.00.

2 3 4 5 6 7 8 9

125
Mixture
Class Cement in bag Sand cu. M.
40 kg 50 kg
AA 12 9.5 0.50
A 9 7.0 0.50
B 7.5 6.0 0.50
C 6 5.0 0.50

Vertical
Spacing length of bars in meter Spacing Layer
cm Per. Block Per. Sq M
40 cm 0.235 2.93 2 layers
60 cm 0.171 2.13 3 layers
80 cm 0.128 1.6 4 layers

Kilograms per Square M


H. Layer 25cm Tie.
V.spacing 40 H.Layer2 25cm 2 0.054
V.spacing 40 H.Layer2 30cm 3 0.039
V.spacing 40 H.Layer2 40cm 4 0.024
2 0.036
V.spacing 40 H.Layer3 25cm 3 0.026
V.spacing 40 H.Layer3 30cm 4 0.020
V.spacing 40 H.Layer3 40cm 2 0.027
3 0.020
V.spacing 40 H.Layer4 25cm 4 0.015
V.spacing 40 H.Layer4 30cm Tie
V.spacing 40 H.Layer4 40cm Tie

V.spacing 60 H.Layer2 25cm Tie


V.spacing 60 H.Layer2 30cm Tie
V.spacing 60 H.Layer2 40cm Tie
V.spacing 60 H.Layer3 25cm tie
V.spacing 60 H.Layer3 30cm tie
V.spacing 60 H.Layer3 40cm tie

V.spacing 60 H.Layer4 25cm Tie


V.spacing 60 H.Layer4 30cm Tie
V.spacing 60 H.Layer4 40cm Tie

V.spacing 80 H.Layer2 25cm Tie


V.spacing 80 H.Layer2 30cm Tie
V.spacing 80 H.Layer2 40cm Tie

V.spacing 80 H.Layer3 25cm tie


V.spacing 80 H.Layer3 30cm tie
V.spacing 80 H.Layer3 40cm tie

V.spacing 80 H.Layer4 25cm Tie


V.spacing 80 H.Layer4 30cm Tie
V.spacing 80 H.Layer4 40cm Tie
10 11 12 13 14 15 16 17
2"x2"
2"x3"
2"x4"

1815 40 kg
1452 50kg
Gravel cu.m.

1.0 Column slab


1.0 30.618 40kg 0 40kg
1.0 23.814 50kg 0 50kg
1.0

10 mm Ø
12 mm Ø
16 mm Ø
18 mm Ø
20 mm Ø
horizontal 25 mm Ø
pacing Layer
Per Block Per Sq. Meter
0.264 3.3
0.172 2.15
0.138 1.72

Kilograms per Square Meter


30 cm Tie. 40cm Tie
0.065 0.086
0.047 0.063 8 mm A
0.029 0.039 12 mm B
0.044 0.057 16 mm C
0.032 0.042 20 mm D
0.024 0.032 25 mm
0.033 0.044
0.024 0.032
0.018 0.024

V.spacing 60 H.Layer2 A
V.spacing 60 H.Layer3 B
V.spacing 60 H.Layer4 C
V.spacing 80 H.Layer2 D
V.spacing 80 H.Layer3
V.spacing 80 H.Layer4

Bars Spacing in CM Number of


steel bars per
square meter Column1 Column2 Column3
6.00 M 7.50 M 9.00 M 12.00 M
10 cm 4.369 3.337 2.772 2.022
12.5 cm 3.603 2.662 2.245 1.635
15 cm 3.221 2.296 1.921 1.382
17.5 cm 2.647 2.025 1.65 1.196
20 cm 2.36 1.775 1.461 1.056
22.5 cm 2.168 1.601 1.312 0.907
25 cm 1.977 1.466 1.217 0.862
Bars Spacing in CM Number of
steel bars per
square meter Column1 Column2 Column3
6.00 M 7.50 M 9.00 M 12.00 M
10 cm 3.764 2.937 2.421 1.769
12.5 cm 3.062 2.381 1.934 1.427
15 cm 2.584 2.004 1.636 1.197
17.5 cm 2.232 1.726 1.407 1.033
20 cm 1.98 1.528 1.258 0.914
22.5 cm 1.786 1.369 1.109 0.81
25 cm 1.627 1.25 1.014 0.736
18 19 20 21 22 23 24 25

