Professional Documents
Culture Documents
MIS Framework 12-02-2021
MIS Framework 12-02-2021
Work at a Glance
Nos of
District Sanctioned Sanctioned Nos of Nos of in
Approved
Name Year Ammount (Cr.) Completed Progress Work
Works
tioned Length Now to be Started
pleted Length Cost of Now to be Started (Cr.)
Now to be
Started Works
1 1 State
Sr. No. State Name State/UT State Type
1 Andhra Pradesh AndhraPradesh Regular
2 2 Phase
Sr. No. Phase Number State/UT State Type
1 Phase-I AndhraPradesh Regular
2 Phase-II AndhraPradesh Regular
3 3 Project Type
4 4 Package / Division
5 5 Assembley Constituency
Sr. No. Assembley Constituency R&B Division Phase Number
1
2
6 6 Agency/Contractor
Sr. No. Agency/ Contractor PAN First Name
7 7 Target Work
Sr. No. R&B Division Financial Year Phase Number
8 8 Road Detailes
Sr. No. Road Number Phase Number Project Name
Action
Add/Delete
Add/Delete
NDB Senctioned
NDB Sanctioned No of Bridges
Ammount State Name Action
Length (in Km) Reconstructing
(INR in Cr.)
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Package Number R&B Division Name of Work Location Detailes Length From
Material / Activity
PIN Code Moble Phone Fax Email
Earthwork Agreegate Ciment
l / Activity
Remark Included in R&B Action
Grid Matel
Yes/No Add/Delete
10 1 DPR Status
11 2 Encumbrance Detailes
12 3 Forest Clearance
14 5 Land Acqusition
15 6 Utility Relocation
Road Name of Road / Phase Project Package
Sr. No.
Number Location Detailes Number Name Number
Length of road
R&B Division Assembley Length From Length To Total Length (in proposed for Two-
Constituency Km)
Laning (in Km)
Assembley Length Affacted Length Affacted Total Length Likely Date of Taking
R&B Division
Constituency From Up-To Affacted (in Km) Over
Likely date of Likely date of Submission Likely date of Submission Likely date of Submission of
Submission of of Draft Detailed Feasibility of Final Detailed Feasibility Draft Detailed Project
Alignment Report Report Report Report
Add/Delete
Add/Delete
Targated
Work Status Action
Completion Date
Add/Delete
Targated
Work Status Action
Completion Date
Add/Delete
Targated Completion
Action
Date
Add/Delete
Add/Delete
Add/Delete
Targated Completion
Action
Date
Add/Delete
Add/Delete
Type of Bridge
Sub Structure
Sub Structure
Sub Structure
Sub Structure
Sub Structure
Sub Structure
17 1 Road Detailes
18 2 Road Reconstruction
19 3 Road Realignment
24 8 Major Bridge
25 9 Minor Bridge
26 10 Box Culverts
27 11 Pipe Culverts
Package Assembley
R&B Division Chanage Location Major Bridge No
Number Constituency
Package Assembley
Number R&B Division Constituency Chanage Location Minor Bridge No
Package Assembley
R&B Division Chanage Location Box Culvert No
Number Constituency
Package Assembley
R&B Division Chanage Location Pipe Culvert No
Number Constituency
Package Assembley
R&B Division Chanage Location Slab Culvert No
Number Constituency
TYPICAL CROSS SECTION SCHEDULE (In Nos.)
Total Length (in Strengtheni
Km) Overlay or ng with Flexible
Reconstruction Realignment
Widening WMM+DBM Pavement
+BC
TARGA
TYPICAL CROSS SECTION (Chainage) SCHEDULE
WIDENING / NEW CONSTRUCTIO
FROM CH (Km) TO CH (Km) LENGTH (Km) BC (mm) DBM (mm) WMM (mm)
TARGA
TYPICAL CROSS SECTION (Chainage) SCHEDULE
WIDENING / NEW CONSTRUCTIO
FROM CH (Km) TO CH (Km) LENGTH (Km) BC (mm) DBM (mm) WMM (mm)
TARGA
TYPICAL CROSS SECTION (Chainage) SCHEDULE
WIDENING / NEW CONSTRUCTIO
FROM CH (Km) TO CH (Km) LENGTH (Km) BC (mm) DBM (mm) WMM (mm)
TARGA
TYPICAL CROSS SECTION (Chainage) SCHEDULE
WIDENING / NEW CONSTRUCTIO
FROM CH (Km) TO CH (Km) LENGTH (Km) BC (mm) DBM (mm) WMM (mm)
TARGA
TYPICAL CROSS SECTION (Chainage) SCHEDULE
WIDENING / NEW CONSTRUCTIO
FROM CH (Km) TO CH (Km) LENGTH (Km) BC (mm) DBM (mm) WMM (mm)
TARGA
TYPICAL CROSS SECTION (Chainage) SCHEDULE
WIDENING / NEW CONSTRUCTIO
FROM CH (Km) TO CH (Km) LENGTH (Km) BC (mm) DBM (mm) WMM (mm)
Type of Work
Reconstruction/ Sub Super
Type of Structures (Pipe, Outer Width of Foundation
Rehabilitation/ Structure Structure
Slab, Box, Arch) Structure (In Km) (Nos)
Repair / Widening (Nos) (Nos)
Scheme
Type of Work
Reconstruction/ Sub Super
Type of Structures (Pipe, Outer Width of Foundation
Rehabilitation/ Slab, Box, Arch) Structure (In Km) (Nos) Structure Structure
Repair / Widening (Nos) (Nos)
Scheme
Type of Work
Reconstruction/ Sub Super Length
Outer Width of Structure Foundation (Nos)
Rehabilitation/ Structure Structure Completed
(In Km)
