Calculation and Specification of Lightings and Electrical Terminals
Calculation and Specification of Lightings and Electrical Terminals
Calculation and Specification of Lightings and Electrical Terminals
CALCULATION AND
SPECIFICATION OF LIGHTINGS
AND ELECTRICAL TERMINALS
Doc.No. 01 - 42 19 SD029- EL
Prepared by Approved by
Rev. Date Remark Muzami Thahir Ir. Sardono Sarwito,
M.Sc.
CALCULATION & Doc. No. 01 - 42 19 SD029- EL
SPECS. OF Rev. No. 01
LIGTHINGS &
ELECTRICAL Page. 2 of 21
TERMNINALS
I. INTRODUCTION
The lighting is media for illumination so you can feel comfort in activities both
inside and outside the room. Lighting including the use of both light sources such as
lamps and natural lighting which is obtained through the Windows, skylights or light
shelves during the day. Daylighting (using windows, skylights, or light shelves) is
sometimes used as a primary source of light during the day in the building. This can
save energy. lighting is a major component of energy consumption in the building.
The right lighting can improve the performance of tasks, improve the appearance of
the area, or have a positive psychological effect on the occupants.
II. OBJECTIVES
1. Determining the reflection factor from celling, wall and floor
2. Calculate the resulting light every lamp.
3. Calculate the lighting required in one room
4. Calculate amount of lamp required in one room
5. Determine amount of socket-outlet, depend on equipment and requirement
required in one room
III.REFERENCES
1. Sardono Sarwito Diktat “The Design of Ship’s Electrical Installation”
V. SYSTEM DESCRIPTION
The lighting is media for illumination so you can feel comfort in activities both
inside and outside the room. In the ship there are several kinds of lamp types that
will be used, depending on the function of the room. After selecting the type of
lamp that fits the room then it will get the number of lamp needed. For
requirement amount of socket-outlet depend on the equipment and requirement in
a space. After know amount of lamp and socket-outlet needed, so known amount
of power requirement for lightnings and socket-outlet.
0.
6 0.285 0.8 0.322 0.286 0.7 5295 2625
10 0. 0.329 0.8 0.407 0.386 0.7 5822 1750
CALCULATION & Doc. No. 01 - 42 19 SD029- EL
SPECS. OF Rev. No. 01
LIGTHINGS &
ELECTRICAL Page. 7 of 21
TERMNINALS
6
0.
11 6 0.285 0.8 0.368 0.355 0.7 3635 1312.5
0.
12 6 0.329 0.8 0.407 0.330 0.7 4580 3500
0.
13 6 0.329 0.8 0.407 0.358 0.7 1611 1750
0.
14 6 0.329 0.8 0.407 0.348 0.7 2615 1750
0.
15 8 0.407 1 0.445 0.426 0.7 2830 1750
0.
16 8 0.407 1 0.445 0.434 0.7 2779 1750
17 1 0.445 1.25 0.489 0.468 0.7 3383 1750
18 1 0.35 1.25 0.379 0.379 0.7 5541 1750
0.
19 6 0.262 0.250 0.7 1403 1750
0.
20 6 0.262 0.250 0.7 1403 1750
0.
21 6 0.262 0.8 0.314 0.311 0.7 1774 1750
0.
22 6 0.15 0.083 0.7 2400 1750
0.