Size of wood
Frame POST BEAM
6mm( 1/4) 12mm( 1/2) 6mm (1/4) 12mm (1/2)
2"x2" 29.67 20.33 25.06 18.66
2"x3" 44.5 30.5 37.6 28

2"x2" 6mm(1/4) 29.67 25.06


2"x3" 6mm(1/4) 44.5 37.6
2"x2" 12mm(1/2) 20.33 18.66
2"x3" 12mm(1/2) 30.5 28

1 2 3 4 5 6
scaffolding and staging
10X20X40 Column beam
15X20X40 vert hor brace vert hor
20X20X40 2"x2" 4.70 21.00 11.70 4.00 4.70
2"x3" 7.00 31.67 17.50 6.00 7.00
2"x4" 9.35 42.25 23.35 8.00 9.35
26

flooring

6.10
9.10
12.10
SLDVR STRUCTURAL ESTIMATION
VER. 3.50
Disclaimer: These estimates are user-provided and to be used as guides only. No claim is made to their accuracy nor to their
FOR PERSONAL USE ONLY
COLUMN
SIZE H / # of Col. SIZE H / # of Col.
0.20 48.60
0.35 1.0

Mixture Class A 3.402 m³


Cement 31 40kg bags
Sand 1.80 m³
Gravel 3.402 m³
48.6
space of tie # of tie per space Check 48.6
0.05 3 0.15 1.9
0.10 8 0.8
0.18 265.9 46.7 lngth
# of Ties 287.9 1.028 lngth of one tie
# of 10mm 295.9171
TOTAL: 50.00 lngth

48.60 Height Of one Column Rebar


Length to
4 Number of vertical rebars per Column be used
33 Total Number of vertical rebars 6
FOOTING
1.00 Size 1210 # of columns
1.00 Size
0.20 Thickness
242 Total Volume of Footings

Class B 242
Cement 1815 40kg
Sand 121 m³
Gravel 242 m³
Rebar Length to
Size of one Footing Rebar Multiplier be used
0.85 10 6 1.6667
0
0

TOTAL 2
TABLE REFERENCE
Length
1 SIDE OF BEBARS Per Tie
1 SIDE OF FOOTING BEBARS LENGTH FOOTING LENGTH Size of Coulmn (meter)
0.40 0.25 2.35 2.20 0.20 x 0.25 0.828
0.45 0.30 2.40 2.25 0.20 x 0.30 0.928
0.50 0.35 1.40 1.25 0.20 x 0.35 1.028
0.55 0.40 1.45 1.30 0.20 x 0.40 1.128
0.60 0.45 1.50 1.35 0.20 x 0.45 1.228
0.65 0.50 1.55 1.40 0.20 x 0.50 1.328
0.70 0.55 1.60 1.45 0.20 x 0.55 1.428
0.75 0.60 1.65 1.50 0.20 x 0.60 1.528
0.80 0.65 1.70 1.55 0.25 x 0.30 1.028
0.85 0.70 1.75 1.60 0.20 x 0.35 1.128
0.90 0.75 1.80 1.65 0.25 x 0.40 1.228
0.95 0.80 1.85 1.70 0.20 x 0.45 1.328
1.00 0.85 3.00 1.75 0.20 x 0.50 1.428
1.05 0.90 1.95 1.80 0.20 x 0.55 1.528
1.10 0.95 2.00 1.85 0.20 x 0.60 1.628
1.15 1.00 2.05 1.90 20x20 0.72
1.20 1.05 2.10 1.95 20x15 0.62
1.25 1.10 2.15 2.00 15x30 0.82
1.30 1.15 2.20 2.05 25x25 0.92
1.35 1.20 2.25 2.10 15x40 1.02
2.30 2.15 25x35 1.12
15x15 0.52
ATION
o claim is made to their accuracy nor to their completeness for all uses. Each estimate is provided as a basic guide or template for building upon. Prices

