Sanctioned Work Sanctioned Length

Sanctioned Ammount (Cr.) Completed Length

Completed Works Works in Progress


Expenditure (Cr.) Cost of Works in Progress (Cr.)

Work Progress Chart

Work at a Glance
Nos of
District Sanctioned Sanctioned Nos of Nos of in
Approved
Name Year Ammount (Cr.) Completed Progress Work
Works
tioned Length Now to be Started
pleted Length Cost of Now to be Started (Cr.)

ks in Progress Length of Works in Progress


rks in Progress (Cr.) Length of Now to be started

Now to be
Started Works
1 1 State
Sr. No. State Name State/UT State Type
1 Andhra Pradesh AndhraPradesh Regular

2 2 Phase
Sr. No. Phase Number State/UT State Type
1 Phase-I AndhraPradesh Regular
2 Phase-II AndhraPradesh Regular

3 3 Project Type

Sr. No. Project Code Project Name Type of Roads

Andhra Pradesh Roads


1 APRBRP and Bridges State Highways (SH)
Reconstruction Project

Andhra Pradesh Mandal


Connectivity and Rural
2 APMCRCIP District Roads (DR)
Connectivity
Improvement Project

4 4 Package / Division

Sr. No. R&B Division Division Code Project Name


APRBRP / APMCRCIP
1 Anantapur
2 Chittoor
3 East Godavari
4 Guntur
5 Kadapa
6 Krishna
7 Kurnool
8 Nellore
9 Prakasam
10 Srikakulam
11 Visakhapatnam
12 Vizianagaram
13 West Godavari

5 5 Assembley Constituency
Sr. No. Assembley Constituency R&B Division Phase Number
1
2
6 6 Agency/Contractor
Sr. No. Agency/ Contractor PAN First Name

7 7 Target Work
Sr. No. R&B Division Financial Year Phase Number

8 8 Road Detailes
Sr. No. Road Number Phase Number Project Name

9 9 Material Source Approvals


Material Supplier Company
Sr. No. PAN First Name
Name
Census Code Action
ST-AP Add/Delete

Action
Add/Delete
Add/Delete

NDB Senctioned
NDB Sanctioned No of Bridges
Ammount State Name Action
Length (in Km) Reconstructing
(INR in Cr.)

1600 3200 269 Andhra Pradesh Add/Delete

1400 3200 206 Andhra Pradesh Add/Delete

Package Number Phase Number Included in R&B Action

Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete
Yes Add/Delete

Project Name Package Number District Name Included in R&B Action


Yes/No Add/Delete
Yes/No Add/Delete
MiddleName Last Name Contact Address Contractor State Contractor District

Project Name Package Number Targat Length Funds Alotted Action


Add/Delete
Add/Delete

Package Number R&B Division Name of Work Location Detailes Length From

MiddleName Last Name Contact Address Supplier State Supplier District


PIN Code Moble Phone Fax Email Remark Included in R&B Action
Yes/No Add/Delete
Yes/No Add/Delete

Length To Distance Total Length Action


Add/Delete

Material / Activity
PIN Code Moble Phone Fax Email
Earthwork Agreegate Ciment
l / Activity
Remark Included in R&B Action
Grid Matel
Yes/No Add/Delete
10 1 DPR Status

Sr. No. Road Name of Road / Phase Project Package


Number Location Detailes Number Name Number

11 2 Encumbrance Detailes

Road Name of Road / Phase Project Package


Sr. No.
Number Location Detailes Number Name Number

12 3 Forest Clearance

Road Name of Road / Phase Project Package


Sr. No.
Number Location Detailes Number Name Number

13 4 Tree Cutting Permission

Road Name of Road / Phase Project Package


Sr. No.
Number Location Detailes Number Name Number

14 5 Land Acqusition

Road Name of Road / Phase Project Package


Sr. No.
Number Location Detailes Number Name Number

15 6 Utility Relocation
Road Name of Road / Phase Project Package
Sr. No.
Number Location Detailes Number Name Number

16 7 Rehabilitation and Resettlement (R&R)


Road Name of Road / Phase Project Package
Sr. No.
Number Location Detailes Number Name Number
Connecting Mandals

Length of road
R&B Division Assembley Length From Length To Total Length (in proposed for Two-
Constituency Km)
Laning (in Km)

Assembley Total Length (in


R&B Division Length From Length To
Constituency Km) Forest Clearance

Assembley Length Affacted Length Affacted Total Length Clearance is


R&B Division
Constituency From Up-To Affacted (in Km) Required Or Not ?

