DAFTAR URAIAN PEKERJAAN

PAKET KOLAM BUDIDAYA SISTEM RESIRKULASI (RAS)


(PAKET KOLAM FIBER)

Lele (5000 - 8000 ekor/kolam)


Jenis Ikan
Nila (1200 - 2000 ekor/kolam)

Tabel 1 - Bill of Quantity Kolam Pembesaran Lele & Hidroponik


No Peralatan Qty Unit Price Total
1 Fish Pond , FRP, 2,5x2,5x1m Full set 10 bh 5.200.000 52.000.000
2 RDF 80-100 ton+ Backwash Pump 1 set 12.000.000 12.000.000
3 Pompa Sirkulasi + aksesoris 2 bh 1.700.000 3.400.000
4 Biofilter + Media + Piping + Nanobubble + Aerator + Diffuser 1 lot 68.200.000 68.200.000
5 Wave maker Airlift 2" 20 set 300.000 6.000.000
6 Perpipaan interkoneksi (pipa, fitting, valve, gutter, support) 1 lot 15.000.000 15.000.000
7 Panel Kontrol + Instalasi listrik untuk sistem 1 lot 5.000.000 5.000.000
8 Hidroponik train 4m 312 lubang /train 4 train 2.600.000 10.400.000
Total 172.000.000

Tabel 2 - Kebutuhan Power


No. Peralatan Qty Unit W Total Keterangan
1 Pompa Backwash RDF 1 bh 250 250 Auto backwash by timer
2 Pompa Sirkulasi 2 bh 200 400 Auto change over
3 Aerator 2 bh 100 200 24hour/day - autochange over
4 Nanobubble Generator 1 bh 550 550 12-24hour/day
1400

Tabel 3 - Bill of Quantity Pekerjaan Sipil


No Peralatan Qty Unit Price Total
1 Pekerjaan Pondasi Kolam, ukuran 12,5 x 5,0 x 0,15m 1 lot - -
2 Pekerjaan Pondasi Filter, ukuran 6,0 x 2,0 x 0,15m 1 lot - -
3 Pekerjaan lantai 1 lot
4 Sump Tank (bak semen) 1,2 x 1,0 x 1,2 m 1 lot - -
5 Pekerjaan Atap (Rangka & Penutup Atap) 1 lot - -
Total -

Tabel 4 - Optional
No Peralatan Qty Unit Price Total
1 Ozone Water Sterilizer 1 lot - -
2 Pressurized Filtratio System + Filter Pump 1 lot - -
3 Analyzer (pH, Conductivty, DO, Ammonium, Temp, dll) 1 lot
4 1 lot - -
5 1 lot - -
Total -

iwaQUAD - AhsanAgro Recirculation Aquaculture System Hydroponics