SKIKDA, ALGERIA
OPERATING MANUAL VOLUME II, SECTION 1-6:
UNIT 07 LPG REINJECTION
KBR
JOB NO.: J6404
1 24-Sept- SS RM
KM Re-Issued for Implementation
2013
TABLE OF CONTENTS
1.0 INTRODUCTION ................................................................................................... 3
2.0 SYSTEM DESCRIPTION ...................................................................................... 5
3.0 OPERATIONS....................................................................................................... 6
3.1 Normal Running ................................................................................................................6
3.1.1 Butane Reinjection Cooler, 07-MC09 .............................................................................6
3.1.2 LPG Reinjection Drum, 07-MD08 ...................................................................................6
3.1.3 LPG Reinjection Pump, 07-MJ04 & 07-MJ04A ..............................................................6
3.2 Typical Operating Parameters ..........................................................................................7
3.3 Temporary Operation ........................................................................................................7
4.0 START-UP ............................................................................................................ 8
4.1 Prior to Start-up .................................................................................................................8
4.2 LPG Reinjection System Start-up .....................................................................................8
5.0 SHUTDOWN ....................................................................................................... 10
5.1 Normal Shutdown ...........................................................................................................10
5.2 Process Upsets / Production Loss ..................................................................................10
6.0 SAFETY/EMERGENCY SHUTDOWN ................................................................ 12
6.1 Safety Critical Shutdown Systems ..................................................................................12
6.1.1 I-0720 – LPG Reinjection Backflow Protection ............................................................12
6.1.2 I-0780 – 07-MD08 LPG Reinjection Drum Isolation .....................................................12
6.1.3 I-0791 – Fractionation Area Depressure ......................................................................12
6.2 Pressure Safety Valve Summary ....................................................................................13
6.3 Fire Protection Equipment ..............................................................................................14
7.0 ATTACHMENTS ................................................................................................. 15
7.1 Attachment I: Equipment List ..........................................................................................16
7.2 Attachment II: Utility Consumption .................................................................................17
Page 2 of 17
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-126
OPERATING MANUAL VOLUME II, SECTION 1-6: REVISION 1
LPG REINJECTION 24-Sept-2013
1.0 INTRODUCTION
This operating manual relates to the facilities indicated on Process Flow Diagram
PR-07-PR32-005 and P&ID’s PR-07-SYPI-012 through PR-07-SYPI-013.
The purpose of the LPG Reinjection Unit is:
• To combine the high purity ethane, propane, butane and isopentane streams
from the Fractionation Unit and re-inject into the Main Cryogenic Heat Exchanger,
15-MC05, as LNG product during the ‘No LPG Extraction’ mode of operation.
• To enhance LPG recovery from the Fractionation Unit by providing a LPG recycle
stream to the Scrub Column, 15-MD01, overheads during the ‘LPG Extraction’ &
‘No LPG Extraction’ modes of operation.
• To control the BTU content of the LNG product
Refer to sketch on the next page for a simplified process flow diagram of the LPG
Reinjection System and its associated equipment.
Page 3 of 17 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-126
OPERATING MANUAL VOLUME II, SECTION 1-6: REVISION 1
LPG REINJECTION 24-Sept-2013
Page 4 of 17 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-126
OPERATING MANUAL VOLUME II, SECTION 1-6: REVISION 1
LPG REINJECTION 24-Sept-2013
Page 5 of 17 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-126
OPERATING MANUAL VOLUME II, SECTION 1-6: REVISION 1
LPG REINJECTION 24-Sept-2013
3.0 OPERATIONS
3.1 Normal Running
This section provides a description of the operating parameters for the LPG
Reinjection System. Refer to Section 3.2 for a list of typical operating variables for
this system.
3.1.1 Butane Reinjection Cooler, 07-MC09
Butane product from the Fractionation Unit is cooled in the Butane Reinjection
Cooler, 07-MC09, combined with the ethane and propane product streams and
collected in the LPG Reinjection Drum, 07-MD08.
The Butane Reinjection Cooler, 07-MC09, is a kettle-type shell and tube heat
exchanger with LP liquid propane from the external propane refrigeration system is
used as refrigerant. The exchanger receives refrigerant from the MR/MP LPG
Propane Cooler, 20-MC06, and cools the butane to -34ºC before sending to the LPG
Reinjection Drum, 07-MD08. Butane flow to the exchanger is controlled by flow
controller 07-FIC-1352 which throttles valve 07-FV-1352 via low select block 07-FY-
1352.
Propane refrigerant level on the shell side of the exchanger is controlled by 07-LIC-
1134, which adjusts the amount of liquid propane received from the MR/MP LPG
Propane Cooler, 20-MC06, through the valve 07-LV-1134. Cooling in the exchanger
is accomplished by vaporizing liquid propane. Propane vapors from the exchanger
are directed towards the LP Propane Suction Drum, 20-MD01.
