Beam Design

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 21

1 2 3 3'

TB-1 TB-1 TB-1


B
TB-3
TB-2 TB-2 TB-2 TB-2

A
TB-1 TB-1 TB-1

Plinth Beam Layout (T.O.C-RL.-469.400m)

Beam
Beam Size Reinforcement Stirrups
Mkd.
B(mm) D(mm) Top Bottom
TB-1 300 600 4-T16 4-T16 2L-10T@150c/c
TB-2 400 600 4-T20 3-T20 2L-10T@200c/c
TB-3 250 400 3-T16 3-T16 2L-10T@150C/C

1B1 1B1 1B1

1B4

1B4 1B4 1
1 B
1 B 1 4
1 B 3 1B4
B
B 3 3
2 1
1 1 B
1B3 B 1B3
B 2
2 1 2
1 B
B 1B3 1B3 3
4

1B3 1B3
Y X
Z
Load 2055

1B1 1B1 1B1


1st Floor Beam Layout

Beam
Mkd. Beam Size Reinforcement Stirrups

B(mm) D(mm) Top Bottom


1B1 300 600 4-T20 4-T20 2L-10T@175 C/C
1B2 400 600 6-T25 6-T25 2L-10T@150 C/C
1B3 300 450 4-T20 4-T20 2L-10T@125 C/C
1B4 250 400 3-T16 3-T16 2L-10T@125 C/C
2B1 2B1 2B1

2B3 2B3
2B5 2
2
B 2 2 2 B
2 B B B 2
4 2 4 2
B
2B3 2B3 2

Y X
Z
Load 2055

2B1 2B1 2B1

2nd floor beam layout

Beam
Beam Size Reinforcement Stirrups
Mkd.
B(mm) D(mm) Top Bottom
2B1 300 600 4-T25 4-T20 2L-10T@150 c/c
2B2 400 600 4-T25 4-T25 2L-10T@150 c/c
2B3 300 450 3-T16 3-T16 2L-10T@150 c/c
2B4 400 600 3-T20 4-T25 2L-10T@200 c/c
2B5 250 400 3-T12 3-T16 2L-10T@200 c/c

RB1 RB1 RB1

R R RB4
B B
3 3
R R
B R B
2 B 2
RB3 R RB3
B 2
2
Y X
Z
Load 2055

RB1 RB1 RB1

Roof Beam layout

Beam
Mkd. Beam Size Reinforcement Stirrups

B(mm) D(mm) Top Bottom


RB1 300 600 3-T20 3-T16 2L-10T@175 C/C
RB2 400 600 4-T20 4-T25 2L-10T@200 C/C
RB3 300 500 3-T20 3-T20 2L-10T@200 C/C
RB4 250 400 3-T16 3-T16 2L-10T@175 C/C
SB1

SB1 SB2 SB1

YX
Z
Load 2055

SB1
Stair roof beam Layout

Beam
Beam Size Reinforcement Stirrups
Mkd.
B(mm) D(mm) Top Bottom
SB1 300 600 3-T16 3-T16 2L-10T@175 C/C
SB2 250 400 2-T12 2-T16 2L-10T@200 C/C
Design Of interior Beam : (As T Beam)

Loading Data:

Axial Shear Torsion Bending


Beam d Fx Fy Fz Mx My Mz
(m) (Mton) (Mton) (Mton) (MTon-m)(MTon-m) (MTon-m)
Max Fx 9 2027 0.0 2.5 6.2 0.0 0.2 0.0 7.9
Min Fx 6 2053 0.0 -4.9 7.6 0.0 -0.4 0.0 8.1
Max Fy 9 2036 0.0 -4.4 9.1 0.0 0.3 0.0 10.2
Min Fy 8 2036 6.6 -3.6 -9.5 0.0 -0.3 0.0 10.8
Max Fz 7 2064 0.0 -2.3 3.6 0.0 0.0 -0.1 2.7
Min Fz 10 2018 0.0 0.1 3.3 -0.1 0.1 0.1 1.6
Max Mx 9 2037 0.0 -4.5 7.8 0.0 0.4 0.0 8.7
Min Mx 6 2037 0.0 -4.8 7.7 0.0 -0.4 0.0 8.2
Max My 10 2018 0.0 0.1 3.3 -0.1 0.1 0.1 1.6
Min My 8 2051 6.6 -4.0 -8.2 0.0 -0.3 -0.1 9.4
Max Mz 5 2055 6.6 -4.4 -8.6 0.0 0.2 0.0 11.0
Min Mz 8 2036 3.3 -3.6 -0.6 0.0 -0.3 0.0 -5.6

