2 3 4 5 6 7 8 9
125
Mixture
Class Cement in bag Sand cu. M.
40 kg 50 kg
AA 12 9.5 0.50
A 9 7.0 0.50
B 7.5 6.0 0.50
C 6 5.0 0.50
Vertical
Spacing length of bars in meter Spacing Layer
cm Per. Block Per. Sq M
40 cm 0.235 2.93 2 layers
60 cm 0.171 2.13 3 layers
80 cm 0.128 1.6 4 layers
1815 40 kg
1452 50kg
Gravel cu.m.
10 mm Ø
12 mm Ø
16 mm Ø
18 mm Ø
20 mm Ø
horizontal 25 mm Ø
pacing Layer
Per Block Per Sq. Meter
0.264 3.3
0.172 2.15
0.138 1.72
V.spacing 60 H.Layer2 A
V.spacing 60 H.Layer3 B
V.spacing 60 H.Layer4 C
V.spacing 80 H.Layer2 D
V.spacing 80 H.Layer3
V.spacing 80 H.Layer4
Size of wood
Frame POST BEAM
6mm( 1/4) 12mm( 1/2) 6mm (1/4) 12mm (1/2)
2"x2" 29.67 20.33 25.06 18.66
2"x3" 44.5 30.5 37.6 28
1 2 3 4 5 6
scaffolding and staging
10X20X40 Column beam
15X20X40 vert hor brace vert hor
20X20X40 2"x2" 4.70 21.00 11.70 4.00 4.70
2"x3" 7.00 31.67 17.50 6.00 7.00
2"x4" 9.35 42.25 23.35 8.00 9.35
26
flooring
6.10
9.10
12.10
SLDVR STRUCTURAL ESTIMATION
VER. 3.50
Disclaimer: These estimates are user-provided and to be used as guides only. No claim is made to their accuracy nor to their
FOR PERSONAL USE ONLY
COLUMN
SIZE H / # of Col. SIZE H / # of Col.
0.20 48.60
0.35 1.0
Class B 242
Cement 1815 40kg
Sand 121 m³
Gravel 242 m³
Rebar Length to
Size of one Footing Rebar Multiplier be used
0.85 10 6 1.6667
0
0
TOTAL 2
TABLE REFERENCE
Length
1 SIDE OF BEBARS Per Tie
1 SIDE OF FOOTING BEBARS LENGTH FOOTING LENGTH Size of Coulmn (meter)
0.40 0.25 2.35 2.20 0.20 x 0.25 0.828
0.45 0.30 2.40 2.25 0.20 x 0.30 0.928
0.50 0.35 1.40 1.25 0.20 x 0.35 1.028
0.55 0.40 1.45 1.30 0.20 x 0.40 1.128
0.60 0.45 1.50 1.35 0.20 x 0.45 1.228
0.65 0.50 1.55 1.40 0.20 x 0.50 1.328
0.70 0.55 1.60 1.45 0.20 x 0.55 1.428
0.75 0.60 1.65 1.50 0.20 x 0.60 1.528
0.80 0.65 1.70 1.55 0.25 x 0.30 1.028
0.85 0.70 1.75 1.60 0.20 x 0.35 1.128
0.90 0.75 1.80 1.65 0.25 x 0.40 1.228
0.95 0.80 1.85 1.70 0.20 x 0.45 1.328
1.00 0.85 3.00 1.75 0.20 x 0.50 1.428
1.05 0.90 1.95 1.80 0.20 x 0.55 1.528
1.10 0.95 2.00 1.85 0.20 x 0.60 1.628
1.15 1.00 2.05 1.90 20x20 0.72
1.20 1.05 2.10 1.95 20x15 0.62
1.25 1.10 2.15 2.00 15x30 0.82
1.30 1.15 2.20 2.05 25x25 0.92
1.35 1.20 2.25 2.10 15x40 1.02
2.30 2.15 25x35 1.12
15x15 0.52
ATION
o claim is made to their accuracy nor to their completeness for all uses. Each estimate is provided as a basic guide or template for building upon. Prices
3.221
Total # of Rebars 162
Beam
Column Height: Length 2"x3"
No. Of Columns: No. of Beams 1 7.00
0 m² 0 m² 0 bd. Ft
Horizontal 2"x2"
Suport 21.00
Plywood: 0 sheets Plywood: 0 sheets 0 bd. Ft
0
mplate for building upon. Prices may need updating and quantities are estimated based on size of job.
CONCRETE WALLS
ND STAGING SUMMARY
BEAMS CONCRETE SLAB Column
length Area Width Vert. Hor. Braces
#of Beam lngth 2"x2" 0.0 0.0 0.0
0 meters multiplyier 1 2"x3" 0.0 0.0 0.0
0 m² 2"x4" 0.0 0.0 0.0
vertical 2"x3" Plywood
Suport 6.00 Support 2"x3"
0 bd. Ft 9.10
Horizonta 2"x2" 0.0 bd. Ft
l Suport 4.70 Plywood 0 sheets
0 bd. Ft
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
-
MORTAR PLASTER
Area: 0.0 m² Area: 0 m² MORTAR & PLASTER
Size Of CHB Class Mixture Class Plaster Thickness Concrete
10X20X40 A A 12 mm 0
0 0
E
ET
GS
0 0
CR
GS
E
BA
T
N
RE
BA
CO
0 0
NC
CO
Sand 0 m³ 0
Sand 0 m³
FORMS
Beams Slab Column Beam Total
Vert. Hor.
0.0 0.0 0 0 0 0 bd. Ft
0.0 0.0 0 0 0 0 bd. Ft
0.0 0.0 0 0 0 0 bd. Ft
0 0 0 0 Sheets
3.2
4.75
0.75
0.3
0 0 0 0 0
0 0 0 0 0