Instruction Manual: Board Crane
Instruction Manual: Board Crane
Instruction Manual
Board crane
Typ: DK II 120016/5033
Order-No.: 80303
Hull-No.: JU-001
Shipyard: Jiangzhou Shipyard
Name of Ship:
Year of Construction: 2005
Feature Value
Crane
Crane type DK II
Capacity (SWL) 120 t
Length of main hoist
SWL 120t 4,0 - 16,0m
SWL 95t 4,0 - 19,0m
SWL 75t 4,0 - 24,0m
SWL 55t 3,3 - 33,0m
SWL 38t 3,3 - 33,0m
Lifting height ca. 46m
Luffing
SWL 0-38t at 3,3m - 33,0m - T = 50 sek
SWL 0-120t at 4,0m - 16m T = 80 sek
Hoisting speed
SWL 120t 0 - 7,5 m/min
SWL 95t 0 - 8,5 m/min
SWL 75t 0 - 10,0 m/min
SWL 55t 0 - 13,0 m/min
SWL 38t 0 - 18,0 m/min
Slewing speed>55t 0 -0.5 rpm
Slewing speed<38t 0 -0,7 rpm
Slewing range 360°unlimited
Specification 120 t load and 16 m outreach at +/- 5° heeling and simultaneous
trim of +/- 2°
Voltage
Nominal Voltage (U) 380 V / 50 Hz
Motor speed (n) 1,475 r/min
Neuenfelder Maschinenfabrik GmbH
Load indicator
1
4
5 3
7
9
2
11
13 6
8
15
10
12
14
3
5
2
9
4
6
7
8
10
Neuenfelder Maschinenfabrik GmbH
• Ensure that all of the safety devices have been fitted and that they are functioning.
• Inspect the crane for visible damage; remedy any defects found immediately and report
this to your supervisors or the crane user.
• Ensure that only authorised persons are in the crane operating area and that no other
persons can be endangered when the crane is started up.
• Remove all objects and other material which is not required for the crane operation from
the crane operating area out of the crane working area.
• Check the oil level in the hydraulic oil tank. Oil must be visible in the lower inspection
glass.
• Check whether all shut-off valves and if necessary open the valves
• Check whether the oil drain valve.
• Only use the crane íf it is free from faults.
4.5.2 Switching on
NOTE
Should one pump unit not work, the crane can be operated with another unit. (Turn
the key switch on the switch cabinet to "1" or "2".)
NOTE
From a jib position of 70°, the luffing up speed is automatically reduced to crawling
speed and the jib moves slowly to the top final position . From the top final position,
the jib moves faster from 70%.
• Do not remove any safety devices and do not taken them out of operation.
• You and other operating personnel are only to be in the stipulated workplaces.
• Ensure that no unauthorised persons are within the crane operating area.
• Never suspend accepted loads above peoples´ head.
• The load shift is only to be activated with an empty load hook and for the corresponding
load.
• An angular pulling with the load rope is not permitted.
• Only activate the "lay resting jib down" key switch if the jib is situated in the rest parking
support.
• Caution: All other limit switches do not function.
• It is imperative that a slack rope is avoided.
The load steps are switched on at the right panel (see item 4.4.2, page 4). The selected
load step is only shown by pilot lamps in the dipslay unit (see item 5, page 3)) if the jib has
moved to the working area of the load step and the control lever has subsequently been
positioned at "O". The load weight is calculated by the load measurement and also shown
on the pilot lamp
NOTE:
The load steps are only to be changed when the hook is not subjected to a load. If the
load on the hook is greater than the set load step, the crane switches off „hoisting“.
„Lowering“ is posible.
1. Extend the jib to the maximum outreach. Actuate the "rest jib" key switch and hold
the key switch in position. Place the jib in the resting position and relieve the topping
Neuenfelder Maschinenfabrik GmbH
lift a little.
2. Fasten the jib in the resting support.
3. Place the bottom hook block under the jib head, DO NOT lift the jib head.
4. Switch the pump unit off.
5. Check whether the vent flap is closed.
6. Close the cabin window and the cabin vent.
7. Switch the main switch in the machine room off. Do not switch off the auxiliary supply.
3 emergency-off buttons are installed in the crane and the crane housing.
• in the crane exit on the ladder (upper part of the foundation)
• in the switch cabinet
• on the right control panel