Assembley Length Affacted Length Affacted Total Length Number of Tree to


R&B Division
Constituency From Up-To Affacted (in Km) be Felled

Assembley Length Affacted Length Affacted Total Length Area of Acquisiton


R&B Division
Constituency From Up-To Affacted (in Km) (Acres)
Type of Utility
Assembley Length Affacted Length Affacted Total Length
R&B Division (Electrical / Water
Constituency From Up-To Affacted (in Km) Supply)

Assembley Length Affacted Length Affacted Total Length Likely Date of Taking
R&B Division
Constituency From Up-To Affacted (in Km) Over
Likely date of Likely date of Submission Likely date of Submission Likely date of Submission of
Submission of of Draft Detailed Feasibility of Final Detailed Feasibility Draft Detailed Project
Alignment Report Report Report Report

Encumbrance Required in (In Nos.)


Rehabilitation and
Tree Cutting Permission Land Acqusition Utility Relocation
Resettlement (R&R)

If YES, area praposed


Online Application Likely Date Of Recipt of Likely Date Of Recipt of
for division of forest
Submitted or Not ? Stage-I Clearance Stage-II Clearance
land inacres

If Joint Inspection is Done


Date of Joint Inspection
With The Forest Date of Receipt of Work Status
Department Valuation of Tree
Permission for Tree Felling

Date of Requisition for


LA Plan with Contractor
or Land Acqusition Likely Date Of Draft Likely Date Of Draft
Likely Date Of Award
officer (LRDC/JC) along Notification Declaration
with Land Plan
Schedules
Date of Joint Inspaction Likely date of receipt of
Technically Approved /
with Utility Owning Estimated Cost in Cr. Work Status
Dept. Sanctioned Estimates From
the Utility Owning Dept.

Estimated Cost in Cr. Work Status Targated Completion Date Action

Add/Delete
Add/Delete
Targated
Work Status Action
Completion Date

Add/Delete

Targated
Work Status Action
Completion Date

Add/Delete

Targated Completion
Action
Date

Add/Delete

Likely Date Of Taking


Over Possession Of Work Status Action
Land

Add/Delete
Add/Delete
Targated Completion
Action
Date

Add/Delete
Add/Delete
Type of Bridge
Sub Structure

Sub Structure

Sub Structure

Sub Structure
Sub Structure

Sub Structure
17 1 Road Detailes

Name of Road / Project


Sr. No. Road Number Phase Number
Location Detailes Name

18 2 Road Reconstruction

Name of Road / Project


Sr. No. Road Number Phase Number
Location Detailes Name

19 3 Road Realignment

Name of Road / Project


Sr. No. Road Number Phase Number
Location Detailes Name

20 4 Road Overlay or Widening

Sr. No. Road Number Name of Road / Phase Number Project


Location Detailes Name

21 5 Road Strengthening with WMM+DBM+BC

Name of Road / Project


Sr. No. Road Number Location Detailes Phase Number Name

22 6 Road Flexible Pavement

Name of Road / Project


Sr. No. Road Number Phase Number
Location Detailes Name
23 7 Road Rigid Pavement

Name of Road / Project


Sr. No. Road Number Phase Number
Location Detailes Name

24 8 Major Bridge

Name of Road / Project


Sr. No. Road Number Phase Number
Location Detailes Name

25 9 Minor Bridge

Name of Road / Project


Sr. No. Road Number Location Detailes Phase Number Name

26 10 Box Culverts

Name of Road / Project


Sr. No. Road Number Phase Number
Location Detailes Name

27 11 Pipe Culverts

Name of Road / Project


Sr. No. Road Number Phase Number
Location Detailes Name
28 12 Slab Culverts

Name of Road / Project


Sr. No. Road Number Phase Number
Location Detailes Name
Package Assembley
R&B Division Length From Length To
Number Constituency

Package Assembley Reconstruction Ref.


R&B Division Location of Chainage
Number Constituency Number

Package Assembley Realignment Ref.


R&B Division Location of Chainage
Number Constituency Number

Package R&B Division Assembley Overlay or Widening Location of Chainage


Number Constituency Ref. Number

Package Assembley Strengthening Ref.


Number R&B Division Constituency Number Location of Chainage

Package Assembley Flexible Pavement


R&B Division Location of Chainage
Number Constituency Ref. Number
Package Assembley Rigid Pavement Ref.
R&B Division Location of Chainage
Number Constituency Number

Package Assembley
R&B Division Chanage Location Major Bridge No
Number Constituency

Package Assembley
Number R&B Division Constituency Chanage Location Minor Bridge No

Package Assembley
R&B Division Chanage Location Box Culvert No
Number Constituency

Package Assembley
R&B Division Chanage Location Pipe Culvert No
Number Constituency
Package Assembley
R&B Division Chanage Location Slab Culvert No
Number Constituency
TYPICAL CROSS SECTION SCHEDULE (In Nos.)
Total Length (in Strengtheni
Km) Overlay or ng with Flexible
Reconstruction Realignment
Widening WMM+DBM Pavement
+BC

TARGA
TYPICAL CROSS SECTION (Chainage) SCHEDULE
WIDENING / NEW CONSTRUCTIO

FROM CH (Km) TO CH (Km) LENGTH (Km) BC (mm) DBM (mm) WMM (mm)

