1. PURPOSE
2. SCOPE
3. RESPONSIBILITIES
4. DESCRIPTION OF OPERATIONS
FIGURE 1 PREPARATION
FIGURE 2 VERTICAL CABLE SLACK
Signature: Signature:
Date: Date:
WORK PROCEDURES – MINING CONTRACTING – MSS 1303 SHAFT SINKING – CABLE LOWERING
WORK PROCEDURES
RUC Number
Date
:
:
MSS 1303
01/10/98
MINING CONTRACTING
Rev : 1
SHAFT SINKING – CABLE LOWERING Page : 2 of 6
1. PURPOSE
To establish a safe and effective method of lowering electrical cables in shaft during sinking
operations.
2. SCOPE
2.1 Preparation.
2.2 Lowering Cables.
2.3 Safety Precautions.
3. RESPONSIBILITIES
The Engineering Foreman together with the Site Electricians is responsible to ensure that the
requirements of this procedure are met.
4. DESCRIPTION OF OPERATIONS
Cable slack to be rolled off each drum for 5.0m, between drum and clamp.
WORK PROCEDURES – MINING CONTRACTING – MSS 1303 SHAFT SINKING – CABLE LOWERING
WORK PROCEDURES
RUC Number
Date
:
:
MSS 1303
01/10/98
MINING CONTRACTING
Rev : 1
SHAFT SINKING – CABLE LOWERING Page : 3 of 6
- Tighten second set of clamps to prevent run away when cables are
lowered.
When the stage has locked after lowering for lashing, the cable lowering
winch is to be switched on and driver notified.
Signal 4-2 is given to the driver and the cables are guided and slowly lowered
down.
The cable lowering winch will take up the slack and trip after it has lowered
the cable 5.0m.
WORK PROCEDURES – MINING CONTRACTING – MSS 1303 SHAFT SINKING – CABLE LOWERING
WORK PROCEDURES
RUC Number
Date
:
:
MSS 1303
01/10/98
MINING CONTRACTING
Rev : 1
SHAFT SINKING – CABLE LOWERING Page : 4 of 6
Install the cable bracket and clamp. Secure all nuts and bolts.
WORK PROCEDURES – MINING CONTRACTING – MSS 1303 SHAFT SINKING – CABLE LOWERING
WORK PROCEDURES
RUC Number
Date
:
:
MSS 1303
01/10/98
MINING CONTRACTING
Rev : 1
SHAFT SINKING – CABLE LOWERING Page : 5 of 6
WORK PROCEDURES – MINING CONTRACTING – MSS 1303 SHAFT SINKING – CABLE LOWERING
WORK PROCEDURES
RUC Number
Date
:
:
MSS 1303
01/10/98
MINING CONTRACTING
Rev : 1
SHAFT SINKING – CABLE LOWERING Page : 6 of 6
WORK PROCEDURES – MINING CONTRACTING – MSS 1303 SHAFT SINKING – CABLE LOWERING