Daily Report
Daily Report
Description Completion
4 Manhole 51 37 0 37 72.55%
Page | 1
DAILY PHOTO REPORT
Date: …25/11/2020….
A1. Pipe installation from B-SMH-06 to B-SMH-07 A2. Sand bedding and watering for pipe installation
(24m) from B-SMH-06 to B-SMH-07 (24m)
A3. Concrete slab installation for Pipe installation from A4. Concrete cuter from B-SMH-06 to B-SMH-07
B-SMH06 to B-SMH07
Page | 2
Comment: ………………………
Page | 3
DAILY PLAN WORK FOR TOMORROW
Project: 115kv underground transmission line in Sihanoukville
Date: 26/11/2020
B-SMH-06
B-SMH-07