QA-QC INSPECTION / OBSERVATION REPORT

Site Name :- MLCP Jail Road ; Puri


Date of Visit :- 22.06.21
Observed by :- CMMA
Sl. Proposed Corrective Target
Location Observation Root Cause Action By Observation Photograph Remarks
No. Action Date

Materials should be
stack properly and
MLCP Jail Contractor
4 Improper Materials Stacking Negligency of supervision extra care should be Immediate
Road /TCE
taken in monsoon
season

There should be side


MLCP Jail Contractor
5 No side cover block found in slab beam Negligency of supervision cover block fixed in Immediate
Road /TCE
all beams both side

This practice should


MLCP Jail Materials found properly stacked at Contractor
6 Good Practice be maintain Immediate
Road Batching Plant /TCE
continuously