Daily Labour Report --7/05/2020 Total Labour--124 Nos.

M/s NCC Ltd

NHAI Works
S.No Activity No. of Labour

1 Mastic Work Near Expansion Joints 37


2 Expansion Joint Fixing work 20
3 Painting Work 4

Total NHAI Labour


61 Nos.

Manish Nagar RUB & ROB


S.No Activity No. of Labour
1 Bow String Girder Erection Works 36
2 RUB Mosaic Tiles Work 8
3 RUB Cleaning Work 7
Boundary Wall Construction Between
4 P4 & P10 6
Manish Nagar & NHAI Connecting Slab
5 Reinf Work 3

Total Manish Nagar Labour


60 Nos.

Reach-1 Viaduct
S.No Activity No. of Labour
Strip Seal Exp Joint Repair Works at
1 Rahate Station 3

Total Reach-1 Viaduct Labour


3 Nos.
Daily Labour Report --08/05/2020
M/s NCC Ltd Total Labour--122 Nos.

NHAI Works
S.No Activity No. of Labour

1 Mastic Work Near Expansion Joints 37

2 Expansion Joint Fixing work 16

3 Painting Work 6

Total NHAI Labour 59 Nos.

Manish Nagar RUB & ROB


S.No Activity No. of Labour

1 Bow String Girder Erection Works 36

2 RUB Mosaic Tiles Work 8

3 RUB Cleaning Work 7


Boundary Wall Construction Between
4 P4 & P10 6
Manish Nagar & NHAI Connecting
5 Slab Reinf Work 3

Total Manish Nagar Labour 60 Nos.

Reach-1 Viaduct
S.No Activity No. of Labour
Strip Seal Exp Joint Repair Works at
1 Rahate Station 3

Total Reach-1 Viaduct Labour 3 Nos.


Daily Labour Report --09/05/2020
M/s NCC Ltd Total Labour--142 Nos.

NHAI Works
S.No Activity No. of Labour

1 Preparation for Mastic Work 35

2 Expansion Joint Fixing work 10

3 Median/Crash Barrier Casting Works 10

3 Painting Work 6

Total NHAI Labour 61 Nos.

Manish Nagar RUB & ROB


S.No Activity No. of Labour

1 Bow String Girder Erection Works 36

2 RUB Mosaic Tiles Work 8

3 RUB Cleaning Work 8


Boundary Wall Construction Between
4 P4 & P10 9
Manish Nagar & NHAI Connecting
5 Slab Reinf Work 15
6 Stucco Plastering 5

Total Manish Nagar Labour 81 Nos.

Reach-1 Viaduct
S.No Activity No. of Labour
Strip Seal Exp Joint Ponding Test at
1 Rahate Station 0

Total Reach-1 Viaduct Labour 0 Nos.


Daily Labour Report --11/05/2020
M/s NCC Ltd Total Labour 154 Nos.

NHAI Works
Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

1 Preparation for Mastic Work 15 0 17 32

2 BC Preparation Works 5 0 10 15
Expansion Joint Fixing work
3 7 0 5 12
Median/Crash Barrier Casting
Works, Drainage Spout Fixing 8 8 0
4 Works 16

5 Painting Work 2 2 2 6

Total NHAI Labour 37 10 34


81 Nos.

Manish Nagar RUB & ROB


Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours
Bow String Girder Erection
1 Works 29 0 5 34

2 RUB Mosaic Tiles Work 8 0 0 8

3 RUB Cleaning Work 0 0 5 5


Boundary Wall Construction
4 Between P4 & P10 3 1 5 9
Manish Nagar & NHAI
5 Connecting Slab Reinf Work 12 0 5 17
6 Stucco Plastering 0 0 0 0

Total Manish Nagar Labour 52 1 20


73 Nos.

Reach-1 Viaduct

Labour Details
Semi
S.No Strip Seal Exp
Activity
Joint Ponding Skilled Skilled Unskilled Total Labours
1 Test at Rahate Station 0 0 0 0

Total Reach-1 Viaduct Labour 0 0 0


0 Nos.
Daily Labour Report --12/05/2020 Total Labour 151 Nos.
M/s NCC Ltd

NHAI Works
Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

1 Preparation for Mastic Work 15 0 17 32

2 BC Preparation Works 0 0 0 0
Expansion Joint Fixing work
3 7 0 7 14
Median/Crash Barrier Casting
Works, Drainage Spout Fixing 7 7 0
4 Works 14

5 Painting Work 4 4 4 12

Total NHAI Labour 33 11 28


72 Nos.

Manish Nagar RUB & ROB


Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours
Bow String Girder Erection
1 Works 29 0 5 34

