Att #6.

Marked-up PID for Phase-I 1 / 18


Attachment #6 Marked-up P&ID for Phase-I, Flushing
Phase - I : Water Flushing
Step-1 : Main HDR Flushing including Cooling Tower Cell A via
circulation pump for black start up
Cell A would be cleaned according to the water condition.
Step-2: Power Generation Unit Flushing according to CWS/CWR
line by line for Black Start-up
Step-3 : Re-instatement

SP-AI-01

Legend
Flushing Point
Valve Open
Valve Close
Flow direction
Temporary Valve
Temporary Spool

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM
COOLING WATER UNIT
COOLING TOWER
Att #6. Marked-up PID for Phase-I 2 / 18
Step-1 : Main HDR Flushing including Cooling Tower Cell A via
STAGE A : Flushing and Passivation for Black Start-UP circulation pump for black start up Legend
Phase - I : Water Flushing Cell A would be cleaned according to the water condition. Flushing/Drain A
Step-2: Power Generation Unit Flushing according to CWS/CWR Point
line by line for Black Start-up Valve Open
Step-3 : Re-instatement
Valve Close
Flow direction
Temporary Valve
Temporary Spool
B

SP-AI-10

D
Temporary spool & Hose
with temporary pump

side-stream filters
back-wash basin
(33-BA-002)
If the water condition is not good in Cell-A, transfer
water to back-wash basin via temporary spool &
Hose with temporary pump.(refer to step AI-1-4)
F

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM H
COOLING WATER UNIT
COOLING WATER SYSTEM FOR BLACK START-UP

1 2 3 4 5 6 7 8 9 10 11 12
THIS DRAWING IS THE PROPERTY OF HDGSK JV. IT CONTAINS INFORMATIONS REGARDED AS CONFIDENTIAL BY HDGSK JV. THIS DRAWING AND THE INFORMATION THEREON IS NOT TO BE USED OR DISCOSED TO OTHERS EXCEPT WITH WRITTEN HDGSK JV AUTHORIZATION. THIS DRAWING IS NOT TO BE REPRODUCED OR COPIED WITHOUT PERMISSION AND IS TO BE RETURNED TO HDGSK JV WITH ANY COPIES (PARTIAL OR COMPLETE) ON DEMAND.
Att #6. Marked-up PID for Phase-I 3 / 18

Legend
Flushing/Drain
Point
Valve Open FP-AI-01
Valve Close
C
Flow direction
Temporary Valve
Temporary Spool

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM H
COOLING WATER UNIT
PROCESS LINES AT BATTERY LIMITS

1 2 3 4 5 6 7 8 9 10 11 12
Att #6. Marked-up PID for Phase-I 4 / 18
Legend
Flushing/Drain A
Point
Valve Open
Valve Close
Flow direction
Temporary Valve
Temporary Spool
B

E NG I NE ERI NG CO .
L T D .

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM H
REFINERY INTERCONNECTING UNIT
UTILITIES

1 2 4 3 5 6 7 9 10 11 12
THIS DRAWING IS THE PROPERTY OF HDGSK JV. IT CONTAINS INFORMATIONS REGARDED AS CONFIDENTIAL BY HDGSK JV. THIS DRAWING AND THE INFORMATION THEREON IS NOT TO BE USED OR DISCOSED TO OTHERS EXCEPT WITH WRITTEN HDGSK JV AUTHORIZATION. THIS DRAWING
8
IS NOT TO BE REPRODUCED OR COPIED WITHOUT PERMISSION AND IS TO BE RETURNED TO HDGSK JV WITH ANY COPIES (PARTIAL OR COMPLETE) ON DEMAND.
Att #6. Marked-up PID for Phase-I 5 / 18
Legend
Flushing/Drain
Point A
Valve Open
Valve Close
Flow direction
Temporary Valve
Temporary Spool

SP-AI-02

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM H
POWER GENERATION UNIT
COOLING WATER DISTRIBUTION

1 2 3 4 5 6 7 8 9 10 11 12
THIS DRAWING IS THE PROPERTY OF HDGSK JV. IT CONTAINS INFORMATIONS REGARDED AS CONFIDENTIAL BY HDGSK JV. THIS DRAWING AND THE INFORMATION THEREON IS NOT TO BE USED OR DISCOSED TO OTHERS EXCEPT WITH WRITTEN HDGSK JV AUTHORIZATION. THIS DRAWING IS NOT TO BE REPRODUCED OR COPIED WITHOUT PERMISSION AND IS TO BE RETURNED TO HDGSK JV WITH ANY COPIES (PARTIAL OR COMPLETE) ON DEMAND.
Att #6. Marked-up PID for Phase-I 6 / 18
Legend
Flushing/Drain
Point
Valve Open
Valve Close
Flow direction
Temporary Valve
Temporary Spool
SP-AI-03

SP-AI-04

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM
POWER GENERATION UNIT
37-GTG-001B - COOLING WATER DISTRIBUTION
Att #6. Marked-up PID for Phase-I 7 / 18

FP-AI-02

FP-AI-04
FP-AI-03

FP-AI-05

Legend

2"
Flushing/Drain
Point
Valve Open
Valve Close
Flow direction
Temporary Valve
Temporary Spool

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM
POWER GENERATION UNIT
37-GTG-001B - LUBE OIL SYSTEM (1)
Att #6. Marked-up PID for Phase-I 8 / 18
Legend
Flushing/Drain FP-AI-06
Point
Valve Open
Valve Close
Flow direction
Temporary Valve
Temporary Spool
FP-AI-07