23 6 0.15 0.069 0.7 2880 1750
B. POOP DECK
Room Dimension Index
Area
No ROOM P L T H h Room
(m) (m) (m) (m) (m) A (m2) (k)
1 Quarter Master 1 3.4 3.2 3.0 0.7 2.3 10.9 0.717
2 Quarter Master 2 3.2 3.2 3.0 0.7 2.3 10.2 0.696
3 Quarter Master 3 3.2 3.2 3.0 0.7 2.3 10.2 0.696
4 Boastwain 3.2 3.2 3.0 0.7 2.3 10.2 0.696
5 Clinic 4.7 3.1 3.0 0.7 2.3 14.6 0.812
CALCULATION & Doc. No. 01 - 42 19 SD029- EL
SPECS. OF Rev. No. 01
LIGTHINGS &
ELECTRICAL Page. 9 of 21
TERMNINALS
6 Library 3.1 3 3.0 0.7 2.3 9.3 0.663
7 Lavatory 3.1 3.1 3.0 0.7 2.3 9.6 0.674
8 Mess Room 5.3 2.7 3.0 0.7 2.3 14.3 0.778
Emergency Pump
9 Room 2.7 1.8 3.0 0.7 2.3 4.9 0.470
10 AHU 2.5 1.5 3.0 0.7 2.3 3.8 0.408
11 Galley 3.1 3 3.0 0.7 2.3 9.3 0.663
12 Mess Room 6 3 3.0 0.7 2.3 18.0 0.870
13 Cold Storage 2.6 1.7 3.0 0.7 2.3 4.4 0.447
14 Dry Storage 2.6 1.7 3.0 0.7 2.3 4.4 0.447
15 Foam Room 2.2 1.5 3.0 0.7 2.3 3.3 0.388
16 CO2 Room 2 1.7 3.0 3.0 3.4 0.306
Emergency
17 Generator 3 2.7 3.0 3.0 8.1 0.474
18 Gangway PS 14.5 1.5 3.0 3.0 21.8 0.453
19 Gangway SB 14.5 1.5 3.0 3.0 21.8 0.453
20 Gangway Back 4 2 3.0 3.0 8.0 0.444
21 Gangway Outer PS 18 2 3.0 3.0 36.0 0.600
22 Gangway Outer SB 18 2 3.0 3.0 36.0 0.600
23 Gangway Outer Back 11 5 3.0 3.0 55.0 1.146
24 Upstairs 5 1 3.0 3.0 5.0 0.278
25 Downstairs 5 1 3.0 3.0 5.0 0.278
0.43 1 20
21
1.44 1 40
22
1.44 1 40
23
1.50 1 40
24 0.53 1 20
25 0.53 1 20
Quantity Total 28 - 7 2 0 2
- 690 2464 1408 0 3520
Power Total
8082
C. BOAT DECK
Index
Area
Room Dimension Room
No ROOM
P L T H h
(m) (m) (m) (m) (m) A (m2) (k)
1 Radio Operator Room 3.2 3 3 0.7 2.3 9.60 0.673
2 Officer Asst 1 3.2 3 3 0.7 2.3 9.60 0.673
3 Officer Asst 2 3.2 3 3 0.7 2.3 9.60 0.673
4 2nd Engineer 3.2 3 3 0.7 2.3 9.60 0.673
5 3rd Engineer 3.2 3 3 0.7 2.3 9.60 0.673
6 Meeting Room 4.2 3 3 0.7 2.3 12.60 0.761
7 Mess Room 4 3 3 0.7 2.3 12.00 0.745
CALCULATION & Doc. No. 01 - 42 19 SD029- EL
SPECS. OF Rev. No. 01
LIGTHINGS &
ELECTRICAL Page. 14 of 21
TERMNINALS
8 Lavatory 3 1.2 3 0.7 2.3 3.60 0.373
10 Multimedia Room 2.8 1.8 3 0.4 2.6 5.04 0.421
11 Pantry 2.25 5.5 3 0.7 2.3 12.38 0.694
12 Gangway PS 7.8 1.2 3 3 9.36 0.347
13 Gangway SB 7.8 1.2 3 3 9.36 0.347
14 Gangway Back 5.3 4.2 3 3 22.26 0.781
15 Gangway Outer PS 11 2 3 3 22.00 0.564
16 Gangway Outer SB 11 2 3 3 22.00 0.564
17 Gangway Outer Back 10.5 7.5 3 3 78.75 1.458
18 Upstairs 5 1 3 3 5.00 0.278
19 Downstairs 5 1 3 3 5.00 0.278
Quantity Total 34 - 10 0 0 0
- 725 3520 0 0 0
Power Total
4245
CALCULATION & Doc. No. 01 - 42 19 SD029- EL
SPECS. OF Rev. No. 01
LIGTHINGS &
