Fcaole Das Apr21 May5 2021

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Name: FROILAN CAOLE Cut-off Period: APR.21 - MAY.

5
Dept./Outlet: FIBERGEN ODN Schedule: Mon-Fri
Position: SPLICER Day-Off: Sunday

DAILY TIME RECORD:_______FIBERHOME___ (Client Name)


Schedule AM PM Total #
Remarks / Activities
Date IN OUT IN OUT IN OUT of Hrs
WAPOG : DATU ESMAEL,VICTORIA REYES, STA.CRUZ 1&2, LORENZO RUIZ 1, STA. LUCIA, SAN MANUEL 1&2, SAN MIGUEL 1&2,
4/21/21 7:00 AM 4:00 PM 6:50 AM 2:00 AM SAN SIMON, SAN ANDRES 2, STA.CRISTINA 1&2, SAN ROQUE, SAN NICOLAS 1&2, SAN MATEO : MAIN FEEDER & SUB-FEEDER
CABLE & FIBER VERIFICATION, INSERTION & TROUBLESHOOTING.

4/22/21 7:00 AM 4:00 PM 6:50 AM 2:00 AM WAPOG : SAN MANUEL 1&2, SAN MIGUEL 1&2, STA.LUCIA : ODN CABLE LINKING.

4/23/21 7:00 AM 4:00 PM 6:50 AM 10:00 PM WAPOG : EAST HIS WITH SHS: ODN SPLICING & SITE CLEARING
4/24/21 7:00 AM 4:00 PM 6:50 AM 1:00 AM WAPOG : DASMA FEEDER : 216 ODF SPLICING & RECTIFICATION

4/25/21 7:00 AM 4:00 PM 6:50 AM 1:00 AM WAPOG : DASMA FEEDER : TERMINATION OF 216 ODF/ 144 CORES & RECTIFICATION

4/26/21 7:00 AM 4:00 PM 6:50 AM 2:00 AM WAPOG : DASMA FEEDER - CONTINUATION OF TERMINATION 216 ODF/ 72 CORES & RECTIFICATION

4/27/21 7:00 AM 4:00 PM 6:50 AM 8:00 PM WAPOG : ZAPOTE 5, TALABA 6, MOLINO 2, NIOG: ODN CABLE LINKING

4/28/21 7:00 AM 4:00 PM 6:50 AM 2:00 AM WAPOG : TALABA 3,5&6, MOLINO 2, NIOG : VIRTUAL INSERTION WITH PLDT CORENET

4/29/21 7:00 AM 4:00 PM 6:50 AM 10:00 PM WAPOG : PALICO 1 & PH1: CROSSPATCHING, INSERTION & ODN CABLE LINKING.
WAPOG : ZAPOTE 5, TALABA 3&6, SAN ANDRES 2, SAN SIMON,, SAN ROQUE, CRISTINA 1&2 : SITE VIRTUAL
4/30/21 7:00 AM 4:00 PM 6:50 AM 2:00 AM ACCEPTANCE, BUROL MAIN, MAMBOG 4, MAMBOG ES : SITE INSERTION & LINKING. MAMBOG 4: PRETESTING,
TROUBLESHOOT & RECTIFICATION
WAPOG : MAMBOG ES, SAN JOSE, SABANG, DATU ESMAEL : PRETESTING, TROUBLESHOTING & RECTIFICATION
5/1/21 7:00 AM 4:00 PM 6:50 AM 1:00 AM
WAPOG : DASMA EAST, VICTORIA REYES : PRETEST & TROUBLESHOOT @ EAST HIS. REGROOMED RESPLICED
5/2/21 7:00 AM 4:00 PM 6:50 AM 8:00 PM
TROUBLESHOOT @ VICTORIA.
WAPOG :MAMBOG ES, SAN JOSE, SABANG, DATU ESMAEL, GAWARAN, ABAD SANTOS : CROSS PATCHING @
5/3/21 7:00 AM 4:00 PM 6:50 AM 2:00 AM GAWARAN, VIRTUAL ACCEPTANCE @ MAMBOG ES & SAN JOSE, PREPARED & SPLICED 1LCP, 4 NAPS, STENCILING,
SITE CLEARING @ ABAD SANTOS.
WAPOG : SAN MATEO, VICTORIA REYES, SABANG, GAWARAN : VIRTUAL ACCEPTANCE, FINALIZED OPTICAL/
5/4/21 7:00 AM 4:00 PM 6:50 AM 7:00 PM PHYSICAL DEFICIENCY.
5/5/21 7:00 AM 4:00 PM 6:50 AM 8:00 PM WAPOG :SAN ANDRES 1, BUROL MAIN : ODN SPLICING