2 RUB Mosaic Tiles Work 8 0 0 8

3 RUB Cleaning Work 1 0 5 6


Boundary Wall Construction
4 Between P4 & P10 5 0 9 14
Manish Nagar & NHAI
5 Connecting Slab Reinf Work 10 0 7 17
6 Stucco Plastering 0 0 0 0

Total Manish Nagar Labour 53 0 26


79 Nos.

Reach-1 Viaduct

Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours
Strip Seal Exp Joint Ponding
1 Test at Rahate Station 0 0 0 0

Total Reach-1 Viaduct Labour 0 0 0


0 Nos.
Total Reach-1 Viaduct Labour 0 0 0
0 Nos.
Daily Labour Report --14/05/2020 Total Labour 174 Nos.
M/s NCC Ltd

NHAI Works
Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

1 Preparation for Mastic Work 15 0 17 32

2 BC Preparation Works 5 0 10 15
Expansion Joint Fixing work
3 5 0 5 10
Median/Crash Barrier Casting
Works, Electric pole 6 6 0 12
4 Foundation work
8
5 Painting Work 4 2 2
Preparation for Electrical 2
6 Cabling Work 1 0 1
Total NHAI Labour 36 8 35
79 Nos.

Manish Nagar RUB & ROB


Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours
Bow String Girder Erection
1 Works 29 0 5 34

2 RUB Mosaic Tiles Work 4 0 0 4

3 RUB Cleaning Work 1 0 4 5


Boundary Wall Construction
4 Between P4 & P10 7 0 9 16
Manish Nagar & NHAI
5 Connecting Slab Reinf Work 17 0 6 23
6 Stucco Plastering 0 0 0
0
7 Texture painting 8 0 0 8

Total Manish Nagar Labour 66 0 24


90 Nos.

Reach-1 Viaduct

Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours
Strip Seal Exp Joint Ponding
Test at Rahate Station,Pier
1 Arm Recess filling Work. 2 0 3 5
Total Reach-1 Viaduct Labour 2 0 3 5
Nos.
Daily Labour Report --15/05/2020 Total Labour 194 Nos.
M/s NCC Ltd

NHAI Works
Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

1 Preparation for Mastic Work 15 0 17 32

2 BC Preparation Works 5 0 10 15
Expansion Joint Fixing work
3 6 0 6 12
Median/Crash Barrier Casting
Works, Electric pole 10 10 0 20
4 Foundation work
12
5 Painting Work 4 4 4
Preparation for Electrical 2
6 Cabling Work 1 0 1
Total NHAI Labour 41 14 38
93 Nos.

Manish Nagar RUB & ROB


Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours
Bow String Girder Erection
1 Works 29 0 5 34

2 RUB Mosaic Tiles Work 4 0 0 4

3 RUB Cleaning Work 1 0 4 5


Boundary Wall Construction
4 Between P4 & P10 5 0 7 12
Manish Nagar & NHAI
5 Connecting Slab Reinf Work 18 0 4 22
6 Stucco Plastering 4 0 0
4
7 Texture painting 8 0 0 8
8 Pump Room Construction @ 1 0 3
P3 4
Total Manish Nagar Labour 69 0 20
93 Nos.

Reach-1 Viaduct

Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours
Strip Seal Exp Joint Ponding
Test at Rahate Station,Pier
1 Arm Recess filling Work. 1 0 2 3

SS Railing Plate Welding and


2 Grouting Work 3 0 2 5
Total Reach-1 Viaduct Labour 1 0 2 8
Nos.
Daily Site Labour Report --18/05/2020 Total Labour 152 Nos.
M/s NCC Ltd

NHAI Works
Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

1 Preparation for Mastic Work 0 0 0 0

2 BC Preparation Works 7 0 10 17
Expansion Joint Fixing work
3 6 0 6 12
Median/Crash Barrier Casting
Works, Electric pole 10 10 0 20
4 Foundation work
12
5 Painting Work 4 4 4
Preparation for Electrical 4
6 Cabling Work 2 0 2
Total NHAI Labour 29 14 22
65 Nos.

Manish Nagar RUB & ROB


Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours
Bow String Girder Erection
1 Works 19 0 5 24

2 RUB Mosaic Tiles Work 4 0 0 4


RUB Cleaning Work and
3 Plaster work 2 0 4 6
Boundary Wall Construction
4 Between P4 & P10 3 0 4 7
Manish Nagar & NHAI
5 Connecting Slab Reinf Work 16 0 3 19
6 Stucco Plastering 0 0 0
0
7 Texture painting 8 0 0 8
8 Pump Room Construction @ 2 0 2
P3 4
9 P10 Sump Water Proofing 2 0 1
3
Total Manish Nagar Labour 52 0 16
75 Nos.

