Type of culvert D
Culvert No. 24
RD 04+815
Length of culvert 11.178
Cell Width 3
Cell Height 2
Top Thickness 0.4
Wall Thickness-1 0.3
Wall Thickness-2 0.3
Bottom Thickness 0.3
BAR BENDING SCHEDULE
KACH-SHAHRAG-HARNAI ROAD
A 0.4
2.6
0.4 16 125 3.400 0.082 3.318 90 2 180 597.240 1.578 942.445 Kgs
D 0.6
3.5
0.6 12 125 4.700 0.062 4.638 90 1 90 417.420 0.888 370.669 Kgs
PP 2*.06 0.2 12 250 2.320 0.124 2.196 15 2 30 65.880 0.888 58.501 Kgs
0.9
3.5
12 ------- 3.500 - 3.500 6 2 12 42.000 0.888 37.296 Kgs
2
TW * 2*.06 0.2 12 200 2.320 0.124 2.196 19 2 38 83.448 0.888 74.102 Kgs
. 0 .9
0
6
3.5 12 ------- 3.500 - 3.500 4 2 8 28.000 0.888 24.864 Kgs
10 0.046
12 0.062
16 0.082
20 0.110
Concrete Quantity of Culvert
KACH-SHAHRAG-HARNAI ROAD
BOX CULVERT NO. 24 RD 04+815 Type. D
Part of Conc
No.s Length Width Height Unit Qty
Structure Class
PPT Walls A 2 3.600 0.30 0.60 M3 1.296
Top Slab A 1 11.178 3.60 0.40 M3 16.096
Walls (side) A 2 11.178 0.30 2.00 M3 13.414
Walls (center) A 0 0.000 0.00 0.00 M3 0.000
Botom Slab A 1 11.178 3.60 0.30 M3 12.072
Fillet A 1 11.178 0.15 0.15 M3 0.503
Lean Lean 1 10.578 3.80 0.10 M3 4.020
Toe Wall A 2 3.600 0.30 0.70 M3 1.512
Toe Lean Lean 2 3.800 0.40 0.10 M3 0.304
Total Conc Class "A" M3 44.893
Total Lean Conc M3 4.324
Steel Qty (G-60) Ton 3.812
Lean Botom Slab+Toe Wall Walls,Fillet,Top & P/Wall
S
RD Cell Excave Conc
No M³ M³ Conc"A" Steel Conc"A" Steel Lean Bed A Bed Stl Top,..A Top…Stl
2 00+305.00
4 01+225.00 2 8.4
4 1+403 1 4.58
5 2+683 1 1.29
6 2+948 1 3.84
7 3+390 1 7.47
8 3+500 1 10.18
9 3+568 2
29