G G
~ ~

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM
POWER GENERATION UNIT
37-GTG-001B - GENERATOR SYSTEM
Att #6. Marked-up PID for Phase-I 9 / 18
Legend
Flushing/Drain
Point
Valve Open
Valve Close
Flow direction
Temporary Valve TURBINE ENCLOSURE

Temporary Spool

FP-AI-09

FP-AI-08

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM
POWER GENERATION UNIT
37-GTG-001B - PURGE AIR SYSTEM DUAL FUEL
Att #6. Marked-up PID for Phase-I 10 / 18
Legend
Flushing/Drain
Point
Valve Open
Valve Close
Flow direction
Temporary Valve
SP-AI-05 Temporary Spool

SP-AI-06

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM
POWER GENERATION UNIT
37-GTG-001A - COOLING WATER DISTRIBUTION
Att #6. Marked-up PID for Phase-I 11 / 18

FP-AI-10

FP-AI-12
FP-AI-11

FP-AI-13

Legend

2"
Flushing/Drain
Point
Valve Open
Valve Close
Flow direction
Temporary Valve
Temporary Spool

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM
POWER GENERATION UNIT
37-GTG-001A - LUBE OIL SYSTEM (1)
Att #6. Marked-up PID for Phase-I 12 / 18
FP-AI-14
Legend
Flushing/Drain
Point
Valve Open
Valve Close
Flow direction
Temporary Valve
Temporary Spool
FP-AI-15

G G
~ ~

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM
POWER GENERATION UNIT
37-GTG-001A - GENERATOR SYSTEM
Att #6. Marked-up PID for Phase-I 13 / 18
Legend
Flushing/Drain
Point
Valve Open
Valve Close
Flow direction
Temporary Valve TURBINE ENCLOSURE

Temporary Spool

FP-AI-16

FP-AI-17

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM
POWER GENERATION UNIT
37-GTG-001A - PURGE AIR SYSTEM DUAL FUEL
Att #6. Marked-up PID for Phase-I 14 / 18

B
FP-AI-18
Legend
Flushing/Drain
Point
Valve Open
Valve Close
Flow direction
Temporary Valve C

Temporary Spool

FP-AI-19

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM H
POWER GENERATION UNIT
NATURAL GAS K.O. DRUM AND COMPRESSOR

1 2 3 4 5 6 7 8 9 10 11 12
THIS DRAWING IS THE PROPERTY OF HDGSK JV. IT CONTAINS INFORMATIONS REGARDED AS CONFIDENTIAL BY HDGSK JV. THIS DRAWING AND THE INFORMATION THEREON IS NOT TO BE USED OR DISCOSED TO OTHERS EXCEPT WITH WRITTEN HDGSK JV AUTHORIZATION. THIS DRAWING IS NOT TO BE REPRODUCED OR COPIED WITHOUT PERMISSION AND IS TO BE RETURNED TO HDGSK JV WITH ANY COPIES (PARTIAL OR COMPLETE) ON DEMAND.
Att #6. Marked-up PID for Phase-I 15 / 18

FP-AI-20

FP-AI-21

Legend
Flushing/Drain
Point
Valve Open
Valve Close
Flow direction
F
Temporary Valve
Temporary Spool

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM H
POWER GENERATION UNIT
NATURAL GAS K.O. DRUM AND COMPRESSOR

1 2 3 4 5 6 7 8 9 10 11 12
THIS DRAWING IS THE PROPERTY OF HDGSK JV. IT CONTAINS INFORMATIONS REGARDED AS CONFIDENTIAL BY HDGSK JV. THIS DRAWING AND THE INFORMATION THEREON IS NOT TO BE USED OR DISCOSED TO OTHERS EXCEPT WITH WRITTEN HDGSK JV AUTHORIZATION. THIS DRAWING IS NOT TO BE REPRODUCED OR COPIED WITHOUT PERMISSION AND IS TO BE RETURNED TO HDGSK JV WITH ANY COPIES (PARTIAL OR COMPLETE) ON DEMAND.
Att #6. Marked-up PID for Phase-I 16 / 18

Legend
Flushing/Drain
Point
Valve Open
Valve Close
Flow direction
Temporary Valve
Temporary Spool

FP-AI-24

FP-AI-25

FP-AI-22
FP-AI-23

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM
POWER GENERATION UNIT
37-K-001 - COMMON COOLING WATER FOR CYLINDERS
Att #6. Marked-up PID for Phase-I 17 / 18

FP-AI-26
FP-AI-27

FP-AI-28

FP-AI-29

Legend
Flushing/Drain
Point
Valve Open
Valve Close
Flow direction
Temporary Valve
Temporary Spool

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM
POWER GENERATION UNIT
37-K-001A - NG COMPRESSOR-LUBE OIL CIRCUITS
Att #6. Marked-up PID for Phase-I 18 / 18

FP-AI-30
FP-AI-31

FP-AI-32
FP-AI-33

Legend
Flushing/Drain
Point
Valve Open
Valve Close
Flow direction
Temporary Valve
Temporary Spool

PROJECT TITLE :

DRAWING TITLE :
PIPING AND INSTRUMENT DIAGRAM
POWER GENERATION UNIT
37-K-001B - NG COMPRESSOR-LUBE OIL CIRCUITS

You might also like