Action Plan: Sr. No Component Name Quantity Cost 1. Base Frame 01 2500 2. Wheels 02 850

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

ACTION PLAN

Sr.No Activity July Aug Sept Oct Nov Dec Jan Feb

1 Study of Methods used for minimize           


the effort for center stand
2 Take Video Tutorial ideas from            
YouTube / Google
3 Problem Identification

4 Methods for Automation, fixture          


design.
5 Conceptual re design of bike.

Collection of parts specification    


6 required for assembly & Fabrication
work.

Collection of parts specification    


7
required for system manufacturing

8 Collection of parts specification


required for design
Documentation & 3D design modeling
9
using software

10 Manufacturing of designed project.

11 Results and reports.

BILL OF MATERIAL

Sr. No Component Name Quantity Cost

1. Base frame 01 2500

2. Wheels 02 850
3. Battery 01 850

4. Center 01 550

6. Liner Actuator 01 1550

7. Wire 5mtr 200

8. Switch 02 150

9. M6 bolt x 30 mm 10 50

10.

GANTT CHART FOR PROJECT STAGE-I


Sr. Duratio End
No Task Name Start Date n Date

1 Collection Of Topic 18-Jul 5 23-Jul

2 Selection Of Topic 23-Jul 28 21-Aug

3 Finalization Of Topic 21-Aug 8 29-Aug

4 Submission Of Synopsis 29-Aug 1 30-Aug

5 Project Review I 30-Aug 10 10-Sep

6 Ieee Paper Making 10-Sep 5 15-Sep

7 Correction In Ieee Paper 15-Sep 3 18-Sep

8 Making Of Ppt 18-Sep 6 24-Sep

9 Project Review Ii 24-Sep 5 29-Sep

10 Project Stage-I Report Making 29-Sep 1 30-Sep

11 Internal Exam 01-Oct 0 01-Oct

12 Final Report Submission 01-Oct 17 18-Oct