Reach-1 Viaduct

Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours
Strip Seal Exp Joint Ponding
Test at Rahate Station,Pier
1 Arm Recess filling Work. 1 0 2 4

SS Railing Plate Welding and


2 Grouting Work 8 0 0 8
Total Reach-1 Viaduct Labour 1 0 2 12
Nos.
Daily Site Labour Report --19/05/2020 Total Labour 200
M/s NCC Ltd

NHAI Works
Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

1 Preparation for Mastic Work 0 0 0 0

2 BC Preparation Works 4 0 8 12
Expansion Joint Fixing work
3 7 0 7 14

Median/Crash Barrier Casting Works, Electric pole 6 7 0 13


4 Foundation work
12
5 Painting Work 4 4 4
7
6 Preparation for Electrical Cabling Work 3 0 4
Total NHAI Labour 24 11 23
58 Nos.

Manish Nagar RUB & ROB


Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

1 Bow String Girder Erection Works 29 0 5 34

2 RUB Mosaic Tiles Work 4 0 0 4

3 RUB Cleaning Work and Plaster work 2 0 6 8

4 Boundary Wall Construction Between P4 & P10 2 0 8 10

5 Manish Nagar & NHAI Connecting Slab Reinf Work 21 0 5 26


6 Stucco Plastering 5 0 0
5
7 Texture painting 8 0 0 8
8 Pump Room Construction @ P3 3 0 0
3
9 P10 Sump Water Proofing 1 0 2
3
Total Manish Nagar Labour 71 0 24
101 Nos.

Reach-1 Viaduct

Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

Strip Seal Exp Joint Ponding Test at Rahate


1 Station,Pier Arm Recess filling Work. 2 0 2 4

2 SS Railing Plate Welding and Grouting Work 8 0 0 8

Total Reach-1 Viaduct Labour 2 0 2 12


Nos.

Metro Mall
Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

1 Metro Mall Construction 12 0 17 29


Total Metro Mall Labour 29 Nos.
Total Metro Mall Labour 29 Nos.
Nos.
Daily Site Labour Report --20/05/2020 Total Labour 225
M/s NCC Ltd

NHAI Works
Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours
1 Preparation for Mastic Work 15 0 17 32

2 BC Preparation Works 4 0 8 12
Expansion Joint Fixing work
3 5 0 6 11
Median/Crash Barrier Casting Works, 6 7 0 13
4 Electric pole Foundation work
5 Painting Work 4 4 6 14

6 Preparation for Electrical Cabling Work 4 0 4 8

Total NHAI Labour 38 11 41


90 Nos.

Manish Nagar RUB & ROB


Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

1 Bow String Girder Erection Works 22 0 5 27

2 RUB Mosaic Tiles Work 4 0 0 4

3 RUB Cleaning Work and Plaster work 0 0 4 4

4 Boundary Wall Construction Between P4 & P10 3 0 7 10

5 Manish Nagar & NHAI Connecting Slab Reinf Work 23 0 10 33


6 Stucco Plastering 0 0 0
0
7 Texture painting 8 0 0 8
8 Pump Room Construction @ P3 2 0 0
2
9 P10 Sump Water Proofing 2 0 1
3
Total Manish Nagar Labour 60 0 26
91 Nos.

Reach-1 Viaduct

Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

Strip Seal Exp Joint Ponding Test at Rahate


1 Station,Pier Arm Recess filling Work. 3 0 3 6

2 SS Railing Plate Welding and Grouting Work 9 0 0 9

Total Reach-1 Viaduct Labour 3 0 3 15


Nos.

Metro Mall
Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

1 Metro Mall Construction 12 0 17 29


Total Metro Mall Labour 29 Nos.
Nos.
Daily Site Labour Report --21/05/2020 Total Labour 217
M/s NCC Ltd
NHAI Works
Labour Details

S.No Activity Skilled Semi Skilled Unskilled Total Labours


1 Preparation for Mastic Work 15 0 17 32

2 BC Preparation Works 5 0 10 15
Expansion Joint Fixing work
3 7 0 8 15
Median/Crash Barrier Casting Works, Electric 8 8 0 16
4 pole Foundation work
5 Painting Work 4 4 4 12

6 Preparation for Electrical Cabling Work 4 0 5 9

Total NHAI Labour 43 12 44


99 Nos.

Manish Nagar RUB & ROB


Labour Details

S.No Activity Skilled Semi Skilled Unskilled Total Labours

1 Bow String Girder Erection Works 27 0 4 31

2 RUB Mosaic Tiles Work 4 0 0 4

3 RUB Cleaning Work and Plaster work 2 0 5 7


Boundary Wall Construction Between P4 &
4 P10 3 0 7 10
Manish Nagar & NHAI Connecting Slab Reinf
5 Work 14 0 6 20
6 Stucco Plastering 0 0 0
0
7 Texture painting 8 0 0 8
8 Pump Room Construction @ P3 2 0 0
2
9 P10 Sump Water Proofing 2 0 1
3
Total Manish Nagar Labour 58 0 22
85 Nos.

