12july2021 - M&E Team Daily Work Plan & Performance (For Telecommuter)

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 69

Daily Work Plan & Performance ( For Telecom

□ Project : Petronas Podium(Lot LL1M) Name : Lim Chean Chong

DATE WORK PLAN

check and review schindler shop drawing

check and review schindler MS resubmission

check and review LC Elec For-con dwg

check and review LC ELV For-con dwg


01/06/21
Tuesday
Review and checking GA drawing

meeting with schindler regarding Lift


drawing coordination issue

meeting with Jalex regarding nilai mockup

check and review schindler shop drawing

check and review schindler MS resubmission

check and review LC Elec For-con dwg

02/06/21
check and review LC ELV For-con dwg
Wednesday

Review and checking GA drawing

attend meeting with Jalex regarding nilai


mockup
attend pre- BIM TCM

check and review schindler shop drawing

check and review schindler MS resubmission

check and review LC Elec For-con dwg

03/06/21
check and review LC ELV For-con dwg
Thursday

Review and checking GA drawing

attend M&E PM meeting

attend BIM TCM

check and review schindler shop drawing

check and review schindler MS resubmission

check and review LC Elec For-con dwg


04/06/21
Friday
check and review LC ELV For-con dwg

Review and checking GA drawing

meeting with schindler regarding Lift


drawing coordination issue

check and review schindler shop drawing

check and review schindler MS resubmission

05/06/21
To Issue LC Elec For-con dwg
Saturday
05/06/21
Saturday

To issue LC ELV For-con dwg

Review and checking GA drawing

check and review schindler shop drawing

check and review schindler MS resubmission

To Issue LC Elec For-con dwg


07/06/21
Monday
To issue LC ELV For-con dwg

Review and checking GA drawing

meeting with schindler regarding Lift


drawing coordination issue

check and review schindler shop drawing

check and review schindler MS resubmission

08/06/21
To Issue LC Elec For-con dwg
Tuesday

To issue LC ELV For-con dwg

Review and checking GA drawing

check and review schindler shop drawing

check and review schindler MS resubmission

To Issue LC Elec For-con dwg


09/06/21
Wednesday
To issue LC ELV For-con dwg
09/06/21
Wednesday

Review and checking GA drawing

attend pre- BIM TCM

check and review schindler shop drawing

check and review schindler MS resubmission

To Issue LC Elec For-con dwg

10/06/21
check and review LC ELV For-con dwg
Thursday

Review and checking GA drawing

attend M&E PM meeting

attend BIM TCM

check and review schindler shop drawing

check and review schindler MS resubmission

check and review LC Elec For-con dwg


11/06/21
Friday
check and review LC ELV For-con dwg

Review and checking GA drawing

meeting with schindler regarding Lift


drawing coordination issue

check and review schindler shop drawing

To Issue LC Elec For-con dwg


12/06/21
Saturday
12/06/21
Saturday
To issue LC ELV For-con dwg

Review and checking GA drawing

check and review schindler shop drawing

To Issue LC Elec For-con dwg

14/06/21
To issue LC ELV For-con dwg
Monday

Review and checking GA drawing

meeting with schindler regarding Lift


drawing coordination issue
an & Performance ( For Telecommuter)
Name : Lim Chean Chong

ACTUAL OUTCOME
check and review schindler shop drawing- schindler submited lift R8R9 dwg,
R8R9 commented

pending schindler pending schindler

check and review LC Elec For-con dwg final review by BIM team

check and review LC ELV For-con dwg pending cabnet

Review and checking GA drawing checking revised utility box GA dwg

meeting with schindler regarding Lift done


drawing coordination issue

res-schedule 2/6 res-schedule 2/6

meeting with CHT- SECM regarding LC cable


done
tray for-con comments
Daily Work Plan & Performance ( For Telecomm

□ Project : Petronas Podium(Lot LL1M) Name : Soon

Date Work Plan

External Work To get PTW approval


01/Jun(Tue) Design GA Coordination (Daily) To coordinate design issue
LC For-Con To review subcon drawing

External Work To get PTW approval


02/Jun(Wed) Design GA Coordination (Daily) To coordinate design issue
LC For-Con To review subcon drawing
External Work To get PTW approval
MTS/MS submission To review subcon submission
03/Jun(Thu)
LC For-Con To review subcon drawing
Attend meeting MEP PM meeting, BIM TCM
External Work To get PTW approval
Design GA Coordination (Daily) To coordinate design issue
04/Jun(Fri)
LC For-Con To review subcon drawing
LP4 ISD dwg To review subcon drawing
Design GA Coordination (Daily) To coordinate design issue
05/Jun(Sat) MTS/MS submission To review subcon submission
LP4 ISD dwg To review subcon drawing
External Work To get PTW approval
Design GA Coordination (Daily) To coordinate design issue
08/Jun(Tue)
Attend meeting MEP TCM
Review T&C plan To review subcon T&C plan
External Work To get PTW approval
Design GA Coordination (Daily) To coordinate design issue
09/Jun(Wed)
LC For-Con To review subcon drawing
Review T&C plan To review subcon T&C plan
External Work To get PTW approval

