Sl. No. District Division Name of Road Total length of Crash On Bridge on Water Body (m) On Road portion (m) Remaks
Barrier (m) (m)
1 2 3 4 5=6+7+8 6 7 8 9
1 Purulia Purulia Balarampur-barabazar- 2240 900 264 1076
Higway Sidri (19-33)
Division
2 Purulia Purulia Sindri-Manbazar (0- 4860 450 4410
Higway 5KM & 9-18KM)
Division
3 Purulia Purulia Manbazar-Bansa (0- 1258 600 144 514
Higway 5.7KM)
Division
Status of Road safety works (Retrofitting=Road work completed earlier and road safety taken up later on) on different roads (Dedicated Road Safety)
Sl. District Division Name of Road AA Amount (in lakh) Status (Completed/ On-going/ Tender under Length of Road Remaks
No. process/ Estimate under preparation) (km)
1 2 3 4 5 6 7 8
1 Purulia Purulia Higway Manbazar-Bandwan- 5.84 Completed 8
Division Kuilapal (22-30km)
2 Purulia Purulia Higway Manbazar-Bansa (5.7- 4.09 Completed 4.3
Division 10km)
Status of Road safety works on different roads (taken alongwith Surfacing/ Strengthening/ Widening & strengthening projects)
Sl. District Division Name of Road AA Amount (in lakh) Status (Completed/ On-going/ Tender under Length of Road Remaks
No. process/ Estimate under preparation) (km)
1 2 3 4 5 6 7 8
1 Purulia Purulia Higway Manbazar-Bandwan- 40.28 Completed 21.17
Division Kuilapal (22-43.17
km)
2 Purulia Purulia Higway Barabazar-Bandwan 23.6 Completed 13.16
Division (0.0-3.7km & 15.54-
25.00km)
Sl. District Division Bridge location with AA amount Category (A/ B/ C) Status (Completed/ On-going/ Remaks
No. Name (in lakh) Tender under process/ Estimate
under preparation)
1 2 3 4 5 6 7 8
Status of Stressed bridges on different roads (Bridge works taken as per departmental officer's inspection report)
Sl. No. District Division Bridge location with Amount Category Status (Completed/ On-going/ Remaks
Name involved (in Tender under process/ Estimate
lakh) under preparation)
1 2 3 4 5 6 7 8