Maximum Support Moment:Mu = 10.963 T-m = 79.29538 kip-ft


Maximumn Span Moment: Mu = 5.6 T-m = 40.77 kip-ft
Maximum shear Force : 9.1 T = 20.15999 kip

Parameters:
Concrete characteristic strength,fc' = 25 N/mm2 = 3625.95 psi

Reinforcement yield stress,fy = 420 N/mm2 = 60915.96 psi

λ for normal weight concrete = 1

Beam Size:
Width =bw= 300 mm = 11.8 in
Depth = D = 600 mm = 23.6 in
Clear cover = 35 mm = 1.4 in
Column Size:
Width= 450 mm = 17.7 in
Depth= 450 mm = 17.7 in

Span length of beam = 3.275 m = 10.74 ft


Tributory width = Sw = 3.66 m = 12.0 ft

Slab thickness = hslab 150 mm = 5.91 in

Longitudinal reinforcement Dia=d b = 19 mm = 0.75 in


Stirrups- Dia = dtie = 10 mm = 0.39 in

Effective depth =d= 545.5 mm = 21.5 in

Calculation:

Flange width = bf = bw + 2x Min( 8Xhslab, Sw/2,ln/8)

8 X hslab = 1200 mm = 47.24 in


Sw /2 = 1830 mm = 72.05 in
ln/8 = 353 mm = 13.90 in

bf = 1006 mm = 39.62 in

Equivalent concrete compressive depth=a = β1c

Where, β1 = 0.85

In Beam, compressive force = Tensile force, C=T

So, 0.85fc'xbxa = Asxfy

For, span moment ,b = bf= 39.62 in

For, Support moment =b= 11.8 in

So, for Span moment = a= 0.50 x As


For support moment =a= 1.67 x As

M u ≤ φ Mn

Where, φ = 0.9
Mn = As x fy x(d- a/2)

For Support moment


φMn = 54824.364 As X ( 21.5 - 1.67 x As / 2 )
So, 17.35624 = 21.5 As - 0.84 As2
As2 + -25.7 As + 20.74353 = 0
As = 0.83534 in 2
= 538.9281 mm2

For Span moment


φMn = 54824.364 As X ( 21.5 - 0.50 x As / 2 )

So, 8.922716 = 21.5 As - 0.25 As2


As2 + -86.1 As + 35.76917 = 0
As = 0.42 in2 = 269.3485 mm2

Minimum Reinforcement:

As = 3x√fc'/fyxbwxd = 485.3076 mm2 = 0.75 in2

As = 200/fyxbwxd = 537.2976 mm2 = 0.83 in2

So, Minimum reinforcement,As = 537.2976 mm2 = 0.83 in2

Provided, As at support Top = 538.9281 mm2 = 0.84 in2

Provided, As at span bottom = 537.2976 mm2 = 0.83 in2

Shear Design:

Shear strength, φVn ≥ Vu

Where, φ= 0.75
Vn = Vc + Vs
Vu = 20.16 kips

Vc = 2√fc'xbw x d = 30.55 kips

φVc = = 22.91 kips

Shear reinforcement not required

Cross sectional dimension checking:

Vu≤φ(Vc +8√fc' xbw x d) = = 114.6 kips

>Vu,Sectional dimension is ok
Shear Reinforcement:

φVs ≥ Vu - φVc

Where, Vs = Av x fy x d/s

φVs = 0.00 kips

Av = 157.08 mm2 = 0.24 in2


(For 10 dia 2-legged stirrups)

s= NA in

so, Maximum stirrup spacing = 10.7 in

Provide stirrup 10 dia-2L @ 8 inch c/c =2-L-10 Dia @250 C/c



Design Of interior Beam : (As T Beam)

Loading Data:

Axial Shear Torsion Bending


Beam d Fx Fy Fz Mx My Mz
(m) (Mton) (Mton) (Mton) (MTon-m)(MTon-m) (MTon-m)
Max Fx 168 2029 0.0 -0.2 -0.7 0.0 0.3 0.1 -7.4
Min Fx 2 2037 0.0 -10.9 2.5 0.0 0.0 0.0 4.2
Max Fy 3 2053 0.0 -5.2 13.5 0.1 1.1 -0.2 19.2
Min Fy 167 2051 4.4 -5.2 -12.4 0.0 -0.8 -0.1 18.5
Max Fz 3 2053 0.0 -5.2 13.5 0.1 1.1 -0.2 19.2
Min Fz 4 2064 0.0 -2.1 6.4 0.0 -0.3 0.1 2.8
Max Mx 3 2037 0.0 -5.8 12.6 0.0 1.4 0.0 14.4
Min Mx 4 2002 0.0 -1.0 12.5 0.0 -1.3 0.0 14.1
Max My 168 2053 4.4 -2.8 -9.2 0.1 0.6 0.1 6.7
Min My 3 2053 0.0 -5.2 13.5 0.1 1.1 -0.2 19.2
Max Mz 3 2018 0.0 -3.4 13.4 0.0 1.0 -0.1 19.7
Min Mz 4 2051 2.9 -2.8 2.9 0.0 -0.9 -0.1 -12.0

Maximum Support Moment:Mu = 19.738 T-m = 142.765 kip-ft


Maximumn Span Moment: Mu = 12.0 T-m = 86.98 kip-ft
Maximum shear Force : 13.5 T = 29.6438 kip

Parameters:
Concrete characteristic strength,fc' = 25 N/mm2 = 3625.95 psi

Reinforcement yield stress,fy = 420 N/mm2 = 60915.96 psi

λ for normal weight concrete = 1

Beam Size:
Width =bw= 400 mm = 15.7 in
Depth = D = 600 mm = 23.6 in
Clear cover = 35 mm = 1.4 in
Column Size:
Width= 450 mm = 17.7 in
Depth= 450 mm = 17.7 in

Span length of beam = 3.275 m = 10.74 ft


Tributory width = Sw = 3.66 m = 12.0 ft

Slab thickness = hslab 150 mm = 5.91 in

Longitudinal reinforcement Dia=d b = 19 mm = 0.75 in


Stirrups- Dia = dtie = 10 mm = 0.39 in

Effective depth =d= 545.5 mm = 21.5 in

Calculation:

Flange width = bf = bw + 2x Min( 8Xhslab, Sw/2,ln/8)

8 X hslab = 1200 mm = 47.24 in


Sw /2 = 1830 mm = 72.05 in
ln/8 = 353 mm = 13.90 in

bf = 1106 mm = 43.55 in

Equivalent concrete compressive depth=a = β1c

Where, β1 = 0.85

In Beam, compressive force = Tensile force, C=T

So, 0.85fc'xbxa = Asxfy

For, span moment ,b = bf= 43.55 in

For, Support moment =b= 15.7 in

So, for Span moment = a= 0.45 x As


For support moment =a= 1.26 x As

M u ≤ φ Mn

Where, φ = 0.9
Mn = As x fy x(d- a/2)

For Support moment


φMn = 54824.364 As X ( 21.5 - 1.26 x As / 2 )
So, 31.24851 = 21.5 As - 0.63 As2
As2 + -34.2 As + 49.79608 = 0
As = 1.522773 in 2
= 982.4321 mm2

