Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

BILLS OF QUANTITY

Date: 25-07-2020
Company Name: SPECTRUM LIGHT BLOCK FACTORY L.L.C
Project: Toilet Renovation Work
location: ICAD 1, Abu Dhabi | United Arab Emirates

Unit
S.No Description Unit Quantity Price Total
ABLUTION AREA:
1 Supply and Installation of Floor Tiles 4m×2 m 8 60 480
2 Supply and Installation of Wall Tiles 12m ×2.5m 30 60 1800
3 Supply and installation of New Marble SIZE-(22×90) 1 22×90 100 100
4 Supply and installation wash basin mirror SIZE-(22×9) 2 22×9 80 160
5 Supply and installation of Wash basin & Mixer 2 400 800
6 Supply and installation of floor top cover SIZE-(15×15) 4 75 300
7 Supply and installation of New Angle wall 4 25 100
8 Supply and installation of Garden Tap 4 25 100
TOILET AREA:
9 Supply and Installation of Wall Tiles 2.5m×8.6m 21.5 60 1290
10 Supply and installation of wall tiles in
urinal area 2.5m×12.6m 31.5 60 1890
11 Supply and installation of new tiles in
urinal area 2.6m×4m 10.4 60 624
12 Supply and installation of Urinal toilet bowl 4 450 1800
13 Supply and installation of urinal partition Ceramic 3 150 450
14 Supply and installation of Arabic Toilet with Flash tank 2 350 700
15 Supply and installation of WC Toilet with Flash tank 1 800 800
16 Supply and installation of PBC pipe L/S 300
17 Supply and installation of Aluminium door with Frame 3 76×220 800 2400
18 Supply and installation of floor top cover SIZE-(15×15) 1 75 75
19 Supply and installation of Shattaf 3 75 225
20 Supply and installation of Angel wall 6 25 150
21 Supply and installation of PPR pipes L/S 1200
22 Supply and installation of Aluminium Ceiling in Entire area Per meter 19 m 100 1900
23 Supply and installation of LED down light 3 pcs 65 195
24 Supply and installation of LED panel (60×60) 6 pcs 120 720
25 Supply and installation of Exhaust fan (KDK BRAND)-6 inch 1 pcs 200 200
26 Supply and installation of New Glass for Exhaust fan 1 pcs 200 200
AMOUNT IN WORDS: EIGHTEEN THOUSAND NINE HUNDRED FIFTY NINE ONLY 18,959
VAT:
VAT @ 5% will be additional on the invoice value

You might also like