PT PLN (PERSERO) PT.

BARATA INDONESIA

DESIGN CHANGE REQUEST PT.DALLE ENGINEERING


CONSTRUCTION
LUWUK GAS ENGINE
POWER PLANT 40 MW (DCR) PT.MITRA ENERGI
BATAM

To : PT PLN (Persero) UIP SULBAGUT (Owner)


PT Prima Layanan Nasional Enjiniring (OE)

DCR NO. Subject : Date :


10-Mar-20
DCR-CVL-003 Design Change Request for Steel Structure (SS) Lightning Arrester (LA) IN
150 KV SWITCHYARD

DOCUMENT NO. REV : TITTLE :

LGE001-CSA-STR-101-10 1 150KV SS STELL STRUCTURE DISCONNECTING SWITCH W/EARTH (LA) SECTION &
DETAIL
LGE001-CSA-CAL-103 1 150 kV Switchyard Structure Calculation - Lightning Arrester (LA)

REASON AND CONTENT :

In previous document approved, there was only 1 type of Lightning Arrester (LA). But in actual there was needed separated
type between Lightning Arrester (LA) in Generator Transformer and Switchyard area. And also to accommodate cable
clearance in Town Feeder Transformer (TFT). For quantity type 1, 18 to be 15 and for type 2, 6 to be 9.

CONTRACTOR RESPON :

Adjust steel structure of Lightning Arrester (LA) in Town Feeder Transformer (TFT) area from height 3556 mm to 4056 mm,
except in TFT area, Steel structure design doesn’t change

OE'S COMMENT :

OWNER'S COMMENT :

SIGNATURE :

PT. BARATA INDONESIA - PT. DALLE ENGINEERING CONSTRUCTION - PT.


MITRA ENERGI BATAM
PT PLN (Persero) UIP SULBAGUT

DATE SIGN DATE SIGN

DESIGN 10-Mar-21 LKH REVIEW (OE)

CHECK 10-Mar-21 YPE CHECK (Owner)

APPROVED 10-Mar-21 RSH APPROVED (Owner)