Regular Days Regular OT WDO WDO OT


No. of Lates Night Diff LH LH OT
No. of Absences SH SH OT
Prepared By: Checked By: Noted By:
CAOLE, FROILAN _______________ ____________________
Date Hired 13-Apr-16
Name: FROILAN CAOLE Cut-off Period: APR.21 - MAY.5
Dept./Outlet: FIBERGEN ODN Schedule: Mon-Fri
Position: Splicer Day-Off: Sunday
Date Area of Assignment Time In Time Out Authorized Signature Remarks Amount
SOUTH LUZON-DATU ESMAEL,VICTORIA REYES, STA.CRUZ 1&2,
4/21/21 6:50 AM 2:00 AM 150
LORENZO RUIZ 1, STA. LUCIA, SAN MANUEL 1&2, SAN MIGUEL 1&2,
4/22/21 SAN SIMON,
SOUTH SAN ANDRES
LUZON-SAN 2, STA.CRISTINA
MANUEL 1&2, SAN
1&2, SAN MIGUEL 1&2,ROQUE, SAN
STA.LUCIA 6:50 AM 2:00 AM 150
4/23/21 SOUTH LUZON-EAST HIS WITH SHS 6:50 AM 10:00 PM 150
4/24/21 SOUTH LUZON - DASMA FEEDER 6:50 AM 1:00 AM 150
4/25/21 SOUTH LUZON-DASMA FEEDER 6:50 AM 1:00 AM 150
4/26/21 SOUTH LUZON-DASMA FEEDER 6:50 AM 2:00 AM 150
4/27/21 SOUTH LUZON-ZAPOTE 5, TALABA 6, MOLINO 2, NIOG 6:50 AM 8:00 PM 150
4/28/21 SOUTH LUZON- TALABA 3,5&6, MOLINO 2, NIOG 6:50 AM 2:00 AM 150
4/29/21 SOUTH LUZON-PALICO 1 & PH1 6:50 AM 10:00 PM 150
SOUTH LUZON-ZAPOTE 5, TALABA 3&6, SAN ANDRES 2, SAN SIMON,
4/30/21 6:50 AM 2:00 AM 150
SAN ROQUE, CRISTINA 1&2
5/1/21 SOUTH LUZON-MAMBOG ES, SAN JOSE, SABANG, DATU ESMAEL 6:50 AM 1:00 AM 150
5/2/21 SOUTH LUZON - DASMA EAST, VICTORIA REYES 6:50 AM 8:00 PM 150
SOUTH LUZON - MAMBOG ES, SAN JOSE, SABANG, DATU ESMAEL,
5/3/21 6:50 AM 2:00 AM 150
GAWARAN, ABAD SANTOS

5/4/21 SOUTH LUZON - SAN MATEO, VICTORIA REYES, SABANG, GAWARAN 6:50 AM 7:00 PM 150
5/5/21 SOUTH LUZON - SAN ANDRES 1, BUROL MAIN 6:50 AM 8:00 PM 150
TOTAL 2,250.00

Submitted By: Reviewed By: Noted By:

