REBAR SCANNING REPORT

Project Name: RETROFITTING OF BAMBAN-CENTENNIAL BRIDGE


Project Location: Mabalacat, Pampanga
Client: Tokwing Construction

Test Equipment: ELCOMETER 331 CONCRETE COVERMETER


Test Method: ASTM E 3013/3013M

SITE AREA
BAMBAN CENTENNIAL BRIDGE Date: 02/26/2021
BRIDGE DETAILS
Mabalacat, Pampanga Time: 10:00 AM

Bridge Plan View

Bridge Elevation View

Is the thickness of the web plate = 40 mm?


(560-260x2 = 40mm)
Yes

Is the thickness of the lower flange correct?


下フランジの厚さは正しいでしょうか?
この数値でボルトの長さを計算します
(We will calculate the bolt length with this)

Yes, Attached is the supporting picture

Girder Details

2510

3424.4

Abutment Details
`
Project Name: RETROFITTING OF BAMBAN CENTENNIAL BRIDGE
Location: Mabalacat, Pampanga 26

Client: TOKWING CONSTRUCTION Contractor: ALPHATEC CHEMICAL CORP.

REBAR SCANNING ABUTMENT A Designation Date: 02/26/2021


REPORT GIRDER 1 A-G1 Time: 10:00 AM - 12:00NN

This is 70mm only

560

160+150+170+180-30-75 = 555mm
Inspection Pictures
*Spacing are measured from
center to center between rebars
Concrete Cover = 41mm (Average)
Rebar Size = 16mm ~ 20mm (Approximate)
*All measurements are in mm.
`
Project Name: RETROFITTING OF BAMBAN CENTENNIAL BRIDGE
Location: Mabalacat, Pampanga 26

Client: TOKWING CONSTRUCTION Contractor: ALPHATEC CHEMICAL CORP.

REBAR SCANNING ABUTMENT A Designation Date: 02/26/2021


REPORT GIRDER 2 A-G2 Time: 10:00 AM - 12:00NN

Inspection Pictures
*Spacing are measured from
center to center between rebars
Concrete Cover = 48mm (Average)
Rebar Size = 16mm ~ 20mm (Approximate)
*All measurements are in mm.
`
Project Name: RETROFITTING OF BAMBAN CENTENNIAL BRIDGE
Location: Mabalacat, Pampanga 26

Client: TOKWING CONSTRUCTION Contractor: ALPHATEC CHEMICAL CORP.

REBAR SCANNING ABUTMENT A Designation Date: 02/26/2021


REPORT GIRDER 3 A-G3 Time: 10:00 AM - 12:00NN

560

YES, this should be 75mm


75mm should be the correct value

170+560+175-160-160-160-170-180=75

Inspection Pictures
*Spacing are measured from
center to center between rebars
Concrete Cover = 45mm (Average)
Rebar Size = 16mm ~ 20mm (Approximate)
*All measurements are in mm.
`
Project Name: RETROFITTING OF BAMBAN CENTENNIAL BRIDGE
Location: Mabalacat, Pampanga 26

Client: TOKWING CONSTRUCTION Contractor: ALPHATEC CHEMICAL CORP.

REBAR SCANNING ABUTMENT A Designation Date: 02/26/2021


REPORT GIRDER 1 (OLD) OB-A-G1 Time: 10:00 AM - 12:00NN

Inspection Pictures
*Spacing are measured from
center to center between rebars
Concrete Cover = 105 mm (Average)
Rebar Size = 16mm ~ 20mm (Approximate)
*All measurements are in mm.
`
Project Name: RETROFITTING OF BAMBAN CENTENNIAL BRIDGE
Location: Mabalacat, Pampanga 26

Client: TOKWING CONSTRUCTION Contractor: ALPHATEC CHEMICAL CORP.