MTS/MS submission To review subcon submission


10/Jun(Thu)
10/Jun(Thu)
Review T&C plan To review subcon T&C plan

Attend meeting MEP PM meeting, BIM TCM

External Work To get PTW approval

Design GA Coordination (Daily) To coordinate design issue


11/Jun(Fri)
Review T&C plan To review subcon T&C plan

LP4 ISD dwg To review subcon drawing

Design GA Coordination (Daily) To coordinate design issue


12/Jun(Sat)
Review T&C plan To review subcon T&C plan

External Work To get PTW approval

Design GA Coordination (Daily) To coordinate design issue


14/Jun(Mon)
Review T&C plan To review subcon T&C plan

Attend meeting Discussion with CHT


nce ( For Telecommuter)

Actual Outcome

Send work schedule to KLCCP

In-progress
In-progress
Daily Work Plan & Performance ( For Telecommuter)

□ Project : Petronas Podium(Lot LL1M) Name : Chok Leong Min

Date Work Plan Actual

1. BIM 5D Quantification
01/Jun(Tue) a. Computation Quantity of Material from BIM a. naviswork computation BIM model to quantity save to excel file
for VO ACMV

1. BIM 5D Quantification
02/Jun(Wed) a. Computation Quantity of Material from BIM

1. BIM 6D Material Tracking


a. Sustainability equiment schedule
03/Jun(Thu)
2) M&E PM meeting

1. BIM 6D Material Tracking


04/Jun(Fri) a. Sustainability equiment schedule

1. BIM 4D construction sequencing


05/Jun(Sat) a. Planning & Scheduling

1. BIM 4D construction sequencing


a. Planning & Scheduling
08/Jun(Tue)
2. 7D BIM-FMIS meeting
1. BIM 4D construction sequencing
09/Jun(Wed) a. Planning & Scheduling

1. BIM 5D Quantification
a. Computation Quantity of Material from BIM
10/Jun(Thu)
2. M&E PM meeting

1. BIM 5D Quantification
11/Jun(Fri) a. Computation Quantity of Material from BIM

1. RTS Laser layout


12/Jun(Sat) a.Marking rod point

1. BIM 4D construction sequencing


14/Jun(Mon) a. Planning & Scheduling
mmuter)

Outcome

Target to complete (2/6)


Daily Work Plan & Performanc
□ Project : Petronas Podium(Lot LL1M) Name : Ummu

Date Work Plan


Weekly progress
report
PO
Official VO
submission

01/Jun(Tue)

VO document
preparation

Monthly electrical
usage

PO

May PPC

Weekly PM
meeting
Covid-19
Daily Work Plan &
Performance
Official VO
submission
02/Jun(Wed)

VO document
preparation

Monthly electrical
usage

May PPC

Weekly PM
meeting
Official VO
submission

03/Jun(Thu)

VO document
preparation
03/Jun(Thu)

VO document
preparation

04/Jun(Fri) Ann

05/Jun(Sat) Ann

Weekly progress
report

May PPC
Official VO
submission

07/Jun(Mon)

VO document
preparation
VO document
preparation

Weekly progress
report

May PPC

Temporary
Material, Labour
Template

Official VO
submission

08/Jun(Tue)

VO document
preparation
Weekly progress
report

May PPC
Weekly PM
meeting
Official VO
submission

09/Jun(Wed)

VO document
preparation

May PPC
Weekly PM
meeting
Official VO
submission

10/Jun(Thu)

VO document
preparation
10/Jun(Thu)

VO document
preparation

11/Jun(Fri) Ann

Weekly progress
report

Official VO
submission

14/Jun(Mon)

VO document
preparation
Daily Work Plan & Performance ( For Telecommuter)
Lot LL1M) Name : Ummu

Work Plan
1) Prepare internal progress meeting material

1) Verify SECM PO QTY with Contract BQ

1) Follow up with CHT on unofficial VO submission

1) Verify BMESB-02 (RFI-00555)


- Title: Additional cold water sanitary plumbing
(CWSP) piping for LP1 BOH Toilet
2) Verify BMESB-04 (RFI-00468)
- Title: Additional Scupper & Tank Scour Pit
Discharge System
3) Verify CSSB-01 (RFI-627)
- Title: Additional Data Point for ID Media Wall&
Floor mounted Directory or Signage
4) Verify EMCS-02 (RFI-627)
- Title: EMCS interfacing for Additional FCU to
serve core wall area from Level P4 to Level 4

