Professional Documents
Culture Documents
SP800 Pile Breaker Repair and Maintainace
SP800 Pile Breaker Repair and Maintainace
截桩机维修和保养
Pile breaker Repair and
Maintenance
1
I. Key Points need do Daily Maintenance
2
I. Key points need do Daily Maintenance
When the pile breaker works continuously for 1 month or cuts 1000
piles, it shall be stopped to check whether each part is in good
condition.
4
II. Routine Maintenance
5
II. Routine Maintenance
6
II. Routine Maintenance
7
THANK YOU!
STRIVE TO BE THE BEST!
湖南优力特重工有限公司
Hunan Unimate Heavy
Industry Co.,Ltd
8