Reach-1 Viaduct

Labour Details

S.No Activity Skilled Semi Skilled Unskilled Total Labours

Strip Seal Exp Joint Ponding Test at Rahate


1 Station,Pier Arm Recess filling Work. 2 0 2 4

2 SS Railing Plate Welding and Grouting Work 10 0 0 10

Total Reach-1 Viaduct Labour 12 0 2 14


Nos.

Metro Mall
Labour Details

S.No Activity Skilled Semi Skilled Unskilled Total Labours

1 Metro Mall Construction 10 0 9 19


Total Metro Mall Labour 10 0 9 19 Nos.
Nos.
Daily Site Labour Report --22/05/2020 Total Labour 205
M/s NCC Ltd

NHAI Works
Labour Details

S.No Activity Skilled Semi Skilled Unskilled Total Labours


1 Preparation for Mastic Work 15 0 17 32

2 BC Preparation Works 0 0 0 0
Expansion Joint Fixing work
3 11 0 12 23
Median/Crash Barrier Casting Works, Electric 8 7 0 15
4 pole Foundation work
5 Painting Work 10 10 0 20

6 Preparation for Electrical Cabling Work 4 5 0 9

Total NHAI Labour 48 22 29


99 Nos.

Manish Nagar RUB & ROB


Labour Details

S.No Activity Skilled Semi Skilled Unskilled Total Labours

1 Bow String Girder Erection Works 27 0 4 31

2 RUB Mosaic Tiles Work 4 0 0 4

3 RUB Cleaning Work and Plaster work 2 0 4 6


Boundary Wall Construction Between P4 &
4 P10 2 0 5 7
Manish Nagar & NHAI Connecting Slab Reinf
5 Work 17 0 3 20
6 Stucco Plastering 0 0 0
0
7 Texture painting 0 0 0 0
8 Pump Room Construction @ P3 1 0 0
1
9 P10 Sump Water Proofing 1 0 2
3
10 Electrical Cabling 4 0 0
4
Total Manish Nagar Labour 52 0 16
76 Nos.

Reach-1 Viaduct

Labour Details

S.No Activity Skilled Semi Skilled Unskilled Total Labours

Strip Seal Exp Joint Ponding Test at Rahate


1 Station,Pier Arm Recess filling Work. 2 0 2 4

2 SS Railing Plate Welding and Grouting Work 10 0 0 10

Total Reach-1 Viaduct Labour 12 0 2 14


Nos.

Metro Mall
Labour Details

S.No Activity Skilled Semi Skilled Unskilled Total Labours

1 Metro Mall Construction 10 0 6 16


Total Metro Mall Labour 10 0 6 16 Nos.
Nos.
Daily Site Labour Report --23/05/2020
M/s NCC Ltd
Total Labour 203

NHAI Works
Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours
1 Preparation for Mastic Work 15 0 17 32

2 BC Preparation Works 0 0 0 0
Expansion Joint Fixing work
3 10 0 9 19
Median/Crash Barrier Casting Works, Electric 8 9 0 17
4 pole Foundation work
5 Painting Work 7 6 0 13

6 Preparation for Electrical Cabling Work 4 5 0 9

Total NHAI Labour 44 20 26


90 Nos.

Manish Nagar RUB & ROB


Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

1 Bow String Girder Erection Works 27 0 4 31

2 RUB Mosaic Tiles Work 8 0 0 8

3 RUB Cleaning Work and Plaster work 1 0 2 3

4 Boundary Wall Construction Between P4 & P10 0 0 6 6


Manish Nagar & NHAI Connecting Slab Reinf
5 Work 10 0 7 17
6 Stucco Plastering 0 0 0
0
7 Texture painting 0 0 0 0
8 Pump Room Construction @ P3 1 0 0
1
9 P10 Sump Water Proofing 1 0 2
3
10 Electrical Cabling 4 0 0
4

11
P10 Bearing pedestal Concreting & P9 Pedestal 3 0 3
Curing. 6

12 RUB Outer Crash Barrier painting 3 0 0


3
Total Manish Nagar Labour 46 0 19
82 Nos.

Reach-1 Viaduct

Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

Strip Seal Exp Joint Ponding Test at Rahate


1 Station,Pier Arm Recess filling Work. 2 0 2 4

2 SS Railing Plate Welding and Grouting Work 10 0 0 10

Total Reach-1 Viaduct Labour 12 0 2 14


Nos.