FROILAN CAOLE
OFFICIAL BUSINESS FORM

NAME FROILAN CAOLE DATE OF REQUEST 06-May-21


POSITION SPLICER TRAVEL ASSIGNMENT LOCATION
TRAVEL PERIOD
DATE OF DEPARTURE TIME OF DEPARTURE SOUTH LUZON
DATE OF ARRIVAL TIME OF ARRIVAL AREA OF ASSIGNMENT

AREA OF ASSIGNMENT AND THE PERIOD


DATE TIME PLACE OF OB REMARKS

4/21/21 6:50 AM 2:00 AM SOUTH LUZON-DATU ESMAEL,VICTORIA REYES, STA.CRUZ 1&2, LO


SOUTH LUZON-SAN MANUEL 1&2, SAN MIGUEL 1&2,
4/22/21 6:50 AM 2:00 AM
STA.LUCIA
4/23/21 6:50 AM 10:00 PM SOUTH LUZON-EAST HIS WITH SHS
4/24/21 6:50 AM 1:00 AM SOUTH LUZON - DASMA FEEDER
4/25/21 6:50 AM 1:00 AM SOUTH LUZON - DASMA FEEDER
4/26/21 6:50 AM 2:00 AM SOUTH LUZON-DASMA FEEDER
4/27/21 6:50 AM 8:00 PM SOUTH LUZON-ZAPOTE 5, TALABA 6, MOLINO 2, NIOG
4/28/21 6:50 AM 2:00 AM SOUTH LUZON- TALABA 3,5&6, MOLINO 2, NIOG
4/29/21 6:50 AM 10:00 PM SOUTH LUZON-PALICO 1 & PH1
SOUTH LUZON-ZAPOTE 5, TALABA 3&6, SAN ANDRES 2, SAN
4/30/21 6:50 AM 2:00 AM
SIMON, SAN ROQUE, CRISTINA 1&2
SOUTH LUZON-MAMBOG ES, SAN JOSE, SABANG, DATU
5/1/21 6:50 AM 1:00 AM
ESMAEL
5/2/21 6:50 AM 8:00 PM SOUTH LUZON - DASMA EAST, VICTORIA REYES
SOUTH LUZON - MAMBOG ES, SAN JOSE, SABANG, DATU
5/3/21 6:50 AM 2:00 AM
ESMAEL, GAWARAN, ABAD SANTOS
SOUTH LUZON - SAN MATEO, VICTORIA REYES, SABANG,
5/4/21 6:50 AM 7:00 PM
GAWARAN
5/5/21 6:50 AM 8:00 PM SOUTH LUZON - SAN ANDRES 1, BUROL MAIN

CATEGORIES DETAILS
AIRFARE
HOTEL ACCOMODATION
VEHICLE GOING TO AIRPORT
VEHICLE FROM AIRPORT TO OFFICE
VEHICLE WHILE IN THE AREA OF ASSIGNMENT
VEHICLE FROM AIRTPORT TO HOUSE

REQUESTED BY REVIEWED BY NOTED BY RECEIVED BY

FROILAN CAOLE

MEMBERS NAME/SIGNATURE IMMEDIATE SUPERIOR AUTHORIZED PERSON HUMAN RESOURCES


OVERTIME FORM
NAME FROILAN CAOLE DATE OF REQUEST 06-May-21
POSITION SPLICER DEPARTMENT FIBERGEN
PROJECT FIBERHOME DARE HIRED 13-Apr-16

