Professional Documents
Culture Documents
Maharashtra State Board of Technical Education (Mumbai) A Project Report On
Maharashtra State Board of Technical Education (Mumbai) A Project Report On
Maharashtra State Board of Technical Education (Mumbai) A Project Report On
(MUMBAI)
A
Project Report
On
“KISAN360”
Submitted by
(2017-2018)
DEPARTMENT OF COMPUTER ENGINEERING
(2017-18)
CERTIFICATE
Certified that the project report entitled “ kisan360” has been successfully
completed by:
The said work has been assessed by us and we are satisfied that the same is up to the standard
envisaged for the level of the course. And that the said work may be presented to the external examiner.
P.S.Kulkarni Prof.C.R.Ghuge.
Project GUIDE H.O.D. Computer Dept.
ACKNOWLEDGEMENT
With a deep sense of gratitude, we would like to thanks all the people who have lit our path with their
kind guidance. We are very grateful to these intellectuals who did their best to help during our project
work.
It is our proud privilege to express a deep sense of gratitude to, Prof.H.P.Bhabad, Principal of Shatabdi
Institute of Technology, Agaskhind, Nasik, for his comments and kind permission to complete this
project.
I acknowledge and special thanks to encouragement, and austerity of our P.S.Kulkarni whose guidance
did half the magic of keeping me thrilled throughout this project.
We remain indebted to Prof.C.R.Ghuge, H.O.D, of Computer Engineering Department For their
timely suggestion and valuable guidance.
The special gratitude goes to Teaching staff members, and Non-Teaching staff members, of Computer
Department for his expensive, excellent and precious guidance in completion of this work. We thanks to
all the colleagues for their appreciable help for our working project.
With various industry owners or lab technicians to help, it has been our endeavor to throughout our work
to cover the entire project work.
We also thankful to our parents who providing their wishful support for our project completion
successfully.
And lastly, we thanks to our all friends and the people who are directly or indirectly related to our project
work.
ABSTRACT
With the increase of technology internet has become very important for us in our day to
day life. We all have internet facilities to access internet for searching information from
any corner of the world. There are many online sites on internet today, but what if we use
marketing sites only for farmers??Sounds good right! So, we have created the website to
provide digital marketing for farmers in which we are going to provide special facilities
for farmers marketing, in fast and efficient way.
CONTENTS
Sr.No. Name of topic Page no.
iv
1 Abstract
v
2 List of Content
1
3 Introduction
5 Proposed System
Requirements
6
9 Software Implementation
Technical Specifications
10
12 Software Testing
Advantages
13
Output
14
List of the figures:
Figure. No. Name of figure Page no.
3.1
5.1
5.2
5.3
5.3.2
5.3.3
5.3.4
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
8.1
8.2
10.1
2.2.1
2.2.2
4.1
4.2
Chapter 1
Introduction
As we all know internet provides us amazing facilities of searching any information from
any corner of the world by anyone. Now a day everything has become digital and each and
every one has internet facilities. ‘Kisan360’ is one of the online classified to almost sell
and buy anything related to agriculture products. There are many online sites but if you
ask for marketing related sites for farmer’s kisan360 is the appropriate website and 80% of
people buy stuff from internet, knowing to all this conditions we have created this site.
Chapter 2
Feasibility Study
Requirement Specification
In communication phase we have collect the requirements of the software through proper
communication with the Guide. In planning phase the proper plan of project is created and
tracking the schedule by guide. In next modeling phase the designing of the Image to text
software is created and in is translated into coding in construction phase. Finally the
deployment phase the software is delivered to the guide.
Feasibility Study
During the preliminary survey we examine existing software and understand the user
need. Here the feasibility study provides a feasible way to achieve goals. If project risk
is great feasibility of producing software quality reduced. During product engineering,
however we concentrate our attention on four primary areas of interest they are as
follows:
Economical Feasibility
They system requires hardware, which is already present in the organization. The
price of software and system is within client’s budget, this is economical
feasible. An evolution of document cost weight against income or benefit
derived from developed system or product.
Communication
Project initiation
Planning
Fig 2.1: Process Model
Estimating
Scheduling
Technical Feasibility
The system can develop using available equipment as well as with
Modelingand technical employees. There is no need to
available software
Analysis
develop any kind of software of recruited special technical employee.
Design
So the system is technically feasible. The technical study of software
and the hardware requirement that is the technical requirement of the
Construction
system in order to inform management user that for particular system
Codingresources in order to know the user and
dealing this much technical
Testing
management view reading technical resources. To study the function,
performance and constraint that may affect the ability to achieve an
Deployment
acceptable system.
Delivery
support
Legal Feasibility
The system is legally feasible because Development Website
which are used to authorize once. Necessary legal formalities will be
completed before Development starts. The determination of
infringement, violation, or liability that could to result from
development of the system.
Operational Feasibility
The system is developed on GUI, Environment on Windows platform
and it is fully menu driven also driven also it is user friendly. On-line
help is available for the system and thus system is operationally
feasible.
Time Feasibility
It is proposed by the client that the system must be completed within 6
months which is considerable time for development and analysis, so it
is feasible with Respect to time. Hence the project is form to
Technically, Economically, Legally and Operationally feasible.
Alternatives
An evolution of alternative approach to the development of the system
or product.
Project Plan
2.2 Semester 1:
Plan Date
1.Research Work 22 December 2017
2.Requirement Analysis 4 January 2018
3.Modelling 3 February 2018
Table 2.2: Major Milestones Semester 1
2.3 Semester 2:
Plan Date
1.Actual Coding 25 February 2018
2.Deployment 27 March 2018
Table 2.3: Major Milestones Semester 2
“process”:
A process represents transformation where incoming data flows are
change into outgoing flow data.
“Data store”:
A data store represents a repository of data that is to be stored for use
by one or more processes may be as single as buffer or queue or
sophisticated as relational database. They should have clear names.
“A Source or Sink”:
A source or sink is a person or part of an organization, which enter
or receives information from the system, but is considered to be
outside the contest of data flow model.