TARGA
TYPICAL CROSS SECTION (Chainage) SCHEDULE
WIDENING / NEW CONSTRUCTIO

FROM CH (Km) TO CH (Km) LENGTH (Km) BC (mm) DBM (mm) WMM (mm)

TARGA
TYPICAL CROSS SECTION (Chainage) SCHEDULE
WIDENING / NEW CONSTRUCTIO

FROM CH (Km) TO CH (Km) LENGTH (Km) BC (mm) DBM (mm) WMM (mm)

TARGA
TYPICAL CROSS SECTION (Chainage) SCHEDULE
WIDENING / NEW CONSTRUCTIO

FROM CH (Km) TO CH (Km) LENGTH (Km) BC (mm) DBM (mm) WMM (mm)

TARGA
TYPICAL CROSS SECTION (Chainage) SCHEDULE
WIDENING / NEW CONSTRUCTIO

FROM CH (Km) TO CH (Km) LENGTH (Km) BC (mm) DBM (mm) WMM (mm)
TARGA
TYPICAL CROSS SECTION (Chainage) SCHEDULE
WIDENING / NEW CONSTRUCTIO

FROM CH (Km) TO CH (Km) LENGTH (Km) BC (mm) DBM (mm) WMM (mm)

Type of Work
Reconstruction/ Sub Super
Type of Structures (Pipe, Outer Width of Foundation
Rehabilitation/ Structure Structure
Slab, Box, Arch) Structure (In Km) (Nos)
Repair / Widening (Nos) (Nos)
Scheme

Type of Work
Reconstruction/ Sub Super
Type of Structures (Pipe, Outer Width of Foundation
Rehabilitation/ Slab, Box, Arch) Structure (In Km) (Nos) Structure Structure
Repair / Widening (Nos) (Nos)
Scheme

Type of Work
Reconstruction/ Sub Super Length
Outer Width of Structure Foundation (Nos)
Rehabilitation/ Structure Structure Completed
(In Km)
Repair / Widening (Nos) (Nos) Till Date (Km)
Scheme

Type of Work
Reconstruction/ Sub Super Length
Outer Width of Structure
Rehabilitation/ Foundation (Nos) Structure Structure Completed
(In Km)
Repair / Widening (Nos) (Nos) Till Date (Km)
Scheme
Type of Work
Reconstruction/ Sub Super Length
Outer Width of Structure
Rehabilitation/ Foundation (Nos) Structure Structure Completed
(In Km)
Repair / Widening (Nos) (Nos) Till Date (Km)
Scheme
Number of Major Number of Number of Number of Pipe Number of Slab
Rigid Bridge Minor Bridge Box Culverts Culverts Culverts
Pavement

TARGATED FLEXIBLE PAVEMENT


NG / NEW CONSTRUCTION OVERLAY / STRENTHENING
BC (mm)
GSB (mm) Embankment (MM) BC (mm) DBM (mm) WMM (mm)
LHS

TARGATED FLEXIBLE PAVEMENT


NG / NEW CONSTRUCTION OVERLAY / STRENTHENING LHS Length
Completed Till
GSB (mm) Embankment (MM) BC (mm) DBM (mm) WMM (mm) Date (Km)

TARGATED FLEXIBLE PAVEMENT


NG / NEW CONSTRUCTION OVERLAY / STRENTHENING LHS Length
Completed Till
GSB (mm) Embankment (MM) BC (mm) DBM (mm) WMM (mm) Date (Km)

TARGATED FLEXIBLE PAVEMENT


NG / NEW CONSTRUCTION OVERLAY / STRENTHENING LHS Length
Completed Till
GSB (mm) Embankment (MM) BC (mm) DBM (mm) WMM (mm) Date (Km)

TARGATED FLEXIBLE PAVEMENT


NG / NEW CONSTRUCTION OVERLAY / STRENTHENING LHS Length
Completed Till
GSB (mm) Embankment (MM) BC (mm) DBM (mm) WMM (mm) Date (Km)
TARGATED FLEXIBLE PAVEMENT
NG / NEW CONSTRUCTION OVERLAY / STRENTHENING LHS Length
Completed Till
GSB (mm) Embankment (MM) BC (mm) DBM (mm) WMM (mm) Date (Km)

Length
Completed
Targaed Comp. Date Work Status Action
Till Date
(Km)

Add/Delete

Length
Completed
Till Date Targaed Comp. Date Work Status Action
(Km)

Add/Delete

Targaed
Work Status Action
Comp. Date

Add/Delete
Add/Delete

Targaed
Work Status Action
Comp. Date
Add/Delete
Add/Delete

Targaed
Work Status Action
Comp. Date

Add/Delete
Add/Delete
Targated
Work Status Action
Completion Date

Add/Delete

COMPLETED FLEXIBLE PAVEMENT TILL D


WIDENING / NEW CONSTRUCTION
BC (mm) DBM (mm) WMM (mm) GSB (mm)
RHS LHS RHS LHS RHS LHS RHS

LHS Length Total Length WIDENING / NEW CONSTRU


Completed Till Completed Till Date
Date (Km) (Km) BC (mm) DBM (mm) WMM (mm)
LHS RHS LHS RHS LHS