DETAILS
DATE TIME IN TIME OUT REGULAR NIGHT SHIFT WEEKEND HOLIDAY REMARKS
WAPOG : DATU ESMAEL,VICTORIA REYES, STA.CRUZ 1&2, LORENZO RUIZ 1, STA. LUCIA, SAN
MANUEL 1&2, SAN MIGUEL 1&2, SAN SIMON, SAN ANDRES 2, STA.CRISTINA 1&2, SAN ROQUE,
4/21/21 4:00 PM 2:00 AM 10.00 SAN NICOLAS 1&2, SAN MATEO : MAIN FEEDER & SUB-FEEDER CABLE & FIBER VERIFICATION,
INSERTION & TROUBLESHOOTING.
WAPOG : SAN MANUEL 1&2, SAN MIGUEL 1&2, STA.LUCIA : ODN CABLE LINKING.
4/22/21 4:00 PM 2:00 AM 10.00
WAPOG : EAST HIS WITH SHS: ODN SPLICING & SITE CLEARING
4/23/21 4:00 PM 10:00 PM 06.00
WAPOG : DASMA FEEDER : 216 ODF SPLICING & RECTIFICATION
4/24/21 4:00 PM 1:00 AM 09.00
WAPOG : DASMA FEEDER : TERMINATION OF 216 ODF/ 144 CORES & RECTIFICATION
4/25/21 6:50 AM 1:00 AM 17.00
WAPOG : DASMA FEEDER - CONTINUATION OF TERMINATION 216 ODF/ 72 CORES &
4/26/21 4:00 PM 2:00 AM 10.00 RECTIFICATION
WAPOG : ZAPOTE 5, TALABA 6, MOLINO 2, NIOG: ODN CABLE LINKING
4/27/21 4:00 PM 8:00 PM 04.00
WAPOG : TALABA 3,5&6, MOLINO 2, NIOG : VIRTUAL INSERTION WITH PLDT CORENET
4/28/21 4:00 PM 2:00 AM 10.00
WAPOG : PALICO 1 & PH1: CROSSPATCHING, INSERTION & ODN CABLE LINKING.
4/29/21 4:00 PM 10:00 PM 06.00
WAPOG : ZAPOTE 5, TALABA 3&6, SAN ANDRES 2, SAN SIMON,, SAN ROQUE, CRISTINA 1&2 :
4/30/21 4:00 PM 2:00 AM 10.00 SITE VIRTUAL ACCEPTANCE, BUROL MAIN, MAMBOG 4, MAMBOG ES : SITE INSERTION &
LINKING. MAMBOG 4: PRETESTING, TROUBLESHOOT & RECTIFICATION
WAPOG : MAMBOG ES, SAN JOSE, SABANG, DATU ESMAEL : PRETESTING, TROUBLESHOTING &
5/1/21 6:50 AM 1:00 AM 17.00 RECTIFICATION
WAPOG : DASMA EAST, VICTORIA REYES : PRETEST & TROUBLESHOOT @ EAST HIS.
5/2/21 6:50 AM 8:00 PM 12.00 REGROOMED RESPLICED TROUBLESHOOT @ VICTORIA.
WAPOG : MAMBOG ES, SAN JOSE, SABANG, DATU ESMAEL, GAWARAN, ABAD SANTOS : CROSS
5/3/21 4:00 PM 2:00 AM 10.00 PATCHING @ GAWARAN, VIRTUAL ACCEPTANCE @ MAMBOG ES & SAN JOSE, PREPARED &
SPLICED 1LCP, 4 NAPS, STENCILING, SITE CLEARING @ ABAD SANTOS.
WAPOG : SAN MATEO, VICTORIA REYES, SABANG, GAWARAN : VIRTUAL ACCEPTANCE,
5/4/21 4:00 PM 7:00 PM 03.00 FINALIZED OPTICAL/ PHYSICAL DEFICIENCY.
WAPOG :SAN ANDRES 1, BUROL MAIN : ODN SPLICING
5/5/21 4:00 PM 8:00 PM 04.00

TOTAL OVERTIME HOURS 92.00 29.00 17.00 EXCESS OT, PLS. CHECK APPROVED @ SUPERVISOR IN-CHARGE

SUBMITTED BY REVIEWED BY NOTED BY CHECKED BY CLIENT

FROILAN CAOLE

MEMBERS NAME/SIGNATURE IMMEDIATE SUPERIOR AUTHORIZED PERSON HUMAN RESOURCES

You might also like