REBAR SCANNING ABUTMENT A Designation Date: 02/26/2021


REPORT GIRDER 5 (OLD) OB-A-G5 Time: 1:00 PM - 2:00PM

Inspection Pictures
*Spacing are measured from
center to center between rebars
Concrete Cover = 111 mm (Average)
Rebar Size = 16mm ~ 20mm (Approximate)
*All measurements are in mm.
`
Project Name: RETROFITTING OF BAMBAN CENTENNIAL BRIDGE
Location: Mabalacat, Pampanga 26

Client: TOKWING CONSTRUCTION Contractor: ALPHATEC CHEMICAL CORP.

REBAR SCANNING ABUTMENT A Designation Date: 02/26/2021


REPORT GIRDER 4 A-G4 Time: 1:00 PM - 2:00PM

Inspection Pictures
*Spacing are measured from
center to center between rebars
Concrete Cover = 111 mm (Average)
Rebar Size = 16mm ~ 20mm (Approximate)
*All measurements are in mm.
`
Project Name: RETROFITTING OF BAMBAN CENTENNIAL BRIDGE
Location: Mabalacat, Pampanga 26

Client: TOKWING CONSTRUCTION Contractor: ALPHATEC CHEMICAL CORP.

REBAR SCANNING ABUTMENT A Designation Date: 02/26/2021


REPORT GIRDER 5 A-G5 Time: 1:00 PM - 2:00PM

These pictures are A-G3

There is the same problem with A-G3


75mm should be the correct value

Inspection Pictures
*Spacing are measured from
center to center between rebars
Concrete Cover = 49 mm (Average)
Rebar Size = 16mm ~ 20mm (Approximate)
*All measurements are in mm.
`
Project Name: RETROFITTING OF BAMBAN CENTENNIAL BRIDGE
Location: Mabalacat, Pampanga 26

Client: TOKWING CONSTRUCTION Contractor: ALPHATEC CHEMICAL CORP.

REBAR SCANNING ABUTMENT A Designation Date: 02/26/2021


REPORT GIRDER 6 A-G6 Time: 1:00 PM - 2:00PM

Inspection Pictures
*Spacing are measured from
center to center between rebars
Concrete Cover = 49 mm (Average)
Rebar Size = 16mm ~ 20mm (Approximate)
*All measurements are in mm.
`
Project Name: RETROFITTING OF BAMBAN CENTENNIAL BRIDGE
Location: Mabalacat, Pampanga 26

Client: TOKWING CONSTRUCTION Contractor: ALPHATEC CHEMICAL CORP.

REBAR SCANNING ABUTMENT B Designation Date: 02/26/2021


REPORT GIRDER 1 B-G1 Time: 2:00 PM - 3:00PM

Inspection Pictures
*Spacing are measured from
center to center between rebars
Concrete Cover = 48 mm (Average)
Rebar Size = 16mm ~ 20mm (Approximate)
*All measurements are in mm.
`
Project Name: RETROFITTING OF BAMBAN CENTENNIAL BRIDGE
Location: Mabalacat, Pampanga 26

Client: TOKWING CONSTRUCTION Contractor: ALPHATEC CHEMICAL CORP.

REBAR SCANNING ABUTMENT B Designation Date: 02/26/2021


REPORT GIRDER 2 B-G2 Time: 2:00 PM - 3:00PM

Inspection Pictures
*Spacing are measured from
center to center between rebars
Concrete Cover = 43 mm (Average)
Rebar Size = 16mm ~ 20mm (Approximate)
*All measurements are in mm.
`
Project Name: RETROFITTING OF BAMBAN CENTENNIAL BRIDGE
Location: Mabalacat, Pampanga 26

Client: TOKWING CONSTRUCTION Contractor: ALPHATEC CHEMICAL CORP.

REBAR SCANNING ABUTMENT B Designation Date: 02/26/2021


REPORT GIRDER 3 B-G3 Time: 2:00 PM - 3:00PM

100 70
80

Inspection Pictures
*Spacing are measured from
center to center between rebars
Concrete Cover = 60 mm (Average)
Rebar Size = 16mm ~ 20mm (Approximate)
*All measurements are in mm.
`
Project Name: RETROFITTING OF BAMBAN CENTENNIAL BRIDGE
Location: Mabalacat, Pampanga 26

Client: TOKWING CONSTRUCTION Contractor: ALPHATEC CHEMICAL CORP.

