Drawing/Document ID: F08643S-Z0205-02

Drawing/Document Title: RAIN WATER DRAINAGE TRENCH LAYOUT (2)

The Categories of Approval: 1 = Approved, no comments / reviewed

Cat:
Besides the information discussed in the following, it is assumed that 2 = Approved with comments / reviewed as noted
subjects and the document itself are at least in accordance with the
Contract specification. Approval or comment will not relieve the 3 = Not approved, rejected / returned for correction
Contractor from fulfilling his contractual obligations. 4 = For information only

Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = revised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
1. 0 KE NILL Refer to comments on Z0205-01 Noted Refer to open points on
mentioned drawing

2. 0 KE NILL The pumping pit near interface # 5, shall be incorporated. This pump pit is not design Open: However,
now, this will be piping construction details and
connected to the trench. It will sizing of pump pit needs to
be site layout later. be reviewed.
Meeting Conclusion 21-04-
2021:
HEI agreed to add the
layout of pump pit & invert
of connecting trenches in
revised drawing.

3. 0 KE NILL It is recommended to split the trench system near Fire & There will be not accumulated Open: It shall be decided
potable Water Pump House. One trench should be run of water. as per Grading Plan
along the road as well to avoid accumulation of runoff on drawing to be submitted by
the south side of the area. HEI
Meeting Conclusion 21-04-
2021:

Page 1 of 8
Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = revised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
The grading plan near the
Fire fighting tanks & pump
house area will be revised
as per discussions made
on Grading Plan drawing.

4. 0 NES NIL The road centre line elevations, top of Open


kerbstone/walkway, adjacent ground elevation (to road)
HEI to update the layout of
incorporated in the most areas of layout drawing does not
trench on latest version of
match with the Levels marked on Sketch drawing for
general layout & Gradation
calculations. Please check and reconfirm.
It is highly advised that HEI
In such non-conformity, the correlation between
shall submit the Grading
calculations & rainwater drain layout and levels cannot be
Plan at the earliest.
confirmed.

Status on 27-12-2020:
As agreed in Meeting on
17-12-2020, HEI to submit
the grading plan in two
weeks. Please expedite the
submission. The details will
be finalised after DDRM
Discussions and
submission of Grading
Plan.
Meeting Conclusion 21-04-
2021:
Based on discussions of
Grading Plan drawing, HEI
will first update the Grading
Page 2 of 8
Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = revised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
Plan and then plot the rain
water drain on latest
version of Grading
Drawing.
HEI will submit the Garding
Plan and Rainwater Drain
layout drawing on 28-04-
2021.

5. 0 NES NILL Refer to comments on Drawing # F08643S-Z0205-01. Noted Refer to open points on
mentioned drawing

6. 0 NES NIL Refer Detail of #5 connection of BQPS-I, the detail of This pump pit is not design Open: However,
pump pit and new higher level drain to be constructed now, this will be piping construction details and
downstream of pump shall be incorporated. connected to the trench. It will sizing of pump pit needs to
be site layout later. be reviewed.
Meeting Conclusion 21-04-
2021:
HEI agreed to add the
layout of pump pit & invert
of connecting trenches in
revised drawing.

7. 0 NES NIL As per BDRM, the finished level for Unit 4 Area shall be Noted, HEI will revise Open: As agreed, not
minimum 3.8m MSL after grading from 4.0 m finished accordingly. updated in the drawing.
Level. Please correct the Levels mentioned as 3.77m &
Meeting Conclusion 21-04-
3.55 meter.

Page 3 of 8
Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = revised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
2021:
HEI confirmed to raise the
level of Phase IV area as
per BDRM agreement and
will revise the grading &
elevation of rainwater
trenches accordingly.

8. 0 NES NIL As per Hydraulic Statement and Sketch Drawing, the HEI will update the drawings. Open: Not incorporated.
point B7 is located upstream of connection point C9.
Meeting Conclusion 21-04-
Please check and correct.
2021:
Closed as per Drawing #
Z0205-01.

9. 0 NES NIL Please incorporate the detail of walkway on main road HEI will incorporate the typical Open: Not incorporