12july2021 - M&E Team Daily Work Plan & Performance (For Telecommuter)
12july2021 - M&E Team Daily Work Plan & Performance (For Telecommuter)
12july2021 - M&E Team Daily Work Plan & Performance (For Telecommuter)
02/06/21
check and review LC ELV For-con dwg
Wednesday
03/06/21
check and review LC ELV For-con dwg
Thursday
05/06/21
To Issue LC Elec For-con dwg
Saturday
05/06/21
Saturday
08/06/21
To Issue LC Elec For-con dwg
Tuesday
10/06/21
check and review LC ELV For-con dwg
Thursday
14/06/21
To issue LC ELV For-con dwg
Monday
ACTUAL OUTCOME
check and review schindler shop drawing- schindler submited lift R8R9 dwg,
R8R9 commented
check and review LC Elec For-con dwg final review by BIM team
Actual Outcome
In-progress
In-progress
Daily Work Plan & Performance ( For Telecommuter)
1. BIM 5D Quantification
01/Jun(Tue) a. Computation Quantity of Material from BIM a. naviswork computation BIM model to quantity save to excel file
for VO ACMV
1. BIM 5D Quantification
02/Jun(Wed) a. Computation Quantity of Material from BIM
1. BIM 5D Quantification
a. Computation Quantity of Material from BIM
10/Jun(Thu)
2. M&E PM meeting
1. BIM 5D Quantification
11/Jun(Fri) a. Computation Quantity of Material from BIM
Outcome
01/Jun(Tue)
VO document
preparation
Monthly electrical
usage
PO
May PPC
Weekly PM
meeting
Covid-19
Daily Work Plan &
Performance
Official VO
submission
02/Jun(Wed)
VO document
preparation
Monthly electrical
usage
May PPC
Weekly PM
meeting
Official VO
submission
03/Jun(Thu)
VO document
preparation
03/Jun(Thu)
VO document
preparation
04/Jun(Fri) Ann
05/Jun(Sat) Ann
Weekly progress
report
May PPC
Official VO
submission
07/Jun(Mon)
VO document
preparation
VO document
preparation
Weekly progress
report
May PPC
Temporary
Material, Labour
Template
Official VO
submission
08/Jun(Tue)
VO document
preparation
Weekly progress
report
May PPC
Weekly PM
meeting
Official VO
submission
09/Jun(Wed)
VO document
preparation
May PPC
Weekly PM
meeting
Official VO
submission
10/Jun(Thu)
VO document
preparation
10/Jun(Thu)
VO document
preparation
11/Jun(Fri) Ann
Weekly progress
report
Official VO
submission
14/Jun(Mon)
VO document
preparation
Daily Work Plan & Performance ( For Telecommuter)
Lot LL1M) Name : Ummu
Work Plan
1) Prepare internal progress meeting material
5) Verify BMESB-06(CD01)
- Title: Additional FT for Toilets Level C to Level 5
5) Verify BMESB-06(CD01)
- Title: Additional FT for Toilets Level C to Level 5
5) Verify BMESB-06(CD01)
- Title: Additional FT for Toilets Level C to Level 5
Annual Leave
Annual Leave
5) Verify BMESB-06(CD01)
- Title: Additional FT for Toilets Level C to Level 5
5) Verify BMESB-06(CD01)
- Title: Additional FT for Toilets Level C to Level 5
1) Prepare & send out Submission & Approval List
5) Verify BMESB-06(CD01)
- Title: Additional FT for Toilets Level C to Level 5
5) Verify BMESB-06(CD01)
- Title: Additional FT for Toilets Level C to Level 5
Annual Leave
5) Verify BMESB-06(CD01)
- Title: Additional FT for Toilets Level C to Level 5
ormance ( For Telecommuter)
Actual Outcome
1) Done target date: 1/06/2021
Annual Leave
Annual Leave
Annual Leave
01/Jun(Tue)
Checking discrepency between pipe
sleeve at L00 & model at LC - P zone
02/Jun(Wed)
03/Jun(Thu)
Checking discrepency between pipe
sleeve at L00 & model at LC - T zone
04/Jun(Fri)
05/Jun(Sat)
Checking discrepency between pipe
sleeve at LC & model at LC - P zone
08/Jun(Tue)
09/Jun(Wed)
Checking discrepency between pipe
sleeve at LC & model at LC - T zone
10/Jun(Thu)
11/Jun(Fri)
Checking discrepency between opening
at L00 & model at LC - P & T zone
(Riser)
12/Jun(Sat)
Name : Rahman
Actual
In Progress
File reference
- For Con Pipe Sleeve drawing L00 (zone 1 to zone 8)
- Model Level C
ecommuter)
Outcome
Target - 2/6/2021
Target - 4/6/2021
Target - 8/6/2021
Target - 10/6/2021
Target - 12/6/2021
Target - 14/6/2021
Daily Work Plan & Performance (For T
Name : Akmal
Actual
In progress
References : ISD Drawings, 3D Model Level C
ecommuter)
Outcome
Target - 8/6/2021
Target - 8/6/2021
Target - 8/6/2021
Target - 8/6/2021
Target - 8/6/2021
Target - 10/6/2021
Target - 10/6/2021
Target - 10/6/2021
Target - 14/6/2021
Target - 14/6/2021
Target - 14/6/2021
Daily Work Plan & Performance (For Telecommuter)
□ Project : Petronas Podium(Lot LL1M) Name : Muhammad Nor Afifi Bin Yusoff
2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Prepare logistic plan delivery material esc In progress Expected Finish Date : 14 June 2021
5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0
6]Review model level CCS services In progress Expected Finish Date : 14 June 2021
7]Cross check lift schindler schedule with SCT baseline schedule In progress Expected Finish Date : 14 June 2021
📍 Mock up Nilai
1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021
2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall
6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance
8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.
9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted
10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape
11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge
1]M&E team members daily meeting Done Shared own work plan to others
2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Prepare logistic plan delivery material esc In progress Expected Finish Date : 14 June 2021
5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0
6]Review model level CCS services In progress Expected Finish Date : 14 June 2021
7]Cross check lift schindler schedule with SCT baseline schedule In progress Expected Finish Date : 14 June 2021
8] Study MOS Installation of Escalators and Travelators Done Expected Finish Date :2 June 2021
📍 Mock up Nilai
1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021
2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall
6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance
8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.
9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted
10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape
11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge
2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Prepare logistic plan delivery material esc In progress Expected Finish Date : 14 June 2021
5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0
6]Review model level CCS services In progress Expected Finish Date : 14 June 2021
7]Cross check lift schindler schedule with SCT baseline schedule In progress Expected Finish Date : 14 June 2021
8] Study MOS Installation and Testing of Lift System Done Expected Finish Date :3 June 2021
9]Review & comment (if any) MOS Installation & Testing Lift System rev01 Done review.email comment to shindler to revised Expected Finish Date :3 June 2021
prior official submission
📍 Mock up Nilai
1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021
2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall
6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance
8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.
9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted
10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape
11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge
04/Jun(Fri) 📍 Petronas Podium Site [Lot LL1M]
1]M&E team members daily meeting Done Team leader present work plan mock up level Concourse
2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Prepare logistic plan delivery material esc In progress Expected Finish Date : 14 June 2021
5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0
6]Review model level CCS services In progress Expected Finish Date : 14 June 2021
7]Cross check lift schindler schedule with SCT baseline schedule In progress Expected Finish Date : 14 June 2021
8] Study MOS Testing & Commissioning (T&C) of Lift System Done Expected Finish Date :4 June 2021
📍 Mock up Nilai
1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021
2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall
6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance
8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.
9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted
10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape
11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge
1]M&E team members daily meeting Done Shared own work plan to others
2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Prepare logistic plan delivery material esc In progress Expected Finish Date : 14 11 June 2021
5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0
6]Review model level CCS services In progress Expected Finish Date : 14 June 2021
7]Cross check lift schindler schedule with SCT baseline schedule In progress Expected Finish Date : 14 11 June 2021
8] Study MOS 2 Core Screen Twisted Pair Cable Installation & Done Expected Finish Date :5 June 2021
Termination (ELV)
📍 Mock up Nilai
1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021
2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall
6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance
8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.
9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted
10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape
11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge
1]M&E team members daily meeting Done Shared own work plan to others
2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Prepare logistic plan delivery material esc In progress Expected Finish Date : 14 11 June 2021
5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0
6]Review model level CCS services In progress Expected Finish Date : 14 June 2021
7]Cross check lift schindler schedule with SCT baseline schedule Done. Waiting comment from team leader if any Expected Finish Date : 14 11 June 2021
8] Study MOS 3rd Fix Device Installation Access Control System (ELV) Done Expected Finish Date :8 June 2021
9) Review Method Statement for Testing & Commissioning (T&C) of Lift Done Expected Finish Date :8 June 2021
System Rev01
10) Review Method Statement for Installation of Escalators & Travellators Done Expected Finish Date :8 June 2021
Rev01
📍 Mock up Nilai
1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021
2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall
6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance
8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.
9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted
10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape
11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge
1]M&E team members daily meeting Done Shared own work plan to others
2] Internal meeting with MEP design team regarding clashing services with Done Expected Finish Date : 9 June 2021
model at level CCS
3]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
4]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
5]Prepare logistic plan delivery material esc In progress Expected Finish Date : 14 11 June 2021
6]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0
7]Checking with subcon material delivery date for 1st fix installation at Done Expected Finish Date : 9 June 2021
level CCS
8] Study MOS 3rd Fix Device Installation Audio Visual System (ELV) Done Expected Finish Date :9 June 2021
📍 Mock up Nilai
1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021
2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall
6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance
8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.
9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted
10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape
11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge
1]M&E team members daily meeting Done Shared own work plan to others
2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Prepare logistic plan delivery material esc In progress Expected Finish Date : 14 11 June 2021
5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0
6] Study MOS 3rd Fix Device Installation Audio Visual System (ELV) Done Expected Finish Date :10 June 2021
📍 Mock up Nilai
1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021
2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall
6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance
8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.
9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted
10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape
11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge
1]M&E team daily site patrol Done Expected Finish Date :11 June 2021
2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Prepare logistic plan delivery material esc to revised as per commented by team leader before Expected Finish Date : 14 11 June 2021
meeting with schindler next Wednesday 16 June 2021
5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0
6] Study MOS 3rd Fix Device Installation CCTV System (ELV) Done Expected Finish Date :11 June 2021
📍 Mock up Nilai
1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021
2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall
6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance
8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.
9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted
10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape
11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
12/Jun(Sat) with the Spout as per in the Contract. KLCC comment to raised the height 📍 Petronas Podium Site [Lot LL1M]
of the Urinal
1]M&E team Divider
daily siteflush to the Urinal ledge
patrol Done Expected Finish Date :12 June 2021
2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Revised logistic plan delivery material esc In progress Expected Finish Date : 14 15 June 2021
5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0
6] Study MOS 3rd Fix Device Installation Telephone System - Help Point Done Expected Finish Date :12 June 2021
(ELV)
7] Cross check finishing schedule CCS with ISD Telecom layout and In progress Expected Finish Date :12 14 June 2021
routing CCS
📍 Mock up Nilai
1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021
2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall
6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance
8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.
9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted
10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape
11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge
1]M&E team members daily site patrol Done Expected Finish Date :14 June 2021
2]Monitoring installation rebar level 3 zone P1 In progress Full Movement Control Order 3.0
3]monitoring progress rebar column & casting works at level CCS, level In progress Full Movement Control Order 3.0
P2 and level L00
4]Revised logistic plan delivery material esc In progress Expected Finish Date : 14 15 June 2021
14/Jun(Mon)
5]Install 1st fix & 2nd fix earthing & lightning protection system at level P2 In progress Full Movement Control Order 3.0
6]Counter check actual slab height on site with height of services for con In progress Expected Finish Date : 14 15 June 2021
drawing using laser measurement
7] Study MOS Cable Supporting System Installation (ELV) Done Expected Finish Date :14 June 2021
📍 Mock up Nilai
1]Lift Car Wall - The colour tone should similar with premium basin vanity Expected Finish Date : 30 June 2021 Expected Finish Date : 30 June 2021
2]Lift Car Call Button at Lift lobby - The lift and call button height need to Expected Finish Date : TBA Expected Finish Date : TBA
be within 900 to 1200mm from floor finish level
3]Lift Car Ceiling - Lift ceiling for access panel emergency exit Kept in view Kept in view
4]Lift Car Cpeaker - Main cop speaker hole Kept in view Kept in view
5]Lift Car PMA Plate - Main/Sub cop provision for lift PMA plate, ( NRY will Kept in view Kept in view
advise the location & design intent) KLCC suggest to be embed in the Lift
Wall
6]Lift Landing Door Sill - Gap between sill to adjust gap to 30mm.Current Kept in view Kept in view
gap 15mm
7]Lift Car Floor Finish (ST03 -> SF02) - KLCCP requested Dessert beige Expected Finish date : 4 June 2021 Full Movement Control Order 3.0
floor marble (ST03) change to Tundra Grey (SF-02) for less keeping
various material and keeping cleanliness for ease future maintenance
8]Perforated Aluminum Panel - Escalator perforated Panel to be replace Expected Finish date : 30 July 2021 Full Movement Control Order 3.0
with the new MT09 Perforated Hole design and detail to refer RFI reply
including backlit lighting.
9]Paper Towel Dispenser - NRY informed based on contract Expected Finish Date : TBA Expected Finish Date : TBA
document/drawings the paper towel will be installed next to hand dryer.
Hence, the existing paper towel behind the vanity mirror as per mockup to
be omitted
10]Replacement of Hand dryer (TOTO -> Dyson) - KLCCP requested SCT Expected Finish Date : TBA Expected Finish Date : TBA
to replace existing TOTO hand dryer with Dyson hand dryer V shape
11]Urinal & Urinal Divider - KLCC commented to install the actual Urinal Expected Finish Date : TBA Expected Finish Date : TBA
with the Spout as per in the Contract. KLCC comment to raised the height
of the Urinal Divider flush to the Urinal ledge
Daily Work Plan & Performance (For T
□ Project : Petronas Podium(Lot LL1M) Name : Alif Dolkafle
Actual
In progress
Reference: -For Con Pipe Sleeve drawing L00
-BIM Model Level C
ecommuter)
Outcome
Target - 2/6/2021
Target - 4/6/2022
Target - 7/6/2023
Target - 9/6/2024
Target - 11/6/2025
Target - 14/6/2026
Daily Work Plan & Performance (For Telecommu
•site standby;
Site Duty (standby) -checking mst,pump, db condition and site
01/Jun(Tue) 'Site Observation morning & evening time. monitoring everything ok.
•subcon meter reading check& update. •subcon meter reading check& update..
•make work plan -L1 lighting installation (02/06)
Outcome
Shop Drawing
1. Submission conceal conduit shop
drawing level P3 zone T-1
Shop Drawing
1. Submission conceal conduit shop
drawing level P3 zone T-4
For Con
1. Issue Earthing & LPS for con drawing
level P4 zone T-3
For Con
1. Issue Earthing & LPS for con drawing
level P4 zone T-3
For Con
1. Issue Earthing & LPS for con drawing
level P4 zone T-3
For Con
1. Issue Earthing & LPS for con drawing
level P4 zone B-5
For Con
1. Issue Earthing & LPS for con drawing
level P4 zone B-5
Actual Outcome
Shop Drawing Shop Drawing
1. Ready to submit 1. 12/5 28/5
Shop Drawing
1. 12/5 28/5
2. 12/5 28/5
3. 4/6
4. 4/6
5. 4/6
6. 28/5
Shop Drawing
1. 4/6
2. 4/6
3. 4/6
Shop Drawing
1. 4/6
2. 4/6
3. 4/6
For Con
1. 11/6
2. 11/6
3. 11/6
4. 11/6
5. 11/6
6. 11/6
For Con
1. 11/6
2. 11/6
3. 11/6
4. 11/6
5. 11/6
6. 11/6
For Con
1. 11/6
2. 11/6
3. 11/6
4. 11/6
5. 11/6
6. 11/6
For Con
1. 11/6
2. 11/6
3. 11/6
4. 11/6
5. 11/6
6. 11/6
For Con
1. 11/6
2. 11/6
3. 11/6
4. 11/6
5. 11/6
6. 11/6
For Con
1. 11/6
2. 11/6
3. 11/6
4. 11/6
5. 11/6
6. 11/6
For Con
1. 18/6
2. 18/6
3. 18/6
4. 18/6
5. 18/6
6. 18/6
For Con
1. 18/6
2. 18/6
3. 18/6
4. 18/6
5. 18/6
6. 18/6
For Con
1. 18/6
2. 18/6
3. 18/6
4. 18/6
5. 18/6
6. 18/6