Professional Documents
Culture Documents
Consent To Establish and Consent To Operate
Consent To Establish and Consent To Operate
CATEGORY OF INDUSTRY
Industries are classified into four categories by Maharastra Pollution Control Committee Based
on what your work and how much pollutants are released with that job
work/business/manufacturing.
1. White
2. Green
3. Orange
4. Red
Site proposal/index
Geographical Map
Detailed layout plant of different processes and point sources of sewage
emissions/discharges and position of stack and documents including D.G. set capability in
KVA.
Details of Water Pollution Control/Air Pollution Control instruments proposed to be
provided.
Ambient Air Quality Report
NOC from Directorate of Industries Government of Maharashtra /SSI Certificate
Maharashtra
DGTD Registration ( if applicable )
Details of chemical reactions with mass equilibrium.
Consent fees in the form of DD drawn in the favor of Pollution control board.
NOC from Local body.
Undertaking on Rs. 20 stamp paper or Chartered Accountant certificate about projected
Capital Investment ( Land, building, and other types of machinery).
Water Budget calculations
Documents required for consent to operate or renewal
Detailed layout plant of different processes and point sources of effluent or sewage
discharge or emissions and position of stack and documents including DG set capability in
KVA.
Process flow sheet.
The latest analysis report of solid waste, effluent, hazardous wastes and fuel gases
Details of Water Pollution Control or Air Pollution Control instruments provided.
Ambient Air Quality Report
NOC from Directorate of Industries Government of Maharashtra or SSI Certificate
Maharashtra.
DGTD Registration. (if applicable )
Details of chemical reactions with mass equilibrium.
Consent fees in the form of DD drawn in the favor of the Pollution Control Board.
Xerox copy of previous consent (for renewal only).
Xerox copy of Environmental Clearance of Government of Maharashtra or Government of
India in case of 1st consent to operate in case of industries or process requiring
environmental clearance.
Water budget calculations
PROCEDURE
3. SRO assign the application to Field officer. Once the field officer reviews the application,
he/she Push the application through the Integrated Management information system
(IMIS), the application status changes to "In Process". Field officer scrutinize the
application, visit the industry (for establishment and first operate) & put their
recommendation / visit report and submit it to Sub Regional Officer.
4. Now depending upon the category and the Capital Investment of the industry the
application is forwarded through IMIS as per delegation of power. Refer below
link: http://www.mpcb.gov.in/consent-under-water-and-air-act The concerned authority
will scrutinize the application, if it is fine then the application is granted in IMIS and then
status will be changed to "Approved" on the online portal followed by uploading the
signed consent copy. Otherwise if the application is not fine, then the application is
rejected in IMIS and notify the Entrepreneur by marking the application status as
"Rejected". Industry can download the consent copy from online portal.
2. SRO assign the application to Field officer. Once the field officer reviews the application,
he/she Push the application through the Internal Management information system (IMIS),
the application status changes to " In Process". Field officer scrutinize the application &
put their recommendation and submit it to Sub Regional Officer.
3. Now depending upon the category and the Capital Investment of the industry the
application is forwarded through IMIS as per delegation of power. Refer below
link: http://www.mpcb.gov.in/consent-under-water-and-air-act.
4. The concerned authority will scrutinize the application, if it is fine then the application is
granted in IMIS and then status will be changed to " Approved" on the online portal
followed by uploading the signed consent copy. Otherwise if the application is not fine,
then the application is rejected in IMIS and notify the Entrepreneur by marking the
application status as " Rejected ". Industry can download the consent copy from online
portal.
Checklist: https://gpcb.gujarat.gov.in/webcontroller/viewpage/procedures-for-pollution-related-
clearances--consents
FLOWCHART OF PROCEDURE
TAMIL NADU
https://tnpcb.gov.in/pdf/BP/Procedure-consent-with-list-of-attachment.pdf
KARNATAKA