3.1.2 LPG Reinjection Drum, 07-MD08
Liquid ethane, propane, and butane streams from the Fractionation Unit are
combined in the LPG Reinjection Drum, 07-MD08, and reinjected into the Main
Cryogenic Heat Exchanger, 15-MC05. Liquid level in the drum is controlled by level
controller 07-LIC-1137 which provides a set-point to flow controller 07-FIC-1140 or
07-FIC-1166 via hand switch 07-HS-1137. Controller 07-FIC-1140 throttles valve 07-
FV-1140 to adjust the LPG reinjection rate to the Main Cryogenic Heat Exchanger,
15-MC05, while controller 07-FIC-1166 throttles valve 07-FV-1166 to vary the LPG
recycle rate to the overheads of the Scrub Column, 15-MD01.
The LPG Reinjection Drum pressure is controlled by dual pressure controllers
07-PIC-1366A and B. The 07-PIC-1366A is a low-range controller which opens valve
07-PV-1366A to bring gas from the Demethanizer, 07-MD01, while high-range
controller 07-PIC-1366B limits system pressure by venting LPG vapors to the cold
flare header via 07-PV-1366B.
3.1.3 LPG Reinjection Pump, 07-MJ04 & 07-MJ04A
There are two LPG Reinjection Pumps, 07-MJ04 & 07-MJ04A; one is on stand-by.
The pumps are provided with a minimum flow bypass line and a discharge flow
controller 07-FIC-1274 which throttles valve 07-FV-1274 to control liquid flow
returned to the LPG Reinjection Drum, 07-MD08.
The first pump is started manually from the DCS while DCS program K-0781
automatically starts the stand-by pump when low pressure is detected by 07-PSL-
1203 in the common discharge line. Both pumps can be stopped manually from the
DCS.
Page 6 of 17 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-126
OPERATING MANUAL VOLUME II, SECTION 1-6: REVISION 1
LPG REINJECTION 24-Sept-2013
Page 7 of 17 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-126
OPERATING MANUAL VOLUME II, SECTION 1-6: REVISION 1
LPG REINJECTION 24-Sept-2013
4.0 START-UP
This section outlines the steps necessary to place the LPG Reinjection System in
service. For the purpose of this section of the operating manual, it is assumed that
the following conditions exist: utilities are in service, fractionation unit is available,
downstream units are ready for feed gas, plant dryout and cool down has been
completed, and system is purged and ready for start-up.
4.1 Prior to Start-up
1. Confirm that the External Propane Refrigeration System, Unit 20, is ready to
supply propane refrigerant to the Ethane Reinjection Cooler 07-MC21, Propane
Product Cooler 07-MC15, and Butane Reinjection Cooler, 07-MC09. The
refrigeration load on Unit 20 will increase as the exchanger is brought online.
2. Confirm that normal propane liquid level is established in the Butane Reinjection
Cooler, 07-MC09, and its level controller 07-LIC-1134 placed in automatic.
3. Confirm that the Main Cryogenic Heat Exchanger, 15-MC05, is ready to receive
feed from the LPG Reinjection Drum, 07-MCD08.
4. Confirm that all the Fractionation columns including Demethanizer, Deethanizer,
Depropanizer, Debutanizer, and Deisopentanizer are in stable operating
condition with forward feed flow.
5. Confirm that depressurization valve 07-BDV-1224 at the overhead of the LPG
Reinjection Drum is lined up to the cold flare header and closed.
6. Confirm that the following control valves are placed under manual control, and
fully closed:
07-FV-1049: Ethane product to LPG Reinjection
07-FV-1088: Propane Product to LPG Reinjection
07-FV-1140: LPG Reinjection to Main Cryogenic Heat Exchanger
07-FV-1352: Butane Product to LPG Reinjection
07-FV-1166: LPG Reinjection to Scrub Column, 15-MD01, overheads
07-FV-1569: Isopentane product from 07-MC26
07-PV-1366A: LPG Reinjection Drum 07-MD08
07-PV-1366B: LPG Reinjection Drum 07-MD08 vent to cold flare
07-FV-1274: minimum flow of LPG Reinjection Pumps 07-MJ04/04A.
