1
Voith in figures
50 42,000 5
In over
countries Employees Markets
3
Run of River Plant Storage Plant
140 Years of Major Projects
P = Q × H × ρ × g ×η
IN
OUT
2,000
1,000 Francis
~50m to ~700m
100
Kaplan
~2m to ~50m
10
Head (m)
Bulb
1
~2m to ~20m
10 100 1,000 10,000 100,000 1,000,000
Power (kW)
Pit ~2m to ~10m
Pelton
~200 m to 2,000 m
Kaplan
~2 m to 50 m
Bulb
~2 m to 20 m
11
History of hydro power turbines and pump-turbines
BHT(China)
(in planning)
turbines
900
800
Itaipu Three Gorges
(Brazil/ Paraguay) (China)
700
Longtan (China)
600
Xiao Wan (China) Xi Luo Du (China)
500
storage sets
400
Bath County
300 (USA)
Gordon (Australia) Ingula
Guangzhou II
200 (S. Africa)
Paulo Afonso II (China) Goldisthal Limberg II
Palmiet
(Brazil) (Germany) (Austria)
100 (S. Africa)
IIha Solteira
Dworshak (Brazil)
Gokcekaya
50 (USA)
(Turkey)
0
1960 1970 1980 1990 2000 2010
Year
600
Bath County (USA)
500 (2000)
Raccoon
400 (USA) Bath County (USA)
(1976)
300
200
100
0
1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010
Year
AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |
13
Logistic Challenge:
400t Stainless Steel Runner
3500
3000
2500
2000 actual
1500
1000
500 average
(765 MW)
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Palmiet
Rio Grande
1 Standstill TU-Mode 90 75 90 90 65
2 Standstill PU-Mode 340 160 230 85 80
5 SC-Mode TU-Mode 70 20 60 40 20
6 SC-Mode PU-Mode 70 50 70 30 25
8 TU-Mode PU-Mode 420 470 45 25
9 PU-Mode TU-Mode 190 90 280 60 25
Reversible PT
A – advanced conventional
B – extra fast response conventional
C – VarSpeed,
Ternary set
D – with hydraulic torque converter + hydr. short circuit, horiz, with Francis Turbine
E – same as E but vertical with Pelton Turbine
AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 | 19
Fast control of var. speed units
Effect on water hammer
1.1
DC link voltage
1 230
220
0.9
rotor speed 210
0.8 active power 200
Spiral case pressure
[mwc]
[p.u.]
0.7
190
0.6 180
0.5 170
0.4 160
GVO
150
0.3
0 5 10 15 20
Time [sec]
TVA PSExpert
AGCS ForumDays
| 2011-09-13
| Voith - Dr.
| 34Jiri Koutnik | 2013-11-04 | 20
Start up – Pump Turbine
1 min
23
Objective and goals
Start of the non-tolerable risk region One major failure tolerant in areas with
high energy flow or where the loss of
Safe region Unsafe / hazard region protection is not acceptable.
Step 1
Step 2
Step 3
Step 4
1
3. Butterfly valve or spherical
2
valve
4. Distributor or nozzles
G
5. Gate or stop log or
4
3 T
6 butterfly valve
5
6. Gate or stop log
Complete failure
of the distributor
no intake
gate
no emergency
butterfly valve
Our Safety Policy is a crucial element in the supply of our products to owners and
operators. Highest reliability and safety of our equipment safeguard capital
investment of owners on a long-term basis and sustain the balance of state-of-the
art technological standards with highest demands in this area. Technological,
economical, environmental and social responsibility are incorporated in our
values of engineered reliability.