Professional Documents
Culture Documents
2G KPI Tool - Updated
2G KPI Tool - Updated
Query
Start Time End Time Congestion rate (%) setup success
Granularity
rate(MTN) (MTN) rate(%)
580.00% 600.00%
500.00%
480.00%
400.00%
380.00%
300.00%
280.00%
200.00%
180.00% 100.00%
80.00% 0.00%
1-Jul 2-Jul 3-Jul 4-Jul 5-Jul 6-Jul 7-Jul Total 1-Jul 2-Jul 3-Jul 4-Jul
Result
10.00% 3000000
2500000
8.00%
2.00% 500000
0.00% 0
1-Jul 2-Jul 3-Jul 4-Jul 5-Jul 6-Jul 7-Jul Total 1-Jul 2-Jul 3-Jul 4-Jul
Result
Data Sum - TCH CDR(MTN) Sum - CDR BM Data Sum - TCH traffic (Erlan
This shape represents a
2G - CSSR [%] slicer. Slicers are supported
in Excel 2010 or later.
2G - Traffic [Erl]
00000 800000
00000 700000
600000
00000
SDCCH Traffic [Erl]
500000
00000
400000
00000
300000
00000
200000
00000 100000
0 0
1-Jul 2-Jul 3-Jul 4-Jul 5-Jul 6-Jul 7-Jul Total
Result
as modified in
on of Excel, or
k was saved in
earlier, the
e used.