Pre--Commissioning and
Pre
C
Commissioning
i i i
Engineering
System
A system is a major subdivision of an installation, being
either process or utility, that performs a major
operational function of the plant. The system includes
all the various equipment that allows it to operate. The
firewater pumps, power generation, control systems,
telecommunications oil,
telecommunications, oil gas,
gas water processing,
processing etc.,
etc
are typical examples of systems.
Sub-System
Sub- System::
A subsystem is a further subdivision of a system, that
performs a p
p partial operational
p function to the system,
y ,
with no or little interference from the other subsystems.
Several equipment with the same function in the
system main packages are typical examples of
system,
subsystems.
Page 3 OICO Commissioning Dept.
Time Schedule
Precommissioning
Commissioning
Start up
R ti
Routine Operation
O ti
Performance
Test
Time
Th Precommissioning
The P i i i physical
h i l scope off work
k
consists, as previously said, in:
in:
Static/de--energised
Static/de tests of equipment
items
The running
running--in and onon--line tests of utilities
system and the running-
running-in and on on--line
tests with inert fluid of process system
system..
The Start-
Start-up scope of work includes activities
preparation and witnessing of the commissioning
activities
activities.
ti iti . After
Aft th t the
that, th operational
ti l activities
ti iti
properly speaking are split prior to and after
oil/gas introduction
introduction..
Operational
p activities after oil/gas
/g in.
in.
Instrument
I t t
Piping
Mechanical
Process
Page 10 OICO Commissioning Dept.
Electrical Tests
Functional
u ct o a Test
est
ﻫﻤﺎﻧﻨﺪ اﻟﻜﺘﺮﻳﻜﺎل اﺳﺖ ﺗﻨﻬﺎ ﺗﻔﺎوت در اﻳﻦ اﺳﺖ ﻛﻪ در
ﺷﻮد.
ﺑﺴﻴﺎر ﺎﭘﺎﻳﻴﻦ اوارد ﻣﻲ ﺷ
وﻟﺘﺎژﻫﺎي ﺎ
ﺑﺮق ﺎﺑﺎ ﻟﺘﺎژ ﺎ
اﻳﻨﺠﺎ ق
ا ﺎ
OTP
ﺑﻌﺪ از اﻧﺠﺎم ﻛﻠﻴﻪ ﺗﺴﺘﻬﺎي ﻣﻜﺎﻧﻴﻚ ﺗﺠﻬﻴﺰات دوار ،ﺻﺤﺖ و ﺳﻼﻣﺖ ﻛﺎرﻛﺮد
ﺳﻴﺎل ﻧﺰدﻳﻚ ﺑﻪ آآن ﻛﻨﺘﺮل ﻣﻲ ﮔﮔﺮدد.
اﺻﻠﻲ و ﺎﻳﺎ ﺎ
ﺳﻴﺎل ا ﻠ
ﺗﻮﺳﻂ ﺎ
ﺗﺠﻬﻴﺰ ،ﻂ
Dehydration
y
ﺟﻬﺖ ﺑﻪ ﺣﺪاﻗﻞ رﺳﺎﻧﻴﺪن رﻃﻮﺑﺖ در ﺧﻄﻮط ﭘﺮوﭘﺎن ﻳﺎ ﺧﻄﻮﻃﻲ ﻛﻪ دﻣﺎي ﻛﻤﺘﺮ از
7Cدارﻧﺪ اﻳﻦ ﺗﺴﺖ اﻧﺠﺎم ﻣﻲ ﺷﻮد.
Onshore
– Two Phases, each phase has two trains
Design Capacity: 2000 MMSCFD
Offshore operation:
– Water
Water--Gas Separation
– Multiphase
M lti h Transportation
T t ti to
t the
th PlPlantt
– MEG injection for Hydrate Inhibition
Subsystem 782
BOQ 66000
Electrical: 9200
Piping: 1000
Instrument: 53000
Mechanical: 1400
Process: 950
Utility Units
Process Units
Offsite Units
Miscellaneous Units