Professional Documents
Culture Documents
Warehouse Risk Assessment Aldir II IWPP
Warehouse Risk Assessment Aldir II IWPP
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
Comply with the requirement listed in the permit prior to start any
work.
Ensure proper work permits obtained for specific jobs and
locations
1.1 Working without valid PTW Injury, loss of property 3 3 9 3 1 3
Ensure to verify requirements for Classified areas before the
works commence.
The receiver / issuer must conduct periodically joint site inspection
and discuss the potential hazards at the area
Copy of valid work permit shall be kept available all time on site
Ensure all workers have the required HSE Inductions from Al-Dur
Phase I, prior to enter the job site. Ensure all workers have their
HSE orientation Sticker
第1页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
第2页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
第3页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
第4页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
Partitioned temporary storage areas Potential fire from storage of •Construct temporary storage structured with fire resistant material,
3.4 constructed with combustible flammable material, smoking 4 4 16 storage of hazardous combustible/flammable material as per MSDS 4 1 4
material and electrical short circuit. guidelines and fire safety assessment training for storekeepers.
第5页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
Physical harm
Can occur through attempting Mechanical handling devices shall be used wherever possible, i.e.
2 2 4 2 1 2
to lift, pull or push a load crane, rigging equipment, forklifts, pallet trucks or trolleys.
outside physical capabilities.
Can occur where loads are Personnel shall wear suitable personal protection to reduce the
2 2 4 2 1 2
handled without wearing possibility of harm.
4.1 Unsafe Manual handling suitable personal protective
equipment.
Tow persons lifting shall be utilized whenever possible (taking into
2 1 2
account the size and weight of the load to be moved)
Personnel Shall not exceed their own lifting capabilities, “do not try
Dropped Loads 2 2 4 to impress your colleagues”. If you cannot push or pull it, do not 2 1 2
attempt to lift it.
第6页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
-All hand tools used shall be inspected and marked with the color
code of the month and be in proper condition.
4.5 Improper handling of materials Pinch points, lacerations, cuts 3 3 9 3 1 3
-Hand tools safety TBT to be provided to all employees involved in
the task.
Manual handling of lifting tackles must be carried out with care by
using ropes, buckets or any other method to hand them out from
Unsafe manual handling of lifting Injury, property damage, loss
4.6 4 4 16 one work level to another up/down in a safe way. Riggers must 4 1 4
tackles of life
avoid to throw lifting tackles from one level to another, no matter
their dimensions.
第7页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
第8页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
第9页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
Working with Power Supply Electric Shock, injury to A portable fire extinguisher shall be placed near electrical panel
6.3 personnel, burns, fire, loss of 4 4 16 boards, generators etc. 4 1 4
(Continuation) property, loss of life
Post necessary sign boards like “ High Voltage”, “ Electric Shock”
etc
第 10 页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
7 LIFTING OPERATIONS
All lifting operations shall be commenced under competent
supervision and under certified Riggers only.
Serious/Fatal Injuries, The crane Operator shall be properly certified for the type of the
7.1 Unsafe Lifting 4 4 16 4 1 4
Overturn of Crane crane he is operating.
Lift plans shall be prepared and approved for all critical lift
operations as per SEPCO III procedure.
Boom shall be monitored when extended in order to avoid impact
or touch of overhead facilities, including pipelines, cable trays
and/or live power lines.
2
Outrigger pads shall be of a dimension of 1 m x 1 m (1m )
Unsafe Lifting Serious/Fatal Injuries,
7.2 4 4 16 4 1 4
(Continuation) Overturn of Crane All lifting gear such as slings, shackles etc. must have its S.W.L.
markings.
第 11 页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
Crane operator shall perform trial lift before final lifting to ensure
load is perfectly balanced.
Unsafe Lifting Lodged on or misaligned or
7.3 4 4 16 4 1 4
(Continuation) falling loads
Do not overload the rigging hardware beyond its rated capacity.
Personnel getting injured Crane Operators and riggers shall maintain a good
(Struck with Load, boom). communication between each other and the rigger shall wear hi-
Conflicting movement of crane
Structural damage, loss of viz vest.
boom and load. Lack of
property.
communication between rigger and
crane operator. Employees not Maintain safe distance from existing building or facilities in the
7.4 4 4 16 4 1 4
related to the task, invading the working area.
affected radius from the boom.
Existing facilities within the boom Mobile phones must not be used while operating within the active
radius. work area. Mobile phones shall not be in use within Classified
Areas.
Personnel getting injured Crane Operators and riggers shall maintain a good
(Struck with Load, boom). communication between each other and the rigger shall wear hi-
Structural damage, loss of viz vest.
property.
Entire lifting activity shall be supervised by a certified rigger and
shall be monitored by a competent supervisor.
Conflicting movement of crane
boom and load. Lack of
communication between rigger and The entire radius of the crane boom must be barricaded with
crane operator. Employees not relevant warning boards to restrict unauthorized movement.
related to the task, invading the
7.5 4 4 16 4 1 4
affected radius from the boom.
Existing facilities within the boom Maintain safe distance from existing building or facilities in the
radius. working area.
第 12 页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
(Continuation)
Mobile phones must not be used while operating within the active
work area
Operators and rigger shall not pass the load over workers in the
work area.
Conflicting movement of crane Work area shall be barricaded warning signs to caution against
boom and load. Lack of unauthorized entry shall be posted at appropriate work locations.
communication between rigger and
crane operator. Employees not Personnel getting injured
related to the task, invading the (Struck with Load, boom).
7.6 4 4 16 Segregation of pedestrians from work activities 4 1 4
affected radius from the boom. Structural damage, loss of
Existing facilities within the boom property.
radius.
Secure/enclose work sites where possible.