7. Confirm that the following ESDV valves are in closed position:
07-ESDV-1114: LPG Reinjection to Main Cryogenic Heat Exchanger, 15-MC05
07-ESDV-1209: LPG Reinjection Drum, 07-MD08, bottoms isolation valve
07-ESDV-1223: LPG Reinjection to Scrub Column, 15-MD01, overheads
07-ESDV-1071: Demethanizer overhead to LPG Reinjection Drum 07-MD08
Page 8 of 17 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-126
OPERATING MANUAL VOLUME II, SECTION 1-6: REVISION 1
LPG REINJECTION 24-Sept-2013
Page 9 of 17 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-126
OPERATING MANUAL VOLUME II, SECTION 1-6: REVISION 1
LPG REINJECTION 24-Sept-2013
5.0 SHUTDOWN
5.1 Normal Shutdown
The following steps are based on a planned shutdown of the LPG Reinjection
System.
A shutdown of Unit 07 will be done by reducing the feed to the unit and is typically
done in conjunction with a planned shut-down of the Liquefaction unit, Unit 15.
1. Reduce LNG production to minimum turndown rate. As the LNG production
decreases, liquid rate from the Fractionation Unit to LPG reinjection will
decrease proportionally.
2. Reduce ethane product flow to the LPG Reinjection Drum, 07-MD08, to zero via
flow controller 07-FIC-1049. Similarly, propane and butane product flow to the
LPG Reinjection Drum is reduced to zero via flow controllers 07-FIC-1088 and
07-FIC-1352, respectively. Reduce isopentane product flow to the Main
Cryogenic Heat Exchanger, 15-MC05, to zero via flow controller 07-FIC-1569.
When the feed flow is reduced to zero, place all flow controllers on manual and
closed.
3. Reduce LPG recycle flow to the Scrub Column, 15-MD01, overheads to zero via
flow controller 07-FIC-1166. Place flow controller on manual and closed.
4. As the feed to the LPG Reinjection Drum, 07-MD08, is reduced to zero, level
controller 07-LIC-1137 will gradually reduce LPG reinjection flow to the Main
Cryogenic Heat Exchanger, 15-MC05, to zero by providing a set-point to flow
controller 07-FIC-1140 via hand switch 07-HS-1137. When the flow is reduced
to zero, place flow controller on manual and closed.
5. The LPG Reinjection Pumps, 07-MJ04/A will eventually be placed on total
recycle with minimum flow to the LPG Reinjection Drum.
6. If the shutdown is only for a short duration, the system can be left in full recycle
so that the subsequent restart can be shortened.
7. If the shutdown is for prolonged period of time, then the LPG Reinjection
Pumps, 07-MJ04/A, can be shut down and the drum contents disposed to flare.
Do not depressure drum until liquid inventory has been removed.
5.2 Process Upsets / Production Loss
In the event of a change in conditions or trips, the process may become upset and
possibly require shutdown. The LPG Reinjection system should be shut down as
outlined above. Below are possible causes for upset and actions to be taken.
1. Loss of Electrical Power
Loss of electrical power to the LPG Reinjection Pump, 07-MJ04/A, will cause the
level in the LPG Reinjection Drum, 07-MD08, to rise until the spare pump is
activated. LPG Reinjection Drum pressure is maintained with controller 07-PIC-
1366B venting to cold flare. If electric power to the spare pump cannot be established
in a short duration, all feeds to the drum including ethane, propane and butane
should be stopped via their respective flow controllers 07-FIC-1049, 07-FIC-1088,
and 07-FIC-1352.
Page 10 of 17 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-126
OPERATING MANUAL VOLUME II, SECTION 1-6: REVISION 1
LPG REINJECTION 24-Sept-2013
Page 11 of 17 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-126
OPERATING MANUAL VOLUME II, SECTION 1-6: REVISION 1
LPG REINJECTION 24-Sept-2013
Page 12 of 17 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-126
OPERATING MANUAL VOLUME II, SECTION 1-6: REVISION 1
LPG REINJECTION 24-Sept-2013
Set Pressure
Valve Number Description/Location
(barg)
Page 13 of 17 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-126
OPERATING MANUAL VOLUME II, SECTION 1-6: REVISION 1
LPG REINJECTION 24-Sept-2013
Description Quantity
CEA - Fractionation
Page 14 of 17 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-126
OPERATING MANUAL VOLUME II, SECTION 1-6: REVISION 1
LPG REINJECTION 24-Sept-2013
7.0 ATTACHMENTS
The following attachments are included in this section of the Operating Manual:
7.1 Attachment I: Equipment List
7.2 Attachment II: Utility Consumption
Page 15 of 17 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-126
OPERATING MANUAL VOLUME II, SECTION 1-6: REVISION 1
LPG REINJECTION 24-Sept-2013
Design Design
Equipment
Description Pressure Temp
No.
(barg) (ºC)
Page 16 of 17 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-126
OPERATING MANUAL VOLUME II, SECTION 1-6: REVISION 1
LPG REINJECTION 24-Sept-2013
Available
Equipment No. Description Motor Load
(kW)
Page 17 of 17 KBR