Arc Flash Incident

Response Drill Report

Advance Research Computing Support


Facilities
BI-10-01764-0003
Contract: 6600038420

MDC DHAHRAN

Date: 14th July, 2021

Page 1 of 7
CONTENTS:

1. Emergency Incident Response Report Summary


2. Drill Photos
3. Drill Critique Questionnaire
4. Emergency Drill Participants Attendance

Page 2 of 7
1. EMERGENCY DRILL REPORT SUMMARY

Project Name: Advance Research Computing Support Facilities

Location: MDC Dhahran

Contract No. 6600038420 BI No. 10-01764-003

Drill Type: Arc Flash Incident Response


Time
Date: 14-July-2021 Time Started: 0830 hrs 0845 hrs
Completed:
Total No. Of
Drill Location: MDC Modules 14
Participants:
At around 0830 hrs, A sub-contractor personnel entered the energized Switch gear room
for some testing job. An arc flash incident happened while performing the assigned
activity due to use of non-insulated tool. A firewatcher during his routine rounds found the
victim was seriously injured; He then immediately called the attention of safety officer/first
Scenario:
aider and supervisor at site followed by a phone call to the Aramco Emergency number.
The area has been immediately isolated and the victim sent to the clear area while
waiting for the ambulance.

Incident
Adel Alzahrani, Safety Officer/First Aider
Response
Ramu, ERT member/ Site Supervisor
Team:
 Giving employees an opportunity to practice emergency procedures in a simulated but safe
environment
 Determining if employees/ key personnel’s (Emergency Response Team) understand and can
Drill
carry out emergency duties
Objectives:
 Evaluating effectiveness of Incident reporting procedures and determining necessary changes
or adjustments to procedures to improve performance.

Drill
Jonathan Camba, Safety Supervisor
Conducted By:

Effectiveness of Drill: Satisfactory Dissatisfactory


Key Personnel Response 
Employees Familiarity with Emergency Route 
Communication During Drill 
Speed Of Evacuation 

Critique:
Positive Observation Negative Observation
The response team immediately proceeded into the
area
The firewatcher always attentive
The reporting procedures has been followed properly

Page 3 of 7
2. DRILL SEQUENCE PHOTOS

a. Arc flash occurs during testing activity of a worker.

b. The injured victim found by a fire watcher and ensure that no electricity contact and the room was
shutdown.

c. The Supervisor immediately called the Saudi Aramco Emergency Hotline.

Page 4 of 7
d. The area has been isolated and the victim moved into nearest first aid area while waiting for the
Ambulance.

e. Emergency Incident Reporting Procedure Session Conducted atssite

Page 5 of 7
3. DRILL CRITIC QUESTIONNAIRE

Page 6 of 7
4. DRILL ATTENDANCE

Participants Attendance

Page 7 of 7