(Continuation)
第 13 页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
Oil leaks, pollution of Ensure equipment in good condition. It shall have a valid
environment Inspection Sticker approved by SEPCO III and third party
inspection
Oil leaks, pollution of Ensure equipment in good condition. It shall have a valid
environment Inspection Sticker approved by EPC Contractor and third party
inspection
4 4 16 4 1 4
第 14 页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
7.1
(Overload)
Overload limit switch shall be operable and enable.
Surfaces with High Temperatures Burns -Surface of pipelines / equipment shall be insulated, when there is
3 3 9 high likelihood of hands and body parts to be in contact with hot 3 1 3
surfaces.
Fire -Scaffolds shall be removed permanently from areas where hot
surfaces are present. However, in areas where scaffolds are still
required for temporary accesses, all wooden planks from scaffolds
8.1
3 3 9 and all combustible materials and debris shall be removed from 3 1 3
direct contact with metal surfaces which will be subject to high
temperatures.
第 15 页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
Inspections and Work inside areas Dehydration, Multiple hazards, -Where poor ventilation is identified, the atmosphere and
with high temperature burns, loss of hearing, injury, temperature will be continually monitored. Suitable monitoring
8.3 unexpected shutdowns, loss 4 4 16 equipment and personnel trained in its use will be required where 4 1 4
-Rescue equipment to be provided and all workers to wear all PPE
of property, loss of life
which may include the use of respiratory protection. Workers to be
trained in the use of monitoring equipment and evacuation
Vibration Loose of bolts/nuts from -Periodic inspections shall be carried out in order to verify that
8.4 supports. 3 3 9 bolts and nuts in pipeline, flanges and instruments in general are 3 1 3
properly tightened and vibration is not affecting their mechanical
Entrapment within risk areas Injury, burns, loss of life • Area shall be clear off obstruction & maintain proper access
• All debris removed
8.5 4 4 16 • Evacuation planned issued and communicated 4 1 4
• All emergency access and door must be release checked
Traffic Injury, loss of property, loss of -All temporary pipelines shall be protected with hard barricade in
8.6 life 3 3 9 order to avoid the trespassing of staff as well as to avoid any 3 1 3
damage from vehicles driving close to the pipelines.
Remaining Radiography Test works Commissioning and Operation -Simultaneous operations must be coordinated and assessed
in the site during the night. employees exposed to properly in order to avoid exposure of employees to Radiation due
8.7 radiation 4 4 16 to Radiography Tests. 4 1 4
Noise Loss of hearing -All staff shall observe the use of ear protection with a Noise
Reduction Rating of at least 23dB, due to the potential high noise
8.8 3 3 9 generated by the equipment in operation. 3 1 3
Welding Operations
第 16 页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
All equipment and tools intended for hot work activities shall be
regularly inspected and comply with the safety standard.
All fire inition source equipment such as welding machines and
gas cylinders shall be kept at a safe distance from the hot work
Fire and Explosion resulting to area.
Presence of Ignition source near the
9.1 serious or fatal injury or 3 2 6 3 1 3
area No storage of flammable and combustible materials allowed near
damage to property
electrically energized equipment and hot work areas.
Trained fire watchers and standby men shall be posted near the
vicinity of any hot work activities.
9.3 Over exposure to fumes Personnel injury 2 3 6 Positive pressure welding hoods shall be considered. The welder 2 1 2
should know the unhealth for the fumes.
An air respirator or mask apparatus shall be provided for works
exposed to excessive fumes.
All equipment and tools intended for hot work activities shall be
regularly inspected and in conformace with the company standard
safety practices.
Improper use of equipment and Personnel injury and property Accessory wirings, cable and controls shall be protected from
9.4 3 2 6 3 1 3
tools damage tripping hazards and not overrun by mobile equipment.
第 17 页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
Face injury 4 3 12 4 1 4
9.6 Flying object Use of face shield
第 18 页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
Barricade arround
第 19 页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
Keep fire sources away from waste storage areas (at least 5
meters).
第 20 页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
11 Working under hot severe weather Sun burn 2 2 4 Wear long sleeves. The use of hardhat, beside head protection 2 1 2
against impact, may reduce the exposition of face skin to sun.
第 21 页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
Serious personnel injury / heat Work should be pre-planned and have enough shelters and
11.2 Heat or cold stress 2 2 4
consider the work breaks and rotation of work.
2 1 2
stroke
Stop the job when poor visibility can compromise the safe
Poor visibility 3 3 9 3 1 3
continuation of the construction activities
-For those areas segregated from Al-Dur I, and under control of Al-
Dur II EPC Contractor, the Emergency Response and Crisis
Management Plan from Al-Dur II IWPP shall be followed.
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
第 23 页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
1-2 Low
No further improvement necessary. Provided control measures are maintained
3-6 Medium
Risk is tolerable when control measures identified are implemented
8 - 12
High
Further risk reduction measures must be considered
15 - 25
Extremely High
Risk Matrix
Likelihood
Severity 1 2 3 4 5
(Very
(Highly unlikely) (Unlikely) (Likely) (Certain)
Likely)
Slight injury/ First Aid 1 1 2 3 4 5
Minor / serious injury 2 2 4 6 8 10
Major injury / Lost time > 3
days
3 3 6 9 12 15
Single Fatality / Permanent
Disability
4 4 8 12 16 20
Multiple fatalities 5 5 10 15 20 25
第 24 页
SEPCOIII AL-DUR II IWPP Client: HAYA
Country: Bahrain
Likelihood
Likelihood
Severity
Severity
No. Significant Hazard Risk Effect Risk Action Risk
Rating Rating
First Contact
SEPCOIII 33836495
Madhu Mohan K HSE Deputy Manager
First Contact
REVIEWED BY APPROVED BY
Date
第 25 页
Signature