Metro Mall
Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

1 Metro Mall Construction 10 0 7 17


Total Metro Mall Labour 10 0 7 17 Nos.
Nos.
Daily Site Labour Report --24/05/2020
M/s NCC Ltd
Total Labour 166

NHAI Works
Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours
1 Preparation for Mastic Work 15 0 17 32
2 BC Preparation Works 0 0 0 0
3 Expansion Joint Fixing work 0 0 3 3
Median/Crash Barrier Casting Works, Electric 8 9 0 17
4 pole Foundation work
5 Painting Work 8 9 0 17

6 Preparation for Electrical Cabling Work 4 5 0 0

Total NHAI Labour 35 23 20


69 Nos.

Manish Nagar RUB & ROB


Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

1 Bow String Girder Erection Works 29 0 4 33

2 RUB Mosaic Tiles Work 8 0 0 8

3 RUB Cleaning Work and Plaster work 1 0 2 3

4 Boundary Wall Construction Between P4 & P10 2 0 4 6


Manish Nagar & NHAI Connecting Slab Reinf
5 Work 0 0 5 5
6 Stucco Plastering 0 0 0
0
7 Texture painting 0 0 0 0
8 Pump Room Construction @ P3 1 0 0
1
9 P10 Sump Water Proofing 1 0 2
3
10 Electrical Cabling 2 0 0
2

11
P10 Bearing pedestal Concreting & P9 Pedestal 0 0 3
Curing. 3

12 RUB Outer Crash Barrier painting 3 0 0


3
Total Manish Nagar Labour 40 0 15
67 Nos.

Reach-1 Viaduct

Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

Strip Seal Exp Joint Ponding Test at Rahate


1 Station,Pier Arm Recess filling Work. 2 0 2 4

2 SS Railing Plate Welding and Grouting Work 10 0 0 10

Total Reach-1 Viaduct Labour 12 0 2 14


Nos.

Metro Mall
Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

1 Metro Mall Construction 6 0 10 16


Total Metro Mall Labour 6 0 10 16 Nos.
Total Metro Mall Labour 6 0 10 16 Nos.
Nos.
Daily Site Labour Report --25/05/2020
M/s NCC Ltd
Total Labour 171
NHAI Works
Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours
1 Preparation for Mastic Work 15 0 17 32

2 BC Preparation Works 0 0 0 0
Expansion Joint Fixing work
3 10 0 10 20
Median/Crash Barrier Casting Works, Electric 9 9 0 18
4 pole Foundation work
5 Painting Work 2 2 0 4

6 Preparation for Electrical Cabling Work 4 5 0 9

Total NHAI Labour 40 16 27


83 Nos.

Manish Nagar RUB & ROB


Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

1 Bow String Girder Erection Works 0 0 0 0

2 RUB Mosaic Tiles Work 8 0 0 8

3 RUB Cleaning Work and Plaster work 2 0 4 6

4 Boundary Wall Construction Between P4 & P10 4 0 3 7


Manish Nagar & NHAI Connecting Slab Reinf
5 Work 8 0 8 16
6 Stucco Plastering 0 0 0
0
7 Texture painting 0 0 0 0
8 Pump Room Construction @ P3 1 0 2
3
9 P10 Sump Water Proofing 1 0 2
3
10 Electrical Cabling 2 0 0
2

11
P10 Bearing pedestal Concreting & P9 Pedestal 0 0 3
Curing. 3

12 RUB Outer Crash Barrier painting 3 0 0


3
Total Manish Nagar Labour 22 0 15
51 Nos.

Reach-1 Viaduct

Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

Strip Seal Exp Joint Ponding Test at Rahate


1 Station,Pier Arm Recess filling Work. 2 0 2 0

2 SS Railing Plate Welding and Grouting Work 10 0 0 10

Total Reach-1 Viaduct Labour 12 0 2 10


Nos.

Metro Mall
Labour Details
Semi
S.No Activity Skilled Skilled Unskilled Total Labours

1 Metro Mall Construction 8 0 19 27


Total Metro Mall Labour 8 0 19 27 Nos.
Nos.

You might also like