Dept./Outlet: FIBERGEN ODN Schedule: Mon-Fri
Position: SPLICER Day-Off: Sunday
4/22/21 7:00 AM 4:00 PM 6:50 AM 2:00 AM WAPOG : SAN MANUEL 1&2, SAN MIGUEL 1&2, STA.LUCIA : ODN CABLE LINKING.
4/23/21 7:00 AM 4:00 PM 6:50 AM 10:00 PM WAPOG : EAST HIS WITH SHS: ODN SPLICING & SITE CLEARING
4/24/21 7:00 AM 4:00 PM 6:50 AM 1:00 AM WAPOG : DASMA FEEDER : 216 ODF SPLICING & RECTIFICATION
4/25/21 7:00 AM 4:00 PM 6:50 AM 1:00 AM WAPOG : DASMA FEEDER : TERMINATION OF 216 ODF/ 144 CORES & RECTIFICATION
4/26/21 7:00 AM 4:00 PM 6:50 AM 2:00 AM WAPOG : DASMA FEEDER - CONTINUATION OF TERMINATION 216 ODF/ 72 CORES & RECTIFICATION
4/27/21 7:00 AM 4:00 PM 6:50 AM 8:00 PM WAPOG : ZAPOTE 5, TALABA 6, MOLINO 2, NIOG: ODN CABLE LINKING
4/28/21 7:00 AM 4:00 PM 6:50 AM 2:00 AM WAPOG : TALABA 3,5&6, MOLINO 2, NIOG : VIRTUAL INSERTION WITH PLDT CORENET
4/29/21 7:00 AM 4:00 PM 6:50 AM 10:00 PM WAPOG : PALICO 1 & PH1: CROSSPATCHING, INSERTION & ODN CABLE LINKING.
WAPOG : ZAPOTE 5, TALABA 3&6, SAN ANDRES 2, SAN SIMON,, SAN ROQUE, CRISTINA 1&2 : SITE VIRTUAL
4/30/21 7:00 AM 4:00 PM 6:50 AM 2:00 AM ACCEPTANCE, BUROL MAIN, MAMBOG 4, MAMBOG ES : SITE INSERTION & LINKING. MAMBOG 4: PRETESTING,
TROUBLESHOOT & RECTIFICATION
WAPOG : MAMBOG ES, SAN JOSE, SABANG, DATU ESMAEL : PRETESTING, TROUBLESHOTING & RECTIFICATION
5/1/21 7:00 AM 4:00 PM 6:50 AM 1:00 AM
WAPOG : DASMA EAST, VICTORIA REYES : PRETEST & TROUBLESHOOT @ EAST HIS. REGROOMED RESPLICED
5/2/21 7:00 AM 4:00 PM 6:50 AM 8:00 PM
TROUBLESHOOT @ VICTORIA.
WAPOG :MAMBOG ES, SAN JOSE, SABANG, DATU ESMAEL, GAWARAN, ABAD SANTOS : CROSS PATCHING @
5/3/21 7:00 AM 4:00 PM 6:50 AM 2:00 AM GAWARAN, VIRTUAL ACCEPTANCE @ MAMBOG ES & SAN JOSE, PREPARED & SPLICED 1LCP, 4 NAPS, STENCILING,
SITE CLEARING @ ABAD SANTOS.
WAPOG : SAN MATEO, VICTORIA REYES, SABANG, GAWARAN : VIRTUAL ACCEPTANCE, FINALIZED OPTICAL/
5/4/21 7:00 AM 4:00 PM 6:50 AM 7:00 PM PHYSICAL DEFICIENCY.