5) Verify BMESB-06(CD01)
- Title: Additional FT for Toilets Level C to Level 5

1) Provide electrical consumption to Control team

1) Verify SECM PO QTY with Contract BQ

1) Verify SECM work with site people

2) Prepare May PPC

1) Follow up last meeting minutes


1) Compile vaccination status
1) Compile M&E team daily work plan &
performance
1) Follow up with CHT on unofficial VO submission

1) Verify BMESB-02 (RFI-00555)


- Title: Additional cold water sanitary plumbing
(CWSP) piping for LP1 BOH Toilet
2) Verify BMESB-04 (RFI-00468)
- Title: Additional Scupper & Tank Scour Pit
Discharge System
3) Verify CSSB-01 (RFI-627)
- Title: Additional Data Point for ID Media Wall&
Floor mounted Directory or Signage

4) Verify EMCS-02 (RFI-627)


- Title: EMCS interfacing for Additional FCU to
serve core wall area from Level P4 to Level 4

5) Verify BMESB-06(CD01)
- Title: Additional FT for Toilets Level C to Level 5

1) Provide electrical consumption to Control team

1) Verify SECM work with site people

2) Prepare May PPC

1) Prepare meeting minutes

1) Follow up with CHT on unofficial VO submission

1) Verify BMESB-02 (RFI-00555)


- Title: Additional cold water sanitary plumbing
(CWSP) piping for LP1 BOH Toilet
2) Verify BMESB-04 (RFI-00468)
- Title: Additional Scupper & Tank Scour Pit
Discharge System
3) Verify CSSB-01 (RFI-627)
- Title: Additional Data Point for ID Media Wall&
Floor mounted Directory or Signage

4) Verify EMCS-02 (RFI-627)


- Title: EMCS interfacing for Additional FCU to
serve core wall area from Level P4 to Level 4

5) Verify BMESB-06(CD01)
- Title: Additional FT for Toilets Level C to Level 5

Annual Leave

Annual Leave

1) Prepare Seoul Office Report

2) Prepare internal progress meeting material

3) Prepare & send out Submission & Approval List

1) Prepare May PPC

1) Prepare for official submission

1) Verify BMESB-02 (RFI-00555)


- Title: Additional cold water sanitary plumbing
(CWSP) piping for LP1 BOH Toilet
2) Verify BMESB-04 (RFI-00468)
- Title: Additional Scupper & Tank Scour Pit
Discharge System
3) Verify CSSB-01 (RFI-627)
- Title: Additional Data Point for ID Media Wall&
Floor mounted Directory or Signage
4) Verify EMCS-02 (RFI-627)
- Title: EMCS interfacing for Additional FCU to
serve core wall area from Level P4 to Level 4

5) Verify BMESB-06(CD01)
- Title: Additional FT for Toilets Level C to Level 5

1) Prepare internal progress meeting material

2) Prepare & send out Submission & Approval List

1) Prepare May PPC

1) Monthly actual update

1) Prepare for official submission

1) Verify BMESB-02 (RFI-00555)


- Title: Additional cold water sanitary plumbing
(CWSP) piping for LP1 BOH Toilet
2) Verify BMESB-04 (RFI-00468)
- Title: Additional Scupper & Tank Scour Pit
Discharge System
3) Verify CSSB-01 (RFI-627)
- Title: Additional Data Point for ID Media Wall&
Floor mounted Directory or Signage

4) Verify EMCS-02 (RFI-627)


- Title: EMCS interfacing for Additional FCU to
serve core wall area from Level P4 to Level 4

5) Verify BMESB-06(CD01)
- Title: Additional FT for Toilets Level C to Level 5
1) Prepare & send out Submission & Approval List

1) Prepare May PPC

1) Follow up last meeting minute

1) Prepare for official submission

1) Verify BMESB-02 (RFI-00555)


- Title: Additional cold water sanitary plumbing
(CWSP) piping for LP1 BOH Toilet
2) Verify BMESB-04 (RFI-00468)
- Title: Additional Scupper & Tank Scour Pit
Discharge System
3) Verify CSSB-01 (RFI-627)
- Title: Additional Data Point for ID Media Wall&
Floor mounted Directory or Signage

4) Verify EMCS-02 (RFI-627)


- Title: EMCS interfacing for Additional FCU to
serve core wall area from Level P4 to Level 4

5) Verify BMESB-06(CD01)
- Title: Additional FT for Toilets Level C to Level 5

1) Prepare May PPC

1) Prepare meeting minute

1) Prepare for official submission

1) Verify BMESB-02 (RFI-00555)


- Title: Additional cold water sanitary plumbing
(CWSP) piping for LP1 BOH Toilet
2) Verify BMESB-04 (RFI-00468)
- Title: Additional Scupper & Tank Scour Pit
Discharge System
3) Verify CSSB-01 (RFI-627)
- Title: Additional Data Point for ID Media Wall&
Floor mounted Directory or Signage