Repair / Widening (Nos) (Nos) Till Date (Km)
Scheme
Type of Work
Reconstruction/ Sub Super Length
Outer Width of Structure
Rehabilitation/ Foundation (Nos) Structure Structure Completed
(In Km)
Repair / Widening (Nos) (Nos) Till Date (Km)
Scheme
Type of Work
Reconstruction/ Sub Super Length
Outer Width of Structure
Rehabilitation/ Foundation (Nos) Structure Structure Completed
(In Km)
Repair / Widening (Nos) (Nos) Till Date (Km)
Scheme
Number of Major Number of Number of Number of Pipe Number of Slab
Rigid Bridge Minor Bridge Box Culverts Culverts Culverts
Pavement
Length
Completed
Targaed Comp. Date Work Status Action
Till Date
(Km)
Add/Delete
Length
Completed
Till Date Targaed Comp. Date Work Status Action
(Km)
Add/Delete
Targaed
Work Status Action
Comp. Date
Add/Delete
Add/Delete
Targaed
Work Status Action
Comp. Date
Add/Delete
Add/Delete
Targaed
Work Status Action
Comp. Date
Add/Delete
Add/Delete
Targated
Work Status Action
Completion Date
Add/Delete
Add/Delete
Action
Add/Delete
Action
Add/Delete
Action
Add/Delete
Action
Add/Delete
Action
Add/Delete
For Rigid
<60 mtrs
Type of Bridge
Sub Structure
From / To
29 1 Approved Work for Road
Road Name of Road /
Sr. No. Phase Number Project Name
Number Location Detailes
Edit/Delete
30 2 Technical Sanction
Package
Sr. No. Action Phase Number Project Name
Number
Edit/Delete
31 3 Tendre
Package
Sr. No. Action Phase Number Project Name
Number
Edit/Delete
Edit/Delete
33 6 Bill Detailes
Package
Sr. No. Action Phase Number Project Name
Number
Edit/Delete
34 7 Payment Details
Package
Sr. No. Action Phase Number Project Name
Number
Edit/Delete
Package
Gallery Sr. No. Phase Number Project Name
Number
Package
Gallery Sr. No. Phase Number Project Name Number
Package Assembley
R&B Division Year of Approval Adm. San. Date
Number Constituency
Assembley
R&B Division Name of Work Tendre Number Tendre Name
Constituency
Assembley
R&B Division Work Name Bill No Bill Date
Constituency
Assembley
R&B Division Bill No. Work Name CFMS Ref. No.
Constituency
Administrative
Assembley Administrative
R&B Division Constituency Year of Approval Senction Date Section Amount
(INR in Cr)
AS Amount (INR in Praposed Length
Work Name Contract Provision No of Bridges
Cr.) of Road in Km.
DBM (Km) WMM (Km) GSB (Km) Embarkment (Km) Foundation (Nos)
Deduction
CFMS Ammount (INR
CFMS Release Date Ammount (INR in Remark
in Cr.)
Cr.)
CD Work
Remark
Remark
Sub Structure Super Structure Work Status Completion Date Revised Maintenane
(Nos) (Nos) Completion Date
Contract Cost (Rs. Contract Period in
Above/ Below % Agency/ Contractor Tender Approval Date
in Lakhs) Months
Details of Length
No. of
substantially completed SQM Agency No of SRI Reports No. of Satisfactory
up to BC level (Road Name For SQM Report For SQM Unsatisfactory
Report For SQM
wise)
No. of ATR No. of ATR IQM Agency No of SRI Reports No of Satisfactory
IQM Visit
Approved Pending Name for IQM Reports For IQM
No. of
Remarks
Unsatisfactory Attachments
Reports For IQM
38 1 Final Road Data
Name of Work
District
Name of Work
1
2
Total
41 4 Works of Approval Bridge
Statement - Works Approved Report For Bridge
Username:
1
2
Total
1
2
Total
1
2
Total
1
2
Total (Vijayawada Circle)
3
4
Total (Krishna Circle)
Total
Total
1
2
Total (Vijayawada Circle)
3
4
Total (Krishna Circle)
Total
1
2
Total (Vijayawada Circle)
3
4
Total (Krishna Circle)
Total
1
2
Total
53 16 Status of Works
Statement 16 - Status of Works
Username:
Shree Shakti
3 Krishna Road-3 Construction,
Ahmedabad
Administrative
Package Number R&B Division Assembley Constituency Year of Approval Senction Date
Constituency Mandal
Administrative
Package Number R&B Division Assembley Constituency Year of Approval
Senction Date
Assembley Reconstruction
R&B Division
Constituency Nos. Length in Km Cost in Lacks
Approval Year:
Major Bridge
Assembley
R&B Division
Constituency Nos. Length in Km Cost in Lacks
Approval Year:
Approval Year:
Assembley Total Approved Works
R&B Division
Constituency Nos. Length in Km Cost in Lacks
Assembley
R&B Division Sanctioned Length
Constituency Reconstruction Realignment
Approval Year:
Assembley A
R&B Division Sanctioned Length
Constituency Major Bridge Minor Bridge
Assembley Achievement
R&B Division Sanctioned Length
Constituency Length
Approval Year:
3 0
Progress Chart
onsolidated Status of Work
Approval Year:
ork for Approved Years YYYY-ZZ Work in Progress Work Completed
Cost Rs in Lacks Expenditure Nos. Length in Km. Nos.