For Span moment


φMn = 54824.364 As X ( 21.5 - 0.45 x As / 2 )

So, 19.03914 = 21.5 As - 0.23 As2


As2 + -94.6 As + 83.90861 = 0
As = 0.89 in2 = 577.404 mm2

Minimum Reinforcement:

As = 3x√fc'/fyxbwxd = 647.0768 mm2 = 1.00 in2

As = 200/fyxbwxd = 716.3968 mm2 = 1.11 in2

So, Minimum reinforcement,As = 716.3968 mm2 = 1.11 in2

Provided, As at support Top = 982.4321 mm2 = 1.52 in2

Provided, As at span bottom = 716.3968 mm2 = 1.11 in2

Shear Design:

Shear strength, φVn ≥ Vu

Where, φ= 0.75
Vn = Vc + Vs
Vu = 29.64 kips

Vc = 2√fc'xbw x d = 40.73 kips

φVc = = 30.55 kips

Shear reinforcement not required

Cross sectional dimension checking:

Vu≤φ(Vc +8√fc' xbw x d) = = 152.7 kips

>Vu,Sectional dimension is ok
Shear Reinforcement:

φVs ≥ Vu - φVc

Where, Vs = Av x fy x d/s

φVs = 0.00 kips

Av = 157.08 mm2 = 0.24 in2


(For 10 dia 2-legged stirrups)

s= NA in

so, Maximum stirrup spacing = 10.7 in

Provide stirrup 10 dia-2L @ 8 inch c/c =2-L-10 Dia @250 C/c



Design Of interior Beam : (As T Beam)

Loading Data:

Axial Shear Torsion Bending


Beam d Fx Fy Fz Mx My Mz
(m) (Mton) (Mton) (Mton) (MTon-m)(MTon-m) (MTon-m)
Max Fx 41 2050 0.0 1.2 7.7 0.0 0.7 0.0 7.4
Min Fx 43 2016 0.0 -1.6 13.7 0.0 -0.6 0.0 15.8
Max Fy 39 2037 0.0 0.4 17.8 0.0 -0.7 -0.1 17.8
Min Fy 114 2002 0.8 -0.3 -21.3 0.0 -0.7 0.0 23.6
Max Fz 114 2030 0.0 -1.2 -10.6 0.2 -0.1 0.1 5.2
Min Fz 114 2052 0.0 0.1 -17.1 -0.2 -0.5 -0.1 8.1
Max Mx 41 2002 0.0 0.1 6.6 0.0 0.8 0.0 5.7
Min Mx 44 2002 0.0 -0.7 6.3 0.0 -0.9 0.1 5.4
Max My 39 2028 0.0 -0.9 10.4 -0.1 -0.2 0.3 9.7
Min My 39 2053 0.0 -0.5 16.2 0.2 -0.5 -0.4 15.9
Max Mz 114 2002 0.8 -0.3 -21.3 0.0 -0.7 0.0 23.6
Min Mz 111 2002 0.0 -0.3 -2.6 0.0 -0.7 0.0 -16.0

Maximum Support Moment:Mu = 23.635 T-m = 170.952 kip-ft


Maximumn Span Moment: Mu = 16.0 T-m = 115.51 kip-ft
Maximum shear Force : 17.8 T = 39.121 kip

Parameters:
Concrete characteristic strength,fc' = 25 N/mm2 = 3625.95 psi

Reinforcement yield stress,fy = 420 N/mm2 = 60915.96 psi

λ for normal weight concrete = 1

Beam Size:
Width =bw= 300 mm = 11.8 in
Depth = D = 600 mm = 23.6 in
Clear cover = 35 mm = 1.4 in
Column Size:
Width= 450 mm = 17.7 in
Depth= 450 mm = 17.7 in

