Professional Documents
Culture Documents
SMB10 - Target Costing
SMB10 - Target Costing
TARGET COSTING
TOTAL LIFE CYCLE COSTING
STAGE OF LIFE CYCLE BY TYPE OF PRODUCT
TARGET COSTING
Identify components
for cost reduction.
Choosing which components to
select requires computing a value
index.
Value Engineering
Generate cost
reduction and
function
enhancement ideas
Engineers engage in
creative thinking and
brainstorming to identify what can
be reduced, eliminated, combined,
substituted, rearranged, or
enhanced to provide the same or
higher level of functionality from a
component at less cost
concerns
ON TARGET COSTING
1 2 3 4
Lack of Poor Employee burnout Overly long
understanding of implementation of development time
the target costing the teamwork
concept concept