5/5/21 7:00 AM 4:00 PM 6:50 AM 8:00 PM WAPOG :SAN ANDRES 1, BUROL MAIN : ODN SPLICING
5/4/21 SOUTH LUZON - SAN MATEO, VICTORIA REYES, SABANG, GAWARAN 6:50 AM 7:00 PM 150
5/5/21 SOUTH LUZON - SAN ANDRES 1, BUROL MAIN 6:50 AM 8:00 PM 150
TOTAL 2,250.00
FROILAN CAOLE
OFFICIAL BUSINESS FORM
CATEGORIES DETAILS
AIRFARE
HOTEL ACCOMODATION
VEHICLE GOING TO AIRPORT
VEHICLE FROM AIRPORT TO OFFICE
VEHICLE WHILE IN THE AREA OF ASSIGNMENT
VEHICLE FROM AIRTPORT TO HOUSE
FROILAN CAOLE
DETAILS
DATE TIME IN TIME OUT REGULAR NIGHT SHIFT WEEKEND HOLIDAY REMARKS
WAPOG : DATU ESMAEL,VICTORIA REYES, STA.CRUZ 1&2, LORENZO RUIZ 1, STA. LUCIA, SAN
MANUEL 1&2, SAN MIGUEL 1&2, SAN SIMON, SAN ANDRES 2, STA.CRISTINA 1&2, SAN ROQUE,
4/21/21 4:00 PM 2:00 AM 10.00 SAN NICOLAS 1&2, SAN MATEO : MAIN FEEDER & SUB-FEEDER CABLE & FIBER VERIFICATION,
INSERTION & TROUBLESHOOTING.
WAPOG : SAN MANUEL 1&2, SAN MIGUEL 1&2, STA.LUCIA : ODN CABLE LINKING.
4/22/21 4:00 PM 2:00 AM 10.00
WAPOG : EAST HIS WITH SHS: ODN SPLICING & SITE CLEARING
4/23/21 4:00 PM 10:00 PM 06.00
WAPOG : DASMA FEEDER : 216 ODF SPLICING & RECTIFICATION
4/24/21 4:00 PM 1:00 AM 09.00
WAPOG : DASMA FEEDER : TERMINATION OF 216 ODF/ 144 CORES & RECTIFICATION
4/25/21 6:50 AM 1:00 AM 17.00
WAPOG : DASMA FEEDER - CONTINUATION OF TERMINATION 216 ODF/ 72 CORES &
4/26/21 4:00 PM 2:00 AM 10.00 RECTIFICATION
WAPOG : ZAPOTE 5, TALABA 6, MOLINO 2, NIOG: ODN CABLE LINKING
4/27/21 4:00 PM 8:00 PM 04.00
WAPOG : TALABA 3,5&6, MOLINO 2, NIOG : VIRTUAL INSERTION WITH PLDT CORENET
4/28/21 4:00 PM 2:00 AM 10.00
WAPOG : PALICO 1 & PH1: CROSSPATCHING, INSERTION & ODN CABLE LINKING.
4/29/21 4:00 PM 10:00 PM 06.00
WAPOG : ZAPOTE 5, TALABA 3&6, SAN ANDRES 2, SAN SIMON,, SAN ROQUE, CRISTINA 1&2 :
4/30/21 4:00 PM 2:00 AM 10.00 SITE VIRTUAL ACCEPTANCE, BUROL MAIN, MAMBOG 4, MAMBOG ES : SITE INSERTION &
LINKING. MAMBOG 4: PRETESTING, TROUBLESHOOT & RECTIFICATION
WAPOG : MAMBOG ES, SAN JOSE, SABANG, DATU ESMAEL : PRETESTING, TROUBLESHOTING &
5/1/21 6:50 AM 1:00 AM 17.00 RECTIFICATION
WAPOG : DASMA EAST, VICTORIA REYES : PRETEST & TROUBLESHOOT @ EAST HIS.
5/2/21 6:50 AM 8:00 PM 12.00 REGROOMED RESPLICED TROUBLESHOOT @ VICTORIA.
WAPOG : MAMBOG ES, SAN JOSE, SABANG, DATU ESMAEL, GAWARAN, ABAD SANTOS : CROSS
5/3/21 4:00 PM 2:00 AM 10.00 PATCHING @ GAWARAN, VIRTUAL ACCEPTANCE @ MAMBOG ES & SAN JOSE, PREPARED &
SPLICED 1LCP, 4 NAPS, STENCILING, SITE CLEARING @ ABAD SANTOS.
WAPOG : SAN MATEO, VICTORIA REYES, SABANG, GAWARAN : VIRTUAL ACCEPTANCE,
5/4/21 4:00 PM 7:00 PM 03.00 FINALIZED OPTICAL/ PHYSICAL DEFICIENCY.
WAPOG :SAN ANDRES 1, BUROL MAIN : ODN SPLICING
5/5/21 4:00 PM 8:00 PM 04.00
TOTAL OVERTIME HOURS 92.00 29.00 17.00 EXCESS OT, PLS. CHECK APPROVED @ SUPERVISOR IN-CHARGE
FROILAN CAOLE