ELECTRICAL Page. 17 of 21
TERMNINALS
D. BRIDGE DECK
Index
Area
Room Dimension Room
No ROOM
P L T H h
(m) (m) (m) (m) (m) A (m2) (k)
1 Captain Room 3.1 3.25 2.5 0.7 1.8 10.08 0.881
2 Chief Eng. Room 3.1 3.25 2.5 0.7 1.8 10.08 0.881
3 Chief Officer Room 3.1 3.25 2.5 0.7 1.8 10.08 0.881
4 Captain Office 3.2 3.1 2.5 0.7 1.8 9.92 0.875
5 Chief Eng. Office 3.2 3.1 2.5 0.7 1.8 9.92 0.875
6 Chief Officer Office 3.2 3.1 2.5 0.7 1.8 9.92 0.875
7 Chief Off. Day Room 3.2 3.1 2.5 0.7 1.8 9.92 0.875
8 Meeting Room 3.75 3 2.5 0.7 1.8 11.25 0.926
9 Toilet Capten 1.6 1.1 2.5 0.4 2.1 1.76 0.310
10 Toilet Chief Engineer 1.6 1.1 2.5 0.4 2.1 1.76 0.310
11 Toilet Chief Officer 1.6 1.1 2.5 0.4 2.1 1.76 0.310
12 Mess Room 3 3 2.5 0.4 2.1 9.00 0.714
13 Pantry 3.3 3 2.5 0.7 1.8 9.90 0.873
14 Gangway PS 4.5 1.2 2.5 2.5 5.40 0.379
15 Gangway SB 4.5 1.2 2.5 2.5 5.40 0.379
16 Gangway Back 5 3 2.5 2.5 15.00 0.750
17 Gangway Outer PS 9 2.3 2.5 2.5 20.70 0.733
18 Gangway Outer SB 9 2.3 2.5 2.5 20.70 0.733
19 Gangway Outer Back 12 5 2.5 2.5 60.00 1.412
E. NAVIGATION DECK
Index
Area
Room Dimension Room
No ROOM
P L T H h
(m) (m) (m) (m) (m) A (m2) (k)
1 Battery Room 3 2.2 2.5 0.7 1.8 6.60 0.705
2 Document Room 2.3 2.3 2.5 1.5 1 5.29 1.150
3 Radio Chart Room 3 2.2 2.5 0.7 1.8 6.60 0.705
4 Cargo Control Room 2.8 1.1 2.5 0.7 1.8 3.08 0.439
5 Wheel House 11 3.2 2.5 0.7 1.8 35.20 1.377
6
Light
Range of Efficiency efficiency Diversity Light
Lux
No
k1 Eff 1 k2 Eff 2
(d) Φ (lumen)
803.33
1 0.6 0.285 0.8 0.368 0.329 0.7 9 1875
506.94
2 1 0.406 1.25 0.425 0.417 0.7 8 1875
803.33
3 0.6 0.285 0.8 0.368 0.329 0.7 9 1875
4 0.6 0.329 0.241 0.7 1920.3 5000
CALCULATION & Doc. No. 01 - 42 19 SD029- EL
SPECS. OF Rev. No. 01
LIGTHINGS &
ELECTRICAL Page. 22 of 21
TERMNINALS
6
15005.
5 1.25 0.489 1.5 0.45 0.469 0.7 4 5000
1730.5
6 0.6 0.295 0.8 0.368 0.260 0.7 5 1875
2412.6
7 0.6 0.15 0.150 0.7 7 1875
2412.6
8 0.6 0.15 0.150 0.7 7 1875
726.31
10 0.6 0.285 0.285 0.7 6 3750
3554.4
11 0.6 0.285 0.8 0.322 0.321 0.7 3 3750
1166.6
12 0.6 0.15 0.150 0.7 7 1875
Quantity Total 17 - 4 2 0 0
- 425 1408 1408 0 0
Power Total
3241
CALCULATION & Doc. No. 01 - 42 19 SD029- EL
SPECS. OF Rev. No. 01
LIGTHINGS &
ELECTRICAL Page. 23 of 21
TERMNINALS
F. TWEEN DECK
Room Dimension Index
Area
No ROOM P L T H h Room
(m) (m) (m) (m) (m) A (m2) (k)
1 Engine Control Room 5.8 2 2.5 0.7 1.80 11.60 0.826
2 Gangway PS 13 4.5 3.5 3.50 58.50 0.955
3 Gangway SB 13 4.5 3.5 3.50 58.50 0.955
4 Upstairs 5 1 3.5 3.50 5.00 0.238
5 Upstairs 5 1 3.8 3.80 5.00 0.525
6 Downstairs 5 1 3.7 3.70 5.00 0.525