Span length of beam = 3.275 m = 10.74 ft


Tributory width = Sw = 3.66 m = 12.0 ft

Slab thickness = hslab 150 mm = 5.91 in

Longitudinal reinforcement Dia=d b = 19 mm = 0.75 in


Stirrups- Dia = dtie = 10 mm = 0.39 in

Effective depth =d= 545.5 mm = 21.5 in

Calculation:

Flange width = bf = bw + 2x Min( 8Xhslab, Sw/2,ln/8)

8 X hslab = 1200 mm = 47.24 in


Sw /2 = 1830 mm = 72.05 in
ln/8 = 353 mm = 13.90 in

bf = 1006 mm = 39.62 in

Equivalent concrete compressive depth=a = β1c

Where, β1 = 0.85

In Beam, compressive force = Tensile force, C=T

So, 0.85fc'xbxa = Asxfy

For, span moment ,b = bf= 39.62 in

For, Support moment =b= 11.8 in

So, for Span moment = a= 0.50 x As


For support moment =a= 1.67 x As

M u ≤ φ Mn

Where, φ = 0.9
Mn = As x fy x(d- a/2)

For Support moment


φMn = 54824.364 As X ( 21.5 - 1.67 x As / 2 )
So, 37.4181 = 21.5 As - 0.84 As2
As2 + -25.7 As + 44.72073 = 0
As = 1.879987 in 2
= 1212.892 mm2

For Span moment


φMn = 54824.364 As X ( 21.5 - 0.50 x As / 2 )

So, 25.28314 = 21.5 As - 0.25 As2


As2 + -86.1 As + 101.3545 = 0
As = 1.19 in2 = 770.1967 mm2

Minimum Reinforcement:

As = 3x√fc'/fyxbwxd = 485.3076 mm2 = 0.75 in2

As = 200/fyxbwxd = 537.2976 mm2 = 0.83 in2

So, Minimum reinforcement,As = 537.2976 mm2 = 0.83 in2

Provided, As at support Top = 1212.892 mm2 = 1.88 in2

Provided, As at span bottom = 770.1967 mm2 = 1.19 in2

Shear Design:

Shear strength, φVn ≥ Vu

Where, φ= 0.75
Vn = Vc + Vs
Vu = 39.12 kips

Vc = 2√fc'xbw x d = 30.55 kips

φVc = = 22.91 kips

Shear reinforcement required

Cross sectional dimension checking:

Vu≤φ(Vc +8√fc' xbw x d) = = 114.6 kips

>Vu,Sectional dimension is ok
Shear Reinforcement:

φVs ≥ Vu - φVc

Where, Vs = Av x fy x d/s

φVs = 16.21 kips

Av = 157.08 mm2 = 0.24 in2


(For 10 dia 2-legged stirrups)

s= 14.738 in

so, Maximum stirrup spacing = 10.7 in

Provide stirrup 10 dia-2L @ 8 inch c/c =2-L-10 Dia @250 C/c


Max Fx 41 2050 0 1.192 7.672 -0.019 0.674
Min Fx 43 2016 0 -1.582 13.693 0.007 -0.604
Max Fy 39 2037 0 0.357 17.75 0.022 -0.651
Min Fy 114 2002 0.75 -0.31 -21.326 0.017 -0.651
Max Fz 114 2030 0 -1.225 -10.609 0.197 -0.149
Min Fz 114 2052 0 0.11 -17.074 -0.199 -0.538
Max Mx 41 2002 0 0.082 6.574 -0.008 0.811
Min Mx 44 2002 0 -0.652 6.336 -0.036 -0.9
Max My 39 2028 0 -0.927 10.398 -0.147 -0.23
Min My 39 2053 0 -0.522 16.184 0.161 -0.462
Max Mz 114 2002 0.75 -0.31 -21.326 0.017 -0.651
Min Mz 111 2002 0 -0.304 -2.569 0.004 -0.651

0.028 7.434
-0.048 15.75
-0.051 17.786
0.034 23.635
0.103 5.227
-0.071 8.099
0.008 5.743
0.058 5.374
0.323 9.696
-0.351 15.854
0.034 23.635
0.009 -15.97