LHS Length Total Length WIDENING / NEW CONSTRU


Completed Till Completed Till Date
Date (Km) (Km) BC (mm) DBM (mm) WMM (mm)
LHS RHS LHS RHS LHS

LHS Length Total Length WIDENING / NEW CONSTRU


Completed Till Completed Till Date
Date (Km) (Km) BC (mm) DBM (mm) WMM (mm)
LHS RHS LHS RHS LHS

LHS Length Total Length WIDENING / NEW CONSTRU


Completed Till Completed Till Date
Date (Km) (Km) BC (mm) DBM (mm) WMM (mm)
LHS RHS LHS RHS LHS
LHS Length Total Length WIDENING / NEW CONSTRU
Completed Till Completed Till Date
Date (Km) (Km) BC (mm) DBM (mm) WMM (mm)
LHS RHS LHS RHS LHS
XIBLE PAVEMENT TILL DATE
OVERLAY / STRENTHENING
Embankment (MM) BC (mm) DBM (mm) WMM (mm)
LHS RHS LHS RHS LHS RHS LHS

COMPLETED FLEXIBLE PAVEMENT TILL DATE


ENING / NEW CONSTRUCTION OVERLAY / STR
WMM (mm) GSB (mm) Embankment (MM) BC (mm)
RHS LHS RHS LHS RHS LHS RHS

COMPLETED FLEXIBLE PAVEMENT TILL DATE


ENING / NEW CONSTRUCTION OVERLAY / STR
WMM (mm) GSB (mm) Embankment (MM) BC (mm)
RHS LHS RHS LHS RHS LHS RHS

COMPLETED FLEXIBLE PAVEMENT TILL DATE


ENING / NEW CONSTRUCTION OVERLAY / STR
WMM (mm) GSB (mm) Embankment (MM) BC (mm)
RHS LHS RHS LHS RHS LHS RHS

COMPLETED FLEXIBLE PAVEMENT TILL DATE


ENING / NEW CONSTRUCTION OVERLAY / STR
WMM (mm) GSB (mm) Embankment (MM) BC (mm)
RHS LHS RHS LHS RHS LHS RHS
COMPLETED FLEXIBLE PAVEMENT TILL DATE
ENING / NEW CONSTRUCTION OVERLAY / STR
WMM (mm) GSB (mm) Embankment (MM) BC (mm)
RHS LHS RHS LHS RHS LHS RHS
LHS Length LHS Length Total Length
Targated
Completed Till Completed Till Completed Till Work Status
WMM (mm) Completion Date
Date (Km) Date (Km) Date (Km)
RHS

OVERLAY / STRENTHENING Targated


Work Status
DBM (mm) WMM (mm) Completion Date
LHS RHS LHS RHS

OVERLAY / STRENTHENING Targated Work Status


DBM (mm) WMM (mm) Completion Date
LHS RHS LHS RHS

OVERLAY / STRENTHENING Targated


Completion Date Work Status
DBM (mm) WMM (mm)
LHS RHS LHS RHS

OVERLAY / STRENTHENING Targated


Work Status
DBM (mm) WMM (mm) Completion Date
LHS RHS LHS RHS
OVERLAY / STRENTHENING Targated
Work Status
DBM (mm) WMM (mm) Completion Date
LHS RHS LHS RHS
Action

Add/Delete

Action

Add/Delete

Action

Add/Delete

Action

Add/Delete

Action

Add/Delete
Action

Add/Delete

For Rigid
<60 mtrs
Type of Bridge
Sub Structure
From / To
29 1 Approved Work for Road
Road Name of Road /
Sr. No. Phase Number Project Name
Number Location Detailes
Edit/Delete

30 2 Technical Sanction
Package
Sr. No. Action Phase Number Project Name
Number
Edit/Delete

31 3 Tendre

Package
Sr. No. Action Phase Number Project Name
Number

Edit/Delete

32 4 Physical Progress Monitoring

Sr. No. Action Phase Number Project Name Package


Number

Edit/Delete

33 6 Bill Detailes
Package
Sr. No. Action Phase Number Project Name
Number
Edit/Delete

34 7 Payment Details

Package
Sr. No. Action Phase Number Project Name
Number

Edit/Delete

35 8 SQM-IQM Report (State Level QualityMonitoring / Independent Quality Monitoring)


Phase Package
Sr. No. Project Name R&B Division
Number Number
36 9 Final Road Data

Package
Gallery Sr. No. Phase Number Project Name
Number

37 10 Final Bridge Data

Package
Gallery Sr. No. Phase Number Project Name Number
Package Assembley
R&B Division Year of Approval Adm. San. Date
Number Constituency