Administrative
Length in Km for Provision in the
Section Amount (INR Name of Work Existing Surface Roads Contract
in Cr)
Eirthen / BC
Approval Year:
Realignment Overlay or Widening
Nos. Length in Km Cost in Lacks Nos. Length in Km
Minor Bridge Box Culverts
Work in Progre
Work Order Given
Total Works in Progress
Achievement Length
Strengthening with Flexible
Overlay or Widening Rigid Pavement Total
WMM+DBM+BC Pavement
Achievement Length
Box Culverts Pipe Culverts Slab Culverts Total
Approved Year:
For the current year
Total Total
Expenditure incurred Expenditure Expenditure up
in the previous year Expenditure incurred incurred in the Expenditure up to till date (Rs in
till last month to this month
current month Cr.)
Total Value of Financial Total Progress of
Total No of Works in Total No. of Works
Works Progress of Works in
Progress Completed
Completed works in Progress Progress
Work Completed
Length in Km
TS Amount (Rs. Contract Cost Above/ Below Agency/ Tender Contract Period
in Cr.) (Rs. in Lakhs) % Contractor Approval Date in Months
TS Amount (Rs. Contract Cost Above/ Below Agency/ Tender Contract Period
in Cr.) (Rs. in Lakhs) % Contractor Approval Date in Months
Work in Progress
Substantial Completed up to BC level Amongst Work Completed
ks in Progress
Total Works in Progress
Cost in Lacks Nos. Length in Km Cost in Lacks Nos. Length in Km
Total
Details of Length
Expenditure Expenditure Total Expenditure Physical Status
substantially SQM Agency
Incurred in the incurred up to of work as on
up to till date completed up to BC Name
current month this month in Date
level (Road wise)
current FY
proved Works
Cost in Lacks
ks Started Work Completed
of Works)
Cost in Lacks Nos. Length in Km Cost in Lacks
No of SRI No. of No. of
No. of ATR No. of ATR
Reports For Satisfactory Unsatisfactory Approved Pending
SQM Report For SQM Report For SQM
No of No. of
No of SRI Reports
IQM Agency Name IQM Visit Satisfactory Unsatisfactory
for IQM
Reports For IQM Reports For IQM
Remarks
Attachments
Remarks
Attachments
57 1 List of Equipment
Hydraulic Excavator
Motor Grader
Dozer
Tippers
WMM Plant
Hydro Static Paver
Smooth Wheel Road Roller
Vibrator Roller
Pneeumatic Road Roller
Water Tankers
Batch type Hot mix Plant
Loader
Paver Finisher Mechanical
Bitumen Pressure Distributor
Concreet Batching Plant
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
0
0
0
0
0
0
0
0
0
1 Abbrevation
3 Alerts
Search Alerts Title | | Date | | - Search
+ Add Alerts
Title Massage Date
4 Related Links
Edit/Delete
1 User
Login Name:
+ Add User
Login Name First Name Middle Name Last Name
2 Role
Role Name:
+ Add Role
Role Name Role Description Action
Administrator Administrator Edit/Delete
Cicle Circle Level Role Edit/Delete
Do Division Office Role Edit/Delete
R&B R&B Role Edit/Delete
PMC PMC User Edit/Delete
+ Add Funct.
Update Functionality
Role Name: -Search Role-
UPDATE CANCEL
7 R&B Notification
List of inactive users
List of users with inactive activity
Search User
First Name: SEARCH
Search Role
SEARCH
Search Functinality
SEARCH
Functionality List
Role Name Action
Administrator Edit Fun./Delete
PMC Edit Fun./Delete
Do Edit Fun./Delete
Circle Edit Fun./Delete
R&B Edit Fun./Delete
SEARCH
Minor Bridge
6-60 meters
Box Culvets
>6 meters
Pipe Culvets
Slab culvat