Assignment For Fundamentals of Construction Technology: Submitted by - Manasvi Sethi RP20023 Reuim - Batch 12
Assignment For Fundamentals of Construction Technology: Submitted by - Manasvi Sethi RP20023 Reuim - Batch 12
Assignment For Fundamentals of Construction Technology: Submitted by - Manasvi Sethi RP20023 Reuim - Batch 12
RP20023@ms.nicmar.ac.in
Assignment
2. Explain the process of execution of raft foundation work for Petronas Towers.
Arrangement of huge Piles were utilized around the profundity of 120 meter down through
the hard soil layers underneath. Since, no legitimate review was accomplished for the
establishment and it was discovered later that the dirt had rotted limestone on one side and
opposite side was on the edge of the precipice milder weak stone which would disintegrate
under enormous load of the pinnacle.
Immense solid pontoon was developed with heaps on the base which took 52 hours of
cementing with no break. To handle awful climate condition, for example, downpour the
establishment chunk was covered by bazaar tents (56).
5. Discuss the significance of the connecting bridge between the two towers.
It was an emblematic door to the new Malaysia. Yet, the significant explanation was for
crisis administrations (fire wellbeing for instance). Thus, in crisis individuals can move
between various towers without any problem. Indeed, even air stream testing was
accomplished for the scaffold to permit extension to move openly.
Assignment
1.Bulldozer
2.Loader
3.Excavato
4.Tower crane
5.Paver
6.Stevens
7.Grader
8.Batching plant