1
COST TABLES
Material Table
Material Specifications unit cost(€)
Carbon Steel DIN 17100 St37-2 tubes meter 0.92
XPS Blue Extruded Sheet(125×6
Foam 2.69
polystyrene foam 0×5)cm
Steel sheet 1mm thickness kg 1.23
Steel sheet 3mm thickness kg 1.76
Steel sheet 5mm thickness kg 2.31
NOTES
Aluminum Bulk 7075-T6 kg 9.65
Aluminum sheets 7075-T6 sheet 18.74
wood Sheets MDF Sheet()cm 12.23 1) These costs have been compiled to represent the cost of parts that a
manufacturing company could be expected to pay for manufacturing a
3D printer Filament CCTREE kg 31.95 vehicle at 1000 units per year. These values represent around half of the
manufacturer´s suggested retail price (MSRP) for finished parts.
Glass Fiber - kg 2.31
2) The cost of the materials bought in the university represents the
process Table production volume of a company and not the purchase price of the
Process Details unit cost(€) university team.
Machining CNC Machine hour 5.27
Water Jet For meter cut m 7.21 3)There are some materials and processes in the explanation sheet that
Lascer Cut For Tubes cut 2.88 didn't exist in the BOM of frame and body but we use them in other parts
Lascer Cut For sheet metal minute 2.45 of car.
Lascer Cut For wood sheets minute 0.81
4) All prices were gotten from factories and workshops in our home
Weld Argon Weldment cm welding 0.78
country.
Bending - bend 2.63
Tube end Preperation
Tube process end 0.21
Before Welding
Hand finish labour day 13.73
3D prenting machine running cost hour 4.74