Professional Documents
Culture Documents
Pro16-Fr01 - Rev.0c - Snap-Shot Report
Pro16-Fr01 - Rev.0c - Snap-Shot Report
Contract Number
005/SC/18
AND
Renewal Agreement No.005-SC-18-
SA2021
Contractor
ITALFLUID Geoenergy
Engineering
EPF – 20.000 BOPD
ITALFLUID Geoenergy
PRO16-FR01
SNAP-SHOT REPORT
Doc. Pos.
Client Sheet of Sheets
ZENHUA OIL Document Code 2 / 54
PRO16-FR01
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
PRO-16
REVISION LIST
HOLD RECORD
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
INDEX
1. SCOPE ............................................................................................................................ 4
2. CONTROL ROOM........................................................................................................... 4
3. PLANT ............................................................................................................................ 8
4. MCC AND UPS CABINS .............................................................................................. 37
5. HSE ............................................................................................................................... 39
6. LABORATORY EQUIPMENT ....................................................................................... 43
7. WORKSHOP EQUIPMENT ........................................................................................... 54
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
1. SCOPE
This report describes the actual plant status on 30th April 2021 at the hand over between Italfluid
and EBS.
2. CONTROL ROOM
Working stations
The main work station is composed by 2 fixed pc (1 pc for production and 1 for data record) and
3 screen (2 screens for production and 1 screen for data record) + 1 printer.
A laptop is present in to control and record the data coming from the secondary flow meter.
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
3. PLANT
Chemical skids
The 4 skids are fully equipped and are feeding as per design
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Separators
The first and second separators are fully equipped and satisfy the design specification
First Separator
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Second Separator
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Desalters
The first and second desalters are fully equipped and satisfy the design specification
First desalter
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Second Desalter
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
KOM system
The 3 KOMs are working properly and are equipped as per design
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Smokeless
The 4 smokeless are complete and actually 2 of them are in production
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Skimmer system
The skimmer is fully equipped and the 2 pumps are working in auto mode
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
MCC CABIN
All the panels in MCC are fully connected and powered. The cabin is properly air conditioned.
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
UPS cabin
The UPS cabin is fully connected and powered. The cabin is properly air conditioned and tha
batteries are in good conditions.
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
5. HSE
HSE Equipment
All the requested and necessary certified equipment and safety signs are in place
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Fire&fighting systems
The fire&fighting system is fully functional and has been subjected to tests during the hand
over with a positive result.
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
6. LABORATORY EQUIPMENT
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Name :2 scales
Situation: work healthy
Date : 30/4/2021
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
Contractor
Date Rev.
ITALFLUID Geoenergy S.r.l.
Document Title
Engineering
ITALFLUID Geoenergy S.r.l. SNAP-SHOT REPORT 30/04/2021 0
7. WORKSHOP EQUIPMENT
Italfluid left the workshop container containing some equipment and the spare parts requested
by EBS.