This document provides calculations for excavation and concrete work for a circular water tank including excavation of over 10,000 cubic feet of area, stone blasting of 829 square feet, 0.5 feet of PCC over 414 square feet, a foundation of nearly 1,000 square feet, a reinforced concrete wall of around 485 square feet, and a roof of nearly 478 square feet along with other details like brick work.
This document provides calculations for excavation and concrete work for a circular water tank including excavation of over 10,000 cubic feet of area, stone blasting of 829 square feet, 0.5 feet of PCC over 414 square feet, a foundation of nearly 1,000 square feet, a reinforced concrete wall of around 485 square feet, and a roof of nearly 478 square feet along with other details like brick work.
This document provides calculations for excavation and concrete work for a circular water tank including excavation of over 10,000 cubic feet of area, stone blasting of 829 square feet, 0.5 feet of PCC over 414 square feet, a foundation of nearly 1,000 square feet, a reinforced concrete wall of around 485 square feet, and a roof of nearly 478 square feet along with other details like brick work.