Assembley Approved Work


R&B Division Financial Year Approval Date
Constituency Name

Assembley
R&B Division Name of Work Tendre Number Tendre Name
Constituency

R&B Division Assembley Work Name Month BC (Km)


Constituency

Assembley
R&B Division Work Name Bill No Bill Date
Constituency

Assembley
R&B Division Bill No. Work Name CFMS Ref. No.
Constituency

ndent Quality Monitoring)


Assembley
Work Name Date Report Type Report Title
Constituency
Administrative
Assembley Administrative
R&B Division Year of Approval Section Amount
Constituency Senction Date
(INR in Cr)

Administrative
Assembley Administrative
R&B Division Constituency Year of Approval Senction Date Section Amount
(INR in Cr)
AS Amount (INR in Praposed Length
Work Name Contract Provision No of Bridges
Cr.) of Road in Km.

Approved Amount Praposed Length (in T.S. Ammount (INR


T.S. Numbar T.S. Numbar
(INR in Cr.) Meter/Km) in Cr.)

Above Below Contacr Cost (Int


Approved Date Agency / Contractor Time Limit in Month
Parcentage in Cr.)

DBM (Km) WMM (Km) GSB (Km) Embarkment (Km) Foundation (Nos)

Bill Amount (INR in


Description
Cr.)

Deduction
CFMS Ammount (INR
CFMS Release Date Ammount (INR in Remark
in Cr.)
Cr.)

Description Attachment Action


Edit/Delete

Length in Km for Provision in the TS Amount (Rs. in


Name of Work Existing Surface
Roads Contract Cr.)

Length of new TS Amount (Rs. in


Name of Work Existing Structure Structure in Meter Type Of Structure Cr.)

CD Work
Remark

Remark

Stipulated date of Sripulated


Date of LoA Civil Work Maintenence Remarks
Completion Completion Date

Sub Structure Super Structure Work Status Completion Date Revised Maintenane
(Nos) (Nos) Completion Date
Contract Cost (Rs. Contract Period in
Above/ Below % Agency/ Contractor Tender Approval Date
in Lakhs) Months

Contract Cost (Rs. Contract Period in


in Lakhs) Above/ Below % Agency/ Contractor Tender Approval Date Months
Remarks
Date of Schedule Date for Schedule Date for Expenditure
Actual Date of
Commencement of Completion of Completion of Incurred in the
Completion
Work Work Maintenance Previous FY year

Date of Schedule Date for Schedule Date for Expenditure


Actual Date of
Commencement of Completion of Completion Completion of Incurred in the
Work Work Maintenance Previous FY year
Total Expenditure Expenditure Total Expenditure
Total Expenditure up to till Physical Status of
incurred till last Incurred in the incurred up to this
date work as on Date
month current FY current month month in current FY

Total Expenditure Expenditure Total Expenditure


Total Expenditure up to till Physical Status of
incurred till last Incurred in the incurred up to this date work as on Date
month current FY current month month in current FY
Details of Length
No. of
substantially completed SQM Agency No of SRI Reports No. of Satisfactory
Unsatisfactory
up to BC level (Road Name For SQM Report For SQM
Report For SQM
wise)

Details of Length
No. of
substantially completed SQM Agency No of SRI Reports No. of Satisfactory
up to BC level (Road Name For SQM Report For SQM Unsatisfactory
Report For SQM
wise)
No. of ATR No. of ATR IQM Agency No of SRI Reports No of Satisfactory
IQM Visit
Approved Pending Name for IQM Reports For IQM

No. of ATR No. of ATR IQM Agency No of SRI Reports No of Satisfactory


Approved Pending Name IQM Visit for IQM Reports For IQM
No. of
Remarks
Unsatisfactory
Attachments
Reports For IQM

No. of
Remarks
Unsatisfactory Attachments
Reports For IQM
38 1 Final Road Data

Search Final Road Data

R&B Division Assembley Co

Name of Work

Gallery Sr. No. Phase Number Project Name

39 2 Final Bridge Data

Search Final Bridge Data

District

Name of Work

Gallery Sr. No. Phase Number Project Name

40 3 Works of Approval Road


Statement - Works Approved Report for
Username:
Sr. No. Phase Number Project Name Package Number

1
2
Total
41 4 Works of Approval Bridge
Statement - Works Approved Report For Bridge
Username:

Sr. No. Phase Number Project Name Package Number

1
2
Total

42 5 Status of Work Approval


Statement - Status of Approved Work
Username:

Sr. No. Phase Number Project Name Package Number

1
2
Total

43 6 Status of Tender Approval


Statement - Status of Tender Approved
Username:
Sr. No. Phase Number Project Name Package Number

1
2
Total

44 7 Sanctioned/Achievement of Road Work Progress


Statement - Sanctioned/Achievement of Road Work Progress
Username:

Sr. No. Phase Number Project Name Package Number

1
2
Total (Vijayawada Circle)
3
4
Total (Krishna Circle)
Total

45 8 Sanctioned/Achievement of Bridge Work Progress


Statement - Sanctioned/Achievement of Bridge Work Progress
Username:
Sr. No. Phase Number Project Name Package Number
Vijayawada
Panchayat
Circle 1
2
Total (Vijayawada Circle)
Krishna Panchayat Circle
3
4
Total (Krishna Circle)

Total

46 9 Sanctioned/Achievement of Total Works


Statement 9 - Sanctioned/Achievement of Total Works
Username: Approval Year:
Sr. No. Phase Number Project Name Package Number

1
2
Total (Vijayawada Circle)
3
4
Total (Krishna Circle)

Total

47 10 Financial Status of Approved Works


Statement - Financial Status of Approved
Username: Budget Item:

Sr. No. Phase Number Project Name Package Number

1
2
Total (Vijayawada Circle)
3
4
Total (Krishna Circle)
Total

48 11 Progress Evaluation Report


Statement - Progress Evaluation Report
Username:
Nos of works whose Nos of works whose time
Sr. No. R&B Division time limit passes limit passes between
between (25%-50%) (50%-75%)
1 Anantapur
2 Chittoor
3 East Godavari
4 Guntur
5 Kadapa
6 Krishna
7 Kurnool
8 Nellore
9 Prakasam
10 Srikakulam
11 Vishakhapatnam
12 Vizianagaram
13 West Godavari
Total

49 12 Contractor Performance Report


Statement 12 - Contractor Performance Report
Username:

Sr. No. Phase Number Project Name Package Number

50 13 Scheme wise Approval Works


51 14 Achieved Length Bar Chart Report
52 15 Scheme Wise Report
No of works
Sr. No. Scheme No of works Completed
Sanctioned
Resurfacing of
1
Plan Road
Total

Drill Down Report


Username: Approved Year:
Sr. No. District No of Road Sanctioned No of Road Completed

1
2
Total

53 16 Status of Works
Statement 16 - Status of Works
Username:

Nos. of Works for which


Sr. No. Circle Division completion date is over
and works Completed

1 Krishna District Krishna 168


2
3
4
Total

Drill Down Report Completion date is over but works in Progress


Username: Approved Year:
Sr. No. Division Name of Works Name of Agency
1 Krishna Road-1 Madhuram const.
Shree Shakti
2 Krishna Road-2 Construction,
Ahmedabad

Shree Shakti
3 Krishna Road-3 Construction,
Ahmedabad

54 16 Physical Progress Pie Chart-Report


55 17 Physical Vs Financial Progress Chart
Statement 17 - Physical and Financial Progress Chart
56 18 Consolidated Work Status
Statement - Consolidated Status of Work
Username:
Sanctioned Work for Approved Years Y
Sr. No. R&B Division
Nos. Length in Km
1
2
3
4
5
6
Total
Search Final Road Data

Assembley Constituancy Package Number

Year of Approval SEARCH

Administrative
Package Number R&B Division Assembley Constituency Year of Approval Senction Date

earch Final Bridge Data

Constituency Mandal

Year of Approval SEARCH

Administrative
Package Number R&B Division Assembley Constituency Year of Approval
Senction Date

orks Approved Report for Road

Assembley Reconstruction
R&B Division
Constituency Nos. Length in Km Cost in Lacks
Approval Year:
Major Bridge
Assembley
R&B Division
Constituency Nos. Length in Km Cost in Lacks

Approval Year:

Assembley Approved Works


R&B Division
Constituency
Nos. Length in Km Cost in Lacks

Approval Year:
Assembley Total Approved Works
R&B Division
Constituency Nos. Length in Km Cost in Lacks

of Road Work Progress


Approval Year:

Assembley
R&B Division Sanctioned Length
Constituency Reconstruction Realignment
Approval Year:
Assembley A
R&B Division Sanctioned Length
Constituency Major Bridge Minor Bridge

Assembley Achievement
R&B Division Sanctioned Length
Constituency Length

nancial Status of Approved Works


All Budget Type: All
Approved Works
Assembley
R&B Division Constituency Nos. Length in Km Cost in Lacks
Nos of works whose Nos of Works whose
time limit passes
time limit is over
between (75%-100%)

Assembley Total No. of R&B Total Value of


R&B Division Contractor Name
Constituency Road Works Work
Cost
Length in Km
(Rs. in Cr.)

Scheme: Resurfacing of Plan Road


Completed Length in Completed up-to Balance Length to be Cost
Km DBM Level completed (Rs. in Cr.)

