Instrumentation Earthing

Transfer of the immediate discharge of the electrical energy directly to the earth
by means of the low resistance path is known as the earthing.

Instrumentation Earthing

Main objective of the earthing system in plant is described as below:

 It provides low impedance path to ensure the proper function of system


under fault condition
 It ensures that personnel are not exposed to unsafe potential due to
uncleared fault
 It ensures compliance to EMC requirements
 IS earth avoids ignition sources in Hazardous Area.
Items or equipment which require earthing, are but not limited to below,
 field instruments,
 control system cabinets,
 analyzer shelters,
 junction boxes,
 enclosures,
 ducts,
 cable trays,
 stanchions,
 field local panels,
 Consoles,
 Motors,
 Tanks,
 vessels,
 pipes,
 steel structure, etc.
This article mainly focuses on earthing requirements for instrumentation items of
any industrial plant.

Types

There are mainly 3 types of earthing systems provided for instrumentation.

1. Safety Earth (SE) / Dirty Earth / Protective Earth / Electrical Earth / Power
Earth
2. Instrument Earth (IE) / Electronic Earth / Reference Earth / Clean Earth /
Signal Earth
3. Intrinsic Safety (IS) Earth for IS circuit. This is only required when you have
IS instruments.
Instrument Earth

The primary aim of the instrument earth/signal earth is to provide a low


impedance path to the noise currents induced by RFI/EMI, which may result in
the induction of faulty unwanted noise signals into the analog signals.

Shields of Single pair /Multi pair analog instrument signal cables are connected
to this earth (IE).
Safety Earth

Undetected earth faults pose safety risks to personnel also may lead to safety
hazards such as equipment malfunctions, fire, and electric shock. That is why we
need electrical earth / Safety earth.

Earth Resistance

Allowable earth resistance as per codes or control system vendor


recommendation should be considered for Instrument Earthing system design.

Below is a reference table that can be updated based on the project-specific


requirement.

There should be isolation between each type of earthing mentioned above. If


there is no isolation which means that the purpose of the above earthing
requirement will not be fulfilled.

There are mainly two areas in which earthing system is envisaged.

1. Indoor (Building like control room, Switch-gear rooms etc where


cabinets/panels/consoles etc are installed)
2. Outdoor (Process area where instruments and related installation items are
installed)
Control panels inside the control room fall under the Indoor type. Depending
upon the cabinet’s functions each type of earthing bars are provided.

Control room equipment including system cabinet & marshaling cabinets, power
distribution panels, Packaged control system cabinets, Workstations, Auxiliary
consoles, printers, etc. should be considered for earthing requirement.

e.g. System and marshaling cabinets should have – SE, IE and IS Earth bars.

Network cabinets / server cabinets / Power distribution panel should have – SE


only.

Within the Cabinet, the Instrument Earth bar shall be isolated from the Safety


Earth bar by mounting the Instrument Earth bar on insulating buses.

All the instrument earth bars in the cabinets should be connected to a common
instrument earth bar provided in the false floor / Cable cellar using an insulated
redundant copper conductor cables.

This common Instrument Earth bar shall be further connected to the nearest
Instrument earth grid using copper cables.

It should be agreed with the Control system supplier for earthing philosophy of
Cabinet’s earth bar connection with the building earth bar network. E.g. Star
connection or series connection.

Earthing philosophy should cover Scope of supply, grounding wire/strip sizes,


earth stud size, wire color as a minimum.

Series Earth Connectivity


Start / point to point Earth connectivity
All the safety earth bars in the cabinets should be connected to a common safety
earth bar provided in the false floor / Cable cellar using insulated redundant
copper conductor cables.

This common Safety Earth bar shall be further connected to the nearest safety
earth grid using copper cables. The Main Earth grid conductor size can be
calculated based on the desired fault current within the required time to be
earthed.

Ultimately, this network/grid is connected to earth pits. The surrounding soil of


the earth pit must be kept moist. The effect of the soil temperature on soil
resistivity is more influencing near and below the freezing point, which will result
in the installation of the earth electrode at the depth to which frost will not
penetrate.

Good Practices

 Cable shield shall be insulated and floated at the field instrument side (Cut
and Tape). Cable Shield is the drain wire attached with Aluminum Mylar or
metal braid cover on the instrument signal cables i.e. 4-20 mA analog
signal, low voltage digital signals, etc
 Main cable (i.e. from Junction box and control room) shields shall be
grounded at one place i.e. control system end Instrument earth bar
Isolated type. All the connections to the Instrument Earth bar within the
cabinet shall be of screw type of non-corrosive metal.

Similarly, for IS cable, individual and overall shield shall be connected to the IS
earth bar inside the cabinet.

Ensure continuity of all earth cables up to earth bar & up to earth pits.

 Cable armors shall be earthed at both ends for lightning protection i.e. at


the junction box and at the control system end. Since the Junction box
body and Control system cabinet body is connected to the Safety earth
bar, cable armors are ultimately connected to the safety earth.
 All instruments (24V DC or 110 V /220V AC operated) body should be
earthed to the nearest field safety earth bar located on the Steel structure.
 Earth continuity should be ensured between tray, tray fittings, and tray
sections. This will be ensured by Earth cable/strips at every 25 meters of
tray length.
 Earth bar connection should be such that painting should not act as bad
contact between earth bar and Structure. Continuity shall be ensured.
Junction Box Earthing (Safety Earth)
Transmitter Earthing (Safety Earth)
Junction Box shield Termination on Isolated Instrument Earth terminals
Instrument Cable Tray Earthing (Safety Earth)

Instrument Earth inside the Control System cabinet (Isolated from Safety
Earth)
Safety Earth inside the Control system cabinet (Non Isolated)