Date:

TSHD SHIP DAILY REPORT

Location: Designation #
INTRO.

Project: Master
Client: Chief Mate
Proj. Start Date: Project Calendar Day: 2nd Officer
Weather: 3rd Officer
COND.

Swell: OOW
Current: Chief Engineer
2nd Engineer

CREW
Shift Shift dur. 3rd Engineer
DAILY ACTIVITY DESC.

Trip target Active hr Electrician


Actual trip/day Idle hr Fitter
Oiler
Cook
Bosun
Able Seaman
Ordinary Seaman
TOTAL: 0

Visitor 1, Eng Rep.
Grand 
Σ  PRODUCTION

Activity Prev. Prod. Daily Prod. Σ Prod. % Visitor 2, Client Rep.


Total

VISITORS
Visitor 3, Owner Rep.
Volume Dredged Visitor 4, Ship Mng.
TDS Visitor 5, Other
# of trips TOTAL: 0
Reclamation GRAND TOTAL: 0

Full  Over Sail  Total  Hopper


Idle Dump Sail In Dump 
Status Load flow Out Cycle V TDS Dens.
Method
Start Finish min min min min min min min m3 ton kg/m3
DAILY LOG

TOTAL 0 0 0

Prev.  Daily  Curr. 


Cpct
CONSUMPTION & LEVEL

Type Level Cons. Level %


m3 m3 m3 m3
REQUESTS

MGO
NOTES

OIL
FW
D OIL
D W