Approval Year:

Nos. of Works for which Nos. of Works for


which completion
completion date is over date is over but
but works in Progress works not started

3 0
Progress Chart
onsolidated Status of Work
Approval Year:
ork for Approved Years YYYY-ZZ Work in Progress Work Completed
Cost Rs in Lacks Expenditure Nos. Length in Km. Nos.
Administrative
Length in Km for Provision in the
Section Amount (INR Name of Work Existing Surface Roads Contract
in Cr)

Eirthen / BC

Administrative Length of new


Existing Type Of
Section Amount (INR Name of Work Structure in
Structure Structure
in Cr) Meter

Approval Year:
Realignment Overlay or Widening
Nos. Length in Km Cost in Lacks Nos. Length in Km
Minor Bridge Box Culverts

Nos. Length in Km Cost in Lacks Nos. Length in Km

Work in Progre
Work Order Given
Total Works in Progress

Nos. Length in Km Cost in Lacks Nos. Length in Km

Technical Sanction (TS) Given till Date TS Remains (Nos. of works)


(Nos. of works)
Nos. Length in Km Cost in Lacks Nos. Length in Km

Achievement Length
Strengthening with Flexible
Overlay or Widening Rigid Pavement Total
WMM+DBM+BC Pavement
Achievement Length
Box Culverts Pipe Culverts Slab Culverts Total

Approved Year:
For the current year
Total Total
Expenditure incurred Expenditure Expenditure up
in the previous year Expenditure incurred incurred in the Expenditure up to till date (Rs in
till last month to this month
current month Cr.)
Total Value of Financial Total Progress of
Total No of Works in Total No. of Works
Works Progress of Works in
Progress Completed
Completed works in Progress Progress
Work Completed
Length in Km
TS Amount (Rs. Contract Cost Above/ Below Agency/ Tender Contract Period
in Cr.) (Rs. in Lakhs) % Contractor Approval Date in Months

TS Amount (Rs. Contract Cost Above/ Below Agency/ Tender Contract Period
in Cr.) (Rs. in Lakhs) % Contractor Approval Date in Months

or Widening Strengthening with WMM+DBM+BC Flexible Pavement


Cost in Lacks Nos. Length in Km Cost in Lacks Nos. Length in Km
Culverts Pipe Culverts Slab Culverts

Cost in Lacks Nos. Length in Km Cost in Lacks Nos. Length in Km

Work in Progress
Substantial Completed up to BC level Amongst Work Completed
ks in Progress
Total Works in Progress
Cost in Lacks Nos. Length in Km Cost in Lacks Nos. Length in Km

(Nos. of works) Work Order issued Works Started


(Nos. of Works) (Nos. of Works)
Cost in Lacks Nos. Length in Km Cost in Lacks Nos. Length in Km
Total
Expenditure up
to till date (in
Mn $)
Grading of inspection (Nos)

Unsatisfactory Satisfactory SRI


Schedule Date Schedule Date Expenditure
Date of
for Actual Date of for Completion Incurred in Total Expenditure
Commenceme Completion of Completion of the Previous incurred till last
nt of Work month current FY
Work Maintenance FY year

Schedule Date Schedule Date Expenditure


Date of
for Actual Date of for Completion Incurred in Total Expenditure
Commenceme incurred till last
Completion of Completion of the Previous
nt of Work month current FY
Work Maintenance FY year

e Pavement Rigid Pavement Total Approved Works


Cost in Lacks Nos. Length in Km Cost in Lacks Nos. Length in Km
b Culverts Total Approved Works

Cost in Lacks Nos. Length in Km Cost in Lacks

Completed Works Yet to be Started

Cost in Cr. Nos. Length in Km Cost in Cr.

ks Started Work Completed Works Started


of Works) (Nos. of Works)
Cost in Lacks Nos. Length in Km Cost in Lacks Nos. Length in Km
Total Details of Length
Expenditure Expenditure Total Expenditure Physical Status
substantially SQM Agency
Incurred in the incurred up to up to till date of work as on completed up to BC Name
current month this month in Date
level (Road wise)
current FY

Total
Details of Length
Expenditure Expenditure Total Expenditure Physical Status
substantially SQM Agency
Incurred in the incurred up to of work as on
up to till date completed up to BC Name
current month this month in Date
level (Road wise)
current FY

proved Works
Cost in Lacks
ks Started Work Completed
of Works)
Cost in Lacks Nos. Length in Km Cost in Lacks
No of SRI No. of No. of
No. of ATR No. of ATR
Reports For Satisfactory Unsatisfactory Approved Pending
SQM Report For SQM Report For SQM

No of SRI No. of No. of


No. of ATR No. of ATR
Reports For Satisfactory Unsatisfactory
Approved Pending
SQM Report For SQM Report For SQM
No of No. of
No of SRI Reports
IQM Agency Name IQM Visit for IQM Satisfactory Unsatisfactory
Reports For IQM Reports For IQM

No of No. of
No of SRI Reports
IQM Agency Name IQM Visit Satisfactory Unsatisfactory
for IQM
Reports For IQM Reports For IQM
Remarks
Attachments