4) Verify EMCS-02 (RFI-627)


- Title: EMCS interfacing for Additional FCU to
serve core wall area from Level P4 to Level 4

5) Verify BMESB-06(CD01)
- Title: Additional FT for Toilets Level C to Level 5

Annual Leave

1) Prepare Seoul Office Report

2) Prepare internal progress meeting material

3) Prepare & send out Submission & Approval List

1) Prepare for official submission

1) Verify BMESB-02 (RFI-00555)


- Title: Additional cold water sanitary plumbing
(CWSP) piping for LP1 BOH Toilet
2) Verify BMESB-04 (RFI-00468)
- Title: Additional Scupper & Tank Scour Pit
Discharge System
3) Verify CSSB-01 (RFI-627)
- Title: Additional Data Point for ID Media Wall&
Floor mounted Directory or Signage

4) Verify EMCS-02 (RFI-627)


- Title: EMCS interfacing for Additional FCU to
serve core wall area from Level P4 to Level 4

5) Verify BMESB-06(CD01)
- Title: Additional FT for Toilets Level C to Level 5
ormance ( For Telecommuter)

Actual Outcome
1) Done target date: 1/06/2021

1) In-progress target date: 1/06/2021

1) Done, waiting reply from Mr Wong CHT target date: 1/06/2021

1) In-progress target date: 05/05/2021

2) Pending resubmission from BME target date: 12/05/2021

NA target date: 22/05/2021

3) Pending resubmission from SOYL, to


target date: 22/05/2021
resubmit by 05/06/2021

5) In-progress. Pending resubmission from BME target date: 27/05/2021

target date: 11/06/2021


(Official date)

target date: 2/06/2021

target date: 3/06/2021


target date: 11/06/2021
(Official date)
target date: 2/06/2021
target date: 2/06/2021

target date: 2/06/2021

target date: 2/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 11/06/2021


(Official date)

target date: 3/06/2021


target date: 11/06/2021
(Official date)
target date: 3/06/2021

target date: 3/06/2021

target date: 14/06/2021

target date: 14/06/2021


target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021

Annual Leave

Annual Leave

target date: 7/06/2021

target date: 8/06/2021

target date: 9/06/2021

target date: 11/06/2021


(Official date)
target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021


target date: 14/06/2021

target date: 14/06/2021

target date: 8/06/2021

target date: 9/06/2021

target date: 11/06/2021


(Official date)

target date: 9/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021


target date: 9/06/2021

target date: 11/06/2021


(Official date)
target date: 09/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 11/06/2021


(Official date)
target date: 10/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021


target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021

Annual Leave

target date: 14/06/2021

target date: 15/06/2021

target date: 16/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021

target date: 14/06/2021


Daily Work Plan & Performance (For T

□ Project : Petronas Podium(Lot LL1M) Name : Rahman

Date Work Plan

01/Jun(Tue)
Checking discrepency between pipe
sleeve at L00 & model at LC - P zone
02/Jun(Wed)

03/Jun(Thu)
Checking discrepency between pipe
sleeve at L00 & model at LC - T zone
04/Jun(Fri)

05/Jun(Sat)
Checking discrepency between pipe
sleeve at LC & model at LC - P zone
08/Jun(Tue)

09/Jun(Wed)
Checking discrepency between pipe
sleeve at LC & model at LC - T zone
10/Jun(Thu)

11/Jun(Fri)
Checking discrepency between opening
at L00 & model at LC - P & T zone
(Riser)
12/Jun(Sat)

Checking discrepency between opening


14/Jun(Mon) at LC & model at LC - P & T zone
(Riser)
Daily Work Plan & Performance (For Telecommuter)

Name : Rahman

Actual

In Progress
File reference
- For Con Pipe Sleeve drawing L00 (zone 1 to zone 8)
- Model Level C
ecommuter)

Outcome

Target - 2/6/2021

Target - 4/6/2021

Target - 8/6/2021

Target - 10/6/2021

Target - 12/6/2021

Target - 14/6/2021
Daily Work Plan & Performance (For T

□ Project : Petronas Podium(Lot LL1M) Name : Akmal

Date Work Plan

Finding discrepancy between MEP


01/Jun(Tue) services for permanent works at Level
C (Zone B7 & B8)

Finding discrepancy between MEP


02/Jun(Wed) services for permanent works at Level
C (Zone B1 & B2)

Finding discrepancy between MEP


03/Jun(Thu) services for permanent works at Level
C (Zone B6 & B5)

Finding discrepancy between MEP


04/Jun(Fri) services for permanent works at Level
C (Zone B4 & B3)

