RISK ASSESSMENT
Risk Assessment Number Date Assessment Name Designation Signature & Date
Project: Prepared By: Senior HSE Officer
Activity Reviewed by: HSE Manager
Reason for Assessment Approved by: Sr Project Manager
PERSONS AT RISK
Own Employees Sub-contractors Other Workers Visitors Public
Young Persons Pregnant Women Lone Workers Disabled Other
Your estimate of the total number of people affected ---
HAZARDS
Falls from Height √ Falling Objects √ Lifting Operation Dust √ Demolition
Mobile Plant √ Mobile Vehicles Excavations Confined Space Buried Services
Overhead Service Manual Handling Vibration Noise √ Fire or Explosion √
Fumes or Gas Near or In Water Collapse √ Adverse Weather Chemical √
Health Physical (details)
Responsible
Initial Risk Rating* Residual Risk Rating*
person
HAZARD/RISK Existing Controls ADDITIONAL CONTROL MEASURES
L S (R) L S (R)
* See the Risk Assessment Matrix Chart - L- Likelihood, S- Severity, R- Risk Rating Continued? YES / NO
Control measures are required to ensure that the residual risk rating is at a minimum level so the activity can commence safely. If the activity still has a high residual risk rating then it is necessary to find another
method of carrying out the task.
Document No HSE-F-01-Rev B
This document becomes UNCONTROLLED once printed from the official CD or server location
Revision Date 14.08.2014
INTEGRATED MANAGEMENT SYSTEM
RISK ASSESSMENT
* See the Risk Assessment Matrix Chart - L- Likelihood, S- Severity, R- Risk Rating Continued? YES / NO
Control measures are required to ensure that the residual risk rating is at a minimum level so the activity can commence safely. If the activity still has a high residual risk rating then it is necessary to find another
method of carrying out the task.
Document No HSE-F-01-Rev B
This document becomes UNCONTROLLED once printed from the official CD or server location
Revision Date 14.08.2014
Risk Matrix (Severity = Probability X Consequence)
(1) Insignificant (2) Minor (3) Moderate (4) Major (5) Catastrophic
(likelihood of failure of control PROBABILITY (LIKELIHOOD
Minor injuries, which may Injuries requiring on-site treatment Serious injuries requiring off-site Single fatality. Multiple fatalities.
require self-administered by medical practitioner. Personnel treatment by medical practitioner or Major damage to structures/items Irreparable damage to highly
first aid. Injured personnel unable to continue to perform immediate evacuation to hospital. valued structures/ items/
of cultural significance, or Major
)
production loss. Production loss or delay up to one values/ sacred locations. Fines, cost to repair, plant legal liabilities, cost to repair,
measures)
Fines, cost to repair, plant week. Production loss or delay of 1 week - damage) of AED500, 000 - plant damage) of greater
damage) of less than Fines, cost to repair, plant damage) 1month. AED10M. thanAED10M.
AED5, 000. of AED5, 000 - AED50, 000. Fines, cost to repair, plant damage)
(1) Rare -
1 2 3 4 5
Never occurred
(2) Possible
2 4 6 8 10
Has occurred
Control measures are required to ensure that the residual risk rating is at a minimum level so the activity can commence safely. If the activity still has a high residual risk rating then it is necessary to find another
method of carrying out the task.
Document No HSE-F-01-Rev A
This document becomes UNCONTROLLED once printed from the official CD or server location
Revision Date 16.03.2014
(3) Likely
Occurred more 15
than once 3 6 9 12
(4) Often
year
(5) Frequent
5 12 15 20 25
Occurs frequently
Risk Legend
4-6 Moderate Activity or industry can operate subject to management and /or modification
8-12 High Activity or industry should be modified to include remedial planning and action and be subject to detailed EHS assessment.
* See the Risk Assessment Matrix Chart - L- Likelihood, S- Severity, R- Risk Rating Continued? YES / NO
Control measures are required to ensure that the residual risk rating is at a minimum level so the activity can commence safely. If the activity still has a high residual risk rating then it is necessary to find another
method of carrying out the task.
Document No HSE-F-01-Rev B
This document becomes UNCONTROLLED once printed from the official CD or server location
Revision Date 14.08.2014