Remarks
Attachments
57 1 List of Equipment

Road Name of Road /


Sr. No. Phase Number Project Name
Number Location Detailes

58 2 List of Personal at Project Site


Sr. No. Road Name of Road / Phase Number Project Name
Number Location Detailes
Assembley Overall
Package Number R&B Division Type of equipment
Constituency Required

Hydraulic Excavator
Motor Grader
Dozer
Tippers
WMM Plant
Hydro Static Paver
Smooth Wheel Road Roller
Vibrator Roller
Pneeumatic Road Roller
Water Tankers
Batch type Hot mix Plant
Loader
Paver Finisher Mechanical
Bitumen Pressure Distributor
Concreet Batching Plant

Package Number R&B Division Assembley Type of equipment Overall


Constituency Required
Project In-charge
Highway Engineer
Bridge Engineer
Material Engineer
Environment and Safety Manager
Quality Surveyor
Lab Management / Technician
Site Supervisor
Maintenance Engineer
Total Equipment
Remaining Equ.
Available at site for Remark Action
the day Requ.

Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete

Allotted at Site as Remaining Remark Action


on date Required at Site
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
1 Abbrevation

Abbrevation Name Abbrivation Description


AA Administrative Approval
AADT Annual Average Daily Traffic
ADB Asian Development Bank
AIIB Asian Infrastructure Investment Bank
BM Bituminous macadam
BT Black Top
C&AG Comptroller and Auditor Genral
CAAA Controller of Aid Accounts and Audit
CC Cement Concrete
CFP Community Participation Framework

2 News & Updates

+ Add News & Updates


Title Description Date

News & Updates News & Updates


News & Updates Description
Title Date

3 Alerts
Search Alerts Title | | Date | | - Search

+ Add Alerts
Title Massage Date

Alerts Title Alert Message Alert Date

4 Related Links

5 Project Settings Deals with Currency


Dollar Rate Notification Days Action
Edit/Delete
Valid Upto Attached File

News & Updates Valid


File Name Action
Upto Date
Edit/Delete

Valid Upto Save Reset

Alerts Valid Upto Date Action

Edit/Delete
1 User
Login Name:

+ Add User
Login Name First Name Middle Name Last Name

2 Role
Role Name:

+ Add Role
Role Name Role Description Action
Administrator Administrator Edit/Delete
Cicle Circle Level Role Edit/Delete
Do Division Office Role Edit/Delete
R&B R&B Role Edit/Delete
PMC PMC User Edit/Delete

3 Functionality Search Functinality


Role Name: -Search Role-

+ Add Funct.
Update Functionality
Role Name: -Search Role-

Function Name Access All


Admin Yes/No
Map Yes/No
Master Data Entry Yes/No
Project Yes/No
Reports Yes/No
Settings Yes/No
Approved Work Yes/No
Technical Senction Yes/No
Package Yes/No
Tender Yes/No
Bill Dates Yes/No
Payment Details Yes/No
Physical Progress Yes/No
Final Road Data Yes/No
Final Bridge Data Yes/No
State Yes/No
Circle Yes/No
district Yes/No
Taluka Yes/No
Budget Yes/No
Budget Type Yes/No
Agency Yes/No
Budget Provision Yes/No
Tagat Length Yes/No
Circle Report Yes/No
Dashinfo Yes/No
DTP Details Yes/No
SQM IQM Report Yes/No

UPDATE CANCEL

5 Transfer Data Export / Import

6 Current Log Search Log


User Name Action

Current Log Detailes


Sr. No User Name Form Name Table Name
1 tblTender
2 tblPhysicalProgress
3 tblBillDetails
4 tblPaymentDetailes
5 tblTender
6 tblPhysicalProgress

7 R&B Notification
List of inactive users
List of users with inactive activity
Search User
First Name: SEARCH

Address Email Mobile No Alternaate No Roles Name Action


Edit/Delete
Edit/Delete
Edit/Delete
Edit/Delete

Search Role
SEARCH

Search Functinality
SEARCH

Functionality List
Role Name Action
Administrator Edit Fun./Delete
PMC Edit Fun./Delete
Do Edit Fun./Delete
Circle Edit Fun./Delete
R&B Edit Fun./Delete
SEARCH

Action Date Time Remarks


Update
Insert
location of chage habitation
from chanageto chainageexisting surface pavement crust detaiProgress ti Progress o % of progress
flexibal (Damarikaan) For Flexibal
from/to Embankment
subgrade
GSB
WMM
DBM
BC
For Rigid
Embankment
subgrade
GSB
DLC
PQC
Type of Bridge
Sub Structure
Box Cudder
Bow String

% of progress Bridges No of MinoNo of major Bridges


Major Bridges Bridge locaNo of spanleingth of bridge
<60 mtrs From / To

Minor Bridge
6-60 meters
Box Culvets
>6 meters
Pipe Culvets
Slab culvat