Summarize all findings for


05/Jun(Sat)
discrepancies

Finding discrepancy between temporary


08/Jun(Tue)
services & permanent works at Level C

Finding discrepancy between temporary


09/Jun(Wed)
services & permanent works at Level C

Finding discrepancy between temporary


10/Jun(Thu)
services & permanent works at Level C

Check Elec. Major equipment delivery,


11/Jun(Fri)
logistics, architecture

Check Elec. Major equipment delivery,


12/Jun(Sat)
logistics, architecture

Check Elec. Major equipment delivery,


14/Jun(Mon)
logistics, architecture
Daily Work Plan & Performance (For Telecommuter)

Name : Akmal

Actual

In progress
References : ISD Drawings, 3D Model Level C
ecommuter)

Outcome

Target - 8/6/2021

Target - 8/6/2021

Target - 8/6/2021

Target - 8/6/2021

Target - 8/6/2021

Target - 10/6/2021

Target - 10/6/2021

Target - 10/6/2021

Target - 14/6/2021

Target - 14/6/2021

Target - 14/6/2021
Daily Work Plan & Performance (For Telecommuter)

□ Project : Petronas Podium(Lot LL1M) Name : Muhammad Nor Afifi Bin Yusoff

Date Work Plan Actual Outcome

01/Jun(Tue) 📍 Petronas Podium Site [Lot LL1M]


1]M&E team members daily meeting Done Shared own work plan to others

2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0

3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00

4]Prepare logistic plan delivery material esc In progress Expected Finish Date : 14 June 2021

5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0

6]Review model level CCS services In progress Expected Finish Date : 14 June 2021

7]Cross check lift schindler schedule with SCT baseline schedule In progress Expected Finish Date : 14 June 2021

📍 Mock up Nilai

1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021

2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level

3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view

4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view

5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall
6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance

8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.

9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted

10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape

11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge

02/Jun(Wed) 📍 Petronas Podium Site [Lot LL1M]

1]M&E team members daily meeting Done Shared own work plan to others

2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0

3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Prepare logistic plan delivery material esc In progress Expected Finish Date : 14 June 2021

5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0

6]Review model level CCS services In progress Expected Finish Date : 14 June 2021

7]Cross check lift schindler schedule with SCT baseline schedule In progress Expected Finish Date : 14 June 2021

8] Study MOS Installation of Escalators and Travelators Done Expected Finish Date :2 June 2021

📍 Mock up Nilai

1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021

2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view

5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall

6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm

7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance

8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.

9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted

10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape

11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge

03/Jun(Thu) 📍 Petronas Podium Site [Lot LL1M]

1]M&E subcon meeting Done Expected Finish Date :3 June 2021

2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0

3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00

4]Prepare logistic plan delivery material esc In progress Expected Finish Date : 14 June 2021

5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0

6]Review model level CCS services In progress Expected Finish Date : 14 June 2021

7]Cross check lift schindler schedule with SCT baseline schedule In progress Expected Finish Date : 14 June 2021

8] Study MOS Installation and Testing of Lift System Done Expected Finish Date :3 June 2021

9]Review & comment (if any) MOS Installation & Testing Lift System rev01 Done review.email comment to shindler to revised Expected Finish Date :3 June 2021
prior official submission
📍 Mock up Nilai

1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021

2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall

6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance

8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.

9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted

10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape

11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge
04/Jun(Fri) 📍 Petronas Podium Site [Lot LL1M]

1]M&E team members daily meeting Done Team leader present work plan mock up level Concourse

2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0

3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00

4]Prepare logistic plan delivery material esc In progress Expected Finish Date : 14 June 2021

5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0

6]Review model level CCS services In progress Expected Finish Date : 14 June 2021

7]Cross check lift schindler schedule with SCT baseline schedule In progress Expected Finish Date : 14 June 2021

8] Study MOS Testing & Commissioning (T&C) of Lift System Done Expected Finish Date :4 June 2021

📍 Mock up Nilai

1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021

2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall

6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance

8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.

9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted

10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape

11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge

05/Jun(Sat) 📍 Petronas Podium Site [Lot LL1M]

1]M&E team members daily meeting Done Shared own work plan to others
2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Prepare logistic plan delivery material esc In progress Expected Finish Date : 14 11 June 2021
5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0

6]Review model level CCS services In progress Expected Finish Date : 14 June 2021
7]Cross check lift schindler schedule with SCT baseline schedule In progress Expected Finish Date : 14 11 June 2021

8] Study MOS 2 Core Screen Twisted Pair Cable Installation & Done Expected Finish Date :5 June 2021
Termination (ELV)
📍 Mock up Nilai

1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021

2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall

6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance

8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.
9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted

10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape

11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge

08/Jun(Tue) 📍 Petronas Podium Site [Lot LL1M]

1]M&E team members daily meeting Done Shared own work plan to others
2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Prepare logistic plan delivery material esc In progress Expected Finish Date : 14 11 June 2021
5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0

6]Review model level CCS services In progress Expected Finish Date : 14 June 2021
7]Cross check lift schindler schedule with SCT baseline schedule Done. Waiting comment from team leader if any Expected Finish Date : 14 11 June 2021

8] Study MOS 3rd Fix Device Installation Access Control System (ELV) Done Expected Finish Date :8 June 2021

9) Review Method Statement for Testing & Commissioning (T&C) of Lift Done Expected Finish Date :8 June 2021
System Rev01
10) Review Method Statement for Installation of Escalators & Travellators Done Expected Finish Date :8 June 2021
Rev01
📍 Mock up Nilai

1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021

2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall

6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance

8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.

