Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

REQUEST FOR INSPECTION

Petrofac
TCI SANMAR ENGINIEERING CO. FOR PETROLUM SERVICES

Petrofac
To No. PO No.9500005392
QA/ QC Engineer (CLIENT) Project No. Pre-concentrator for burner
Previous Rejected
ENG/AHMAD GABER
Inspection Request No.
Inspection Request No. 1
Inspection Requested
14-7-2021
From QA/ QC Engineer (CONTRACTOR) Date & Time
Inspection Required Date
14-7-2021 & 1:00 PM
Signature: &Time
ITP Ref /
Name: Stage no

Date: 14-7-2021 Drg./Doc. Ref. 9220-84-ME-DGA-033-0

MECH CIVIL E&I STR X PIPING BUILDING PAINTING INSULATION GENERAL

Location : CACL2

Please inspect the following: REVIEW SURVEILLANCE WITNESS HOLD

Inspection Report Ref no.1 To witness Fit-up & welding of joints : 1 , 2 , 3 , 4 , 8 , 9 , 11 , 12 , 13 , 14

AS PER WELDING MAP IN DWG NO. 9220-84-ME-DGA-033-0


Contractor Construction/QC
CLINET Construction & QC
SIGN & DATE SIGN & DATE
Received by CONTRACTOR Date: Time: Signature

Received by CLINETY Date: Time: Signature

CLINET Remarks

APPROVED APPROVED AS NOTED REJECTED CANCELLED

Contractor
Contractor QC CLINET Construction CLINET QC
Construction
NAME : AHMAD ELKADY MAHMOUD ABD ELAAL ENG KAREEM ENG/AHMAD GABER
SIGNATURE :

DATE :

You might also like