REBAR SCANNING ABUTMENT B Designation Date: 02/26/2021


REPORT GIRDER 1 (OLD) OB-B-G1 Time: 2:00 PM - 3:00PM

100 110
80

Inspection Pictures
*Spacing are measured from
center to center between rebars
Concrete Cover = 68 mm (Average)
Rebar Size = 16mm ~ 20mm (Approximate)
*All measurements are in mm.
`
Project Name: RETROFITTING OF BAMBAN CENTENNIAL BRIDGE
Location: Mabalacat, Pampanga 26

Client: TOKWING CONSTRUCTION Contractor: ALPHATEC CHEMICAL CORP.

REBAR SCANNING ABUTMENT B Designation Date: 02/26/2021


REPORT GIRDER 5 (OLD) OB-B-G5 Time: 3:00 PM - 4:00PM

70 150
60

Inspection Pictures
*Spacing are measured from
center to center between rebars
Concrete Cover = 100 mm (Average)
Rebar Size = 16mm ~ 20mm (Approximate)
*All measurements are in mm.
`
Project Name: RETROFITTING OF BAMBAN CENTENNIAL BRIDGE
Location: Mabalacat, Pampanga 26

Client: TOKWING CONSTRUCTION Contractor: ALPHATEC CHEMICAL CORP.

REBAR SCANNING ABUTMENT B Designation Date: 02/26/2021


REPORT GIRDER 4 B-G4 Time: 3:00 PM - 4:00PM

60 10
120

Inspection Pictures
*Spacing are measured from
center to center between rebars
Concrete Cover = 100 mm (Average)
Rebar Size = 16mm ~ 20mm (Approximate)
*All measurements are in mm.
`
Project Name: RETROFITTING OF BAMBAN CENTENNIAL BRIDGE
Location: Mabalacat, Pampanga 26

Client: TOKWING CONSTRUCTION Contractor: ALPHATEC CHEMICAL CORP.

REBAR SCANNING ABUTMENT B Designation Date: 02/26/2021


REPORT GIRDER 5 B-G5 Time: 3:00 PM - 4:00PM

220 100
60

Inspection Pictures
*Spacing are measured from
center to center between rebars
Concrete Cover = 90 mm (Average)
Rebar Size = 16mm ~ 20mm (Approximate)
*All measurements are in mm.
`
Project Name: RETROFITTING OF BAMBAN CENTENNIAL BRIDGE
Location: Mabalacat, Pampanga 26

Client: TOKWING CONSTRUCTION Contractor: ALPHATEC CHEMICAL CORP.

REBAR SCANNING ABUTMENT B Designation Date: 02/26/2021


REPORT GIRDER 6 B-G6 Time: 3:00 PM - 4:00PM

140 210
60

Inspection Pictures
*Spacing are measured from
center to center between rebars
Concrete Cover = 50 mm (Average)
Rebar Size = 16mm ~ 20mm (Approximate)
*All measurements are in mm.
SITE INSPECTION BAMBAN CENTENNIAL BRIDGE Date: 02/26/2021
PICTURES Mabalacat, Pampanga Time: 10:00 AM

Site Condition
BAMBAN CENTENNIAL BRIDGE Date: 02/26/2021
TEST EQUIPMENT
Mabalacat, Pampanga Time: 10:00 AM

Elcometer 331 Concrete Covermeter


BAMBAN CENTENNIAL BRIDGE Date: 02/26/2021
TEST EQUIPMENT
Mabalacat, Pampanga Time: 10:00 AM

Actual Site Rebar Scanning


OTHER CONCERNS AND BAMBAN CENTENNIAL BRIDGE Date: 02/26/2021
CONSIDERATIONS Mabalacat, Pampanga Time: 10:00 AM

Depth of anchors to be drilled would not reach the Anchor bolts of the Steel Girders

Some Bolts on the Steel Girders are already loose / untightened

Several Obstructions were observed on the bridge underdeck