQUIRED All the opening and edges must be ‘adequately Protected , Hazard ‘awareness sign board should be displayed Page tof 2 ‘SECB Supervision Projects ALSUWEIDI SITE HSE INSPECTION REPORT | Health & Safety Worker has been observed! working on 6 floor on stal case edge without wearing full body safety harness. ACTIONS REQUIRED Discipinary action should be taken against the workers and the ‘supervisor, Training should be ‘conducted to entre work force those Working at height. Safety harness {and life lines should be provided and supervisors must ensure workers are complying afectively Engr. Ypuset Ma HSE Mis Seapal Health & Safety Unprotected lve electrical cable has been observed aif site ACTIONS REQUIRED Observed electrical cable must be installed in safe manner. Contactor ‘ensure the electical installation safety at site Health & Safety Waste and debris has been accumulated at 3 and 4rth floor. Ein ‘SECB HSE Engineer / ‘Specialist / Ref Rakesh Kumar ACTIONS REQUIRED Observed waste and debris should be removed. Good housekeeping shouldbe maintained Social distance awareness is being speared 25.08.2021 Engr. Ypuset eMe HSE Mis Seapal ‘SECB Resident Engi Project Manager: Makin Alnagid 25.05.2021 Pago 2of2 PROJECT ALSUWEIDI NAME:COMMERCIAL x SEAPAL GROUP (0)C_wuall|_uues_wl BUILDING FOR HEIRS © | OF ISMAIL ALMULLA ME 9,C 77 MBZ HSE OBSERVATION & NON COMPLIANCE CLOSE OUT REPORT To: M/s SECB REPORT #: SECB/HSE/1722/32 DATE: 25/05 /2021 The following Observation/Non Compliance were observed during inspection: (Attached photos of corrective action evidence whenever applicable). Ne Observation / Non Compliance | “Tose out Remarks i ‘Health & Safety Corrective Action Taken: 25.05-201 __ Flor openings have been protected in der to prevent fall of persons/materials Inprotected openings have been observed bn all floor. Which is increasing the fall azard. Health & Safety Corrective Action Taken: Edge protection and toe board has been provided to prevent the person /materials {from fall, looF on stair case edge without wearing full ody safety harness. 2 Edge protection and toe boards are missin t several location - } 2505-2008 a : pit Health & Safety | Jorker has been observed working on 6 2505-2021 3 Corrective Action Taken: |Activity was suspended immediately, Peeratives were advised to use fall rotection /adequate PPE while working t height. pisuweri ‘Health & ifety Inprotected live electrical cable has been Corrective Action Taken: /ooden Box is provided over the cable to. prevent cable damage bbserved at site. 09-06-2028 Wealth & Safety Corrective Action Taken: [The housekeeping team was assigned and Waste and debris has been accumulated at Accumulated waste has been removed rd and 4rth floor. o7-062001 disposed of inthe designated area. Name Designation Date iT ‘Umar Saced HSE Officer 2 10-06-2021 Yousef Mardy Project Manager ~ aa, 10-06-2021

You might also like