9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted

10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape

11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge

09/Jun(Wed) 📍 Petronas Podium Site [Lot LL1M]

1]M&E team members daily meeting Done Shared own work plan to others
2] Internal meeting with MEP design team regarding clashing services with Done Expected Finish Date : 9 June 2021
model at level CCS
3]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
4]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
5]Prepare logistic plan delivery material esc In progress Expected Finish Date : 14 11 June 2021
6]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0

7]Checking with subcon material delivery date for 1st fix installation at Done Expected Finish Date : 9 June 2021
level CCS
8] Study MOS 3rd Fix Device Installation Audio Visual System (ELV) Done Expected Finish Date :9 June 2021

📍 Mock up Nilai

1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021
2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall

6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance

8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.

9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted

10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape

11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge

10/Jun(Thu) 📍 Petronas Podium Site [Lot LL1M]

1]M&E team members daily meeting Done Shared own work plan to others
2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Prepare logistic plan delivery material esc In progress Expected Finish Date : 14 11 June 2021
5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0

6] Study MOS 3rd Fix Device Installation Audio Visual System (ELV) Done Expected Finish Date :10 June 2021

📍 Mock up Nilai

1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021

2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall

6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance

8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.

9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted

10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape

11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge

11/Jun(Fri) 📍 Petronas Podium Site [Lot LL1M]

1]M&E team daily site patrol Done Expected Finish Date :11 June 2021
2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Prepare logistic plan delivery material esc to revised as per commented by team leader before Expected Finish Date : 14 11 June 2021
meeting with schindler next Wednesday 16 June 2021

5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0
6] Study MOS 3rd Fix Device Installation CCTV System (ELV) Done Expected Finish Date :11 June 2021
📍 Mock up Nilai

1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021

2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall

6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance

8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.

9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted

10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape

11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
12/Jun(Sat) with the Spout as per in the Contract. KLCC comment to raised the height 📍 Petronas Podium Site [Lot LL1M]
of the Urinal
1]M&E team Divider
daily siteflush to the Urinal ledge
patrol Done Expected Finish Date :12 June 2021
2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Revised logistic plan delivery material esc In progress Expected Finish Date : 14 15 June 2021
5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0

6] Study MOS 3rd Fix Device Installation Telephone System - Help Point Done Expected Finish Date :12 June 2021
(ELV)
7] Cross check finishing schedule CCS with ISD Telecom layout and In progress Expected Finish Date :12 14 June 2021
routing CCS
📍 Mock up Nilai

1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021

2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall

6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance

8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.

9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted

10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape

11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge

14/Jun(Mon) 📍 Petronas Podium Site [Lot LL1M]

1]M&E team members daily site patrol Done Expected Finish Date :14 June 2021
2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Revised logistic plan delivery material esc In progress Expected Finish Date : 14 15 June 2021
14/Jun(Mon)

5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0

6]Counter check actual slab height on site with height of services for con In progress Expected Finish Date : 14 15 June 2021
drawing using laser measurement
7] Study MOS Cable Supporting System Installation (ELV) Done Expected Finish Date :14 June 2021
📍 Mock up Nilai

1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021

2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall

6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance

8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.

9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted

10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape

11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge
Daily Work Plan & Performance (For T
□ Project : Petronas Podium(Lot LL1M) Name : Alif Dolkafle

Date Work Plan

01/Jun(Tue) To check any difference between "L00


pipe sleeve drawing" & "BIM model" at
02/Jun(Wed) LC-P zone

03/Jun(Thu) To check any difference between "L00


pipe sleeve drawing" & "BIM model" at
04/Jun(Fri) LC-T zone

05/Jun(Sat) To check any difference between "L00


pipe sleeve drawing" & "BIM model" at
07/Jun(Mon) LC-P zone

08/Jun(Tue) To check any difference between "L00


pipe sleeve drawing" & "BIM model" at
09/Jun(Wed) LC-T zone

10/Jun(Thu) To check any difference between "L00


riser opening" & "BIM model" at LC-P
11/Jun(Fri) zone, T zone

12/Jun(Sat) To check any difference between "L00


riser opening" & "BIM model" at LC-
14/Jun(Mon) Pzone,T zone
Daily Work Plan & Performance (For Telecommuter)
Name : Alif Dolkafle