SLAB SLAB REINFORCEMENTS


Other
Thickness Volume other
Width Width 10.00
Length Length 5.00
0.00 0.00 0.00 50.00 0.00 0.00
Rebars Spacing: Lenth of Bar to be used:
Mixture Class A 0.00 m³ 1 way slab 25 cm
Concrete 0 40kg 1.014
Sand - m³ Total # of Rebars 51
Gravel 0 m³

Rebars Spacing: Lenth of Bar to be used:


2 way slab 15 cm

3.221
Total # of Rebars 162

FORMS FOR COLUMNS FORMS FOR BEAMS SCAFFOLDING AND STAGING


Plywood Form Plywood Form COLUMNS
P= P= 2 Sides length
bottom No. of Clm
0.20 m² 0.10 m² 0 meters

Beam
Column Height: Length 2"x3"
No. Of Columns: No. of Beams 1 7.00
0 m² 0 m² 0 bd. Ft
Horizontal 2"x2"
Suport 21.00
Plywood: 0 sheets Plywood: 0 sheets 0 bd. Ft

POST POST Diagonal 2"x2"


2"x2" 6mm( 1/4) 2"x3" 6mm (1/4) Braces 11.70
0 bd. Ft. 0 bd. Ft. 0 bd. Ft
Length Per
Size of Column Tie (meter)
0.45 x 0.50 1.828
0.45 x 0.55 1.928
0.45 x 0.60 2.028
0.50 x 0.55 2.028
0.50 x 0.60 2.128
0.55 x 0.60 2.228
0.25 x 0.25 0.928
0.30 x 0.30 1.128
0.35 x 0.35 1.328
0.40 x 0.40 1.528
0.45 x 0.45 1.728
0.50 x 0.50 1.928
0.55 x 0.55 1.128
0.60 x 0.60 2.328
30x40 1.32
15x25x40 1.48
35x60 1.82
30x35 1.22
35x55 1.72
45x30 1.42
30x60 1.72
35x65 1.92

0
mplate for building upon. Prices may need updating and quantities are estimated based on size of job.

CONCRETE WALLS

WALL Size hieght


Total width
50.00 m² Area 0 0 0 0 0 0
Lenth of Bar to be used: Deducted Area:
9.00 M 0.0 0 0 0 0 0
Total area 0.0
Lngth CHB 0
CHB Rebars
Vertical Spaced at 60 cm
Lenth of Bar to be used: Rebars: 0.00
6.00 M Horizontal Spaced at 3 layers
Rebars: 0.00
1.014 Total rebars 0.00 lngth 10 mm Ø
Lngth

ND STAGING SUMMARY
BEAMS CONCRETE SLAB Column
length Area Width Vert. Hor. Braces
#of Beam lngth 2"x2" 0.0 0.0 0.0
0 meters multiplyier 1 2"x3" 0.0 0.0 0.0
0 m² 2"x4" 0.0 0.0 0.0
vertical 2"x3" Plywood
Suport 6.00 Support 2"x3"
0 bd. Ft 9.10
Horizonta 2"x2" 0.0 bd. Ft
l Suport 4.70 Plywood 0 sheets
0 bd. Ft
0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0

-
MORTAR PLASTER
Area: 0.0 m² Area: 0 m² MORTAR & PLASTER
Size Of CHB Class Mixture Class Plaster Thickness Concrete
10X20X40 A A 12 mm 0
0 0
E
ET

GS

0 0
CR

GS
E
BA

T
N

RE

BA
CO

0 0
NC
CO

Sand 0 m³ 0
Sand 0 m³

FORMS
Beams Slab Column Beam Total
Vert. Hor.
0.0 0.0 0 0 0 0 bd. Ft
0.0 0.0 0 0 0 0 bd. Ft
0.0 0.0 0 0 0 0 bd. Ft
0 0 0 0 Sheets
3.2
4.75
0.75
0.3
0 0 0 0 0

0 0 0 0 0

MORTAR & PLASTER TOTAL


Concrete Sand
bags 0 m³
6.37
5.87 7.7
24.95 23.2
9.48 4 2*2 5
10.22 0.3
0.69 2.7
0.8 5.13
0.6 1.34
12.31 0.45
30 0.43