Actual

In progress
Reference: -For Con Pipe Sleeve drawing L00
-BIM Model Level C
ecommuter)

Outcome

Target - 2/6/2021

Target - 4/6/2022

Target - 7/6/2023

Target - 9/6/2024

Target - 11/6/2025

Target - 14/6/2026
Daily Work Plan & Performance (For Telecommu

□ Project : Petronas Podium(Lot LL1M) Name : Ashok

Date Work Plan Actual

•site standby;
Site Duty (standby) -checking mst,pump, db condition and site
01/Jun(Tue) 'Site Observation morning & evening time. monitoring everything ok.
•subcon meter reading check& update. •subcon meter reading check& update..
•make work plan -L1 lighting installation (02/06)

Site Duty (standby)


make temporary labor work schedule.
02/Jun(Wed)
make work plan -L1 lighting installation (02/06)

Site Observation morning & evening time.

Study and preparing swp temporary DB


installation.
03/Jun(Thu)

Site Duty (standby)


04/Jun(Fri)
Site Observation morning & evening time.
Study and preparing swp temporary lighting
installation.
05/Jun(Sat)

Study and preparing temporary water line


08/Jun(Tue) installation.
•prepare temporary labor work sehedule.

Site Duty (standby)


09/Jun(Wed)
Site Observation morning & evening time.

Study and preparing swp temporary lighting


installation.
10/Jun(Thu)
10/Jun(Thu)
• Prepare the SWP for the material loading and
unloading at site
• Prepare the SWP for the material delivery at
11/Jun(Fri) site

Site Duty (standby)


12/Jun(Sat)
Site Observation morning & evening time.

Make plan storage & material arrangement.


14/Jun(Mon)
•prepare material use plan and sehedule.
ce (For Telecommuter)

Outcome

Site Observation morning & evening no issue.


•subcon meter reading done.
Daily Work Plan & Performance (For Tele

□ Project : Petronas Podium(Lot LL1M) Name : Fakhrul

Date Work Plan


Shop Drawing
1. Submission conceal conduit shop
drawing level P3 zone T-1

2. Submission conceal conduit shop


drawing level P3 zone T-3

3. Submission conceal conduit shop


drawing level P3 zone T-4

01/Jun(Tue) 4. Submission conceal conduit shop


drawing level P3 zone T-5

5. Submission conceal conduit shop


drawing level P3 zone T-6

6.Submission sleeve installation


drawing level P3 zone T-3

Shop Drawing
1. Submission conceal conduit shop
drawing level P3 zone T-1

2. Submission conceal conduit shop


drawing level P3 zone T-3

3. Submission conceal conduit shop


drawing level P3 zone T-4

02/Jun(Wed) 4. Submission conceal conduit shop


drawing level P3 zone T-5

5. Submission conceal conduit shop


drawing level P3 zone T-6

6.Submission sleeve installation


drawing level P3 zone T-3
Shop Drawing
1. Submission conceal conduit shop
drawing level P3 zone T-4

2. Submission conceal conduit shop


03/Jun(Thu) drawing level P3 zone T-5

3. Submission conceal conduit shop


drawing level P3 zone T-6

Shop Drawing
1. Submission conceal conduit shop
drawing level P3 zone T-4

2. Submission conceal conduit shop


04/Jun(Fri) drawing level P3 zone T-5

3. Submission conceal conduit shop


drawing level P3 zone T-6

For Con
1. Issue Earthing & LPS for con drawing
level P4 zone T-3

2. Issue Earthing & LPS for con drawing


level P4 zone T-4

3. Issue Earthing & LPS for con drawing


level P4 zone B-1

05/Jun(Sat) 4. Issue Earthing & LPS for con drawing


level P4 zone B-2

5. Issue Earthing & LPS for con drawing


level P4 zone B-3

6. Issue Earthing & LPS for con drawing


level P4 zone B-4
For Con
1. Issue Earthing & LPS for con drawing
level P4 zone T-3

2. Issue Earthing & LPS for con drawing


level P4 zone T-4

3. Issue Earthing & LPS for con drawing


level P4 zone B-1

07/Jun(Mon) 4. Issue Earthing & LPS for con drawing


level P4 zone B-2

5. Issue Earthing & LPS for con drawing


level P4 zone B-3

6. Issue Earthing & LPS for con drawing


level P4 zone B-4

For Con
1. Issue Earthing & LPS for con drawing
level P4 zone T-3

2. Issue Earthing & LPS for con drawing


level P4 zone T-4

3. Issue Earthing & LPS for con drawing


level P4 zone B-1

08/Jun(Tue) 4. Issue Earthing & LPS for con drawing


level P4 zone B-2

5. Issue Earthing & LPS for con drawing


level P4 zone B-3

6. Issue Earthing & LPS for con drawing


level P4 zone B-4
For Con
1. Issue Earthing & LPS for con drawing
level P4 zone T-3

2. Issue Earthing & LPS for con drawing


level P4 zone T-4

3. Issue Earthing & LPS for con drawing


level P4 zone B-1

09/Jun(Wed) 4. Issue Earthing & LPS for con drawing


level P4 zone B-2

5. Issue Earthing & LPS for con drawing


level P4 zone B-3

6. Issue Earthing & LPS for con drawing


level P4 zone B-4

For Con
1. Issue Earthing & LPS for con drawing
level P4 zone T-3

2. Issue Earthing & LPS for con drawing


level P4 zone T-4

3. Issue Earthing & LPS for con drawing


level P4 zone B-1

10/Jun(Thu) 4. Issue Earthing & LPS for con drawing


level P4 zone B-2

5. Issue Earthing & LPS for con drawing


level P4 zone B-3

6. Issue Earthing & LPS for con drawing


level P4 zone B-4
For Con
1. Issue Earthing & LPS for con drawing
level P4 zone T-3

2. Issue Earthing & LPS for con drawing


level P4 zone T-4

3. Issue Earthing & LPS for con drawing


level P4 zone B-1

11/Jun(Fri) 4. Issue Earthing & LPS for con drawing


level P4 zone B-2

5. Issue Earthing & LPS for con drawing


level P4 zone B-3

6. Issue Earthing & LPS for con drawing


level P4 zone B-4

For Con
1. Issue Earthing & LPS for con drawing
level P4 zone B-5

2. Issue Earthing & LPS for con drawing


level P4 zone B-6

3. Issue Earthing & LPS for con drawing


level P4 zone B-7

12/Jun(Sat) 4. Issue Earthing & LPS for con drawing


level P4 zone B-8

5. Issue Earthing & LPS for con drawing


level P4 zone B-9

6. Issue Earthing & LPS for con drawing


level P4 zone B-10
For Con
1. Issue Earthing & LPS for con drawing
level P4 zone B-5

2. Issue Earthing & LPS for con drawing


level P4 zone B-6

3. Issue Earthing & LPS for con drawing


level P4 zone B-7

13/Jun(Sun) 4. Issue Earthing & LPS for con drawing


level P4 zone B-8

5. Issue Earthing & LPS for con drawing


level P4 zone B-9

6. Issue Earthing & LPS for con drawing


level P4 zone B-10

For Con
1. Issue Earthing & LPS for con drawing
level P4 zone B-5

2. Issue Earthing & LPS for con drawing


level P4 zone B-6

3. Issue Earthing & LPS for con drawing


level P4 zone B-7

14/Jun(Mon) 4. Issue Earthing & LPS for con drawing


level P4 zone B-8

5. Issue Earthing & LPS for con drawing


level P4 zone B-9

6. Issue Earthing & LPS for con drawing


level P4 zone B-10
k Plan & Performance (For Telecommuter)

Actual Outcome
Shop Drawing Shop Drawing
1. Ready to submit 1. 12/5 28/5

2. Pending cabnet & secm to update 2. 12/5 28/5


model

3. Done prepare 3. 4/6

4. Done prepare 4. 4/6

5. Done prepare 5. 4/6

6. Pending BME update model as per 6. 28/5


BIM comment

Shop Drawing
1. 12/5 28/5

2. 12/5 28/5

3. 4/6

4. 4/6

5. 4/6

6. 28/5
Shop Drawing
1. 4/6

2. 4/6

3. 4/6

Shop Drawing
1. 4/6

2. 4/6

3. 4/6

For Con
1. 11/6

2. 11/6

3. 11/6

4. 11/6

5. 11/6

6. 11/6
For Con
1. 11/6

2. 11/6

3. 11/6

4. 11/6

5. 11/6

6. 11/6

For Con
1. 11/6

2. 11/6

3. 11/6

4. 11/6

5. 11/6

6. 11/6
For Con
1. 11/6

2. 11/6

3. 11/6

4. 11/6

5. 11/6

6. 11/6

For Con
1. 11/6

2. 11/6

3. 11/6

4. 11/6

5. 11/6

6. 11/6
For Con
1. 11/6

2. 11/6

3. 11/6

4. 11/6

5. 11/6

6. 11/6

For Con
1. 18/6

2. 18/6

3. 18/6

4. 18/6

5. 18/6

6. 18/6
For Con
1. 18/6

2. 18/6

3. 18/6

4. 18/6

5. 18/6

6. 18/6

For Con
1. 18/6

2. 18/6

3. 18/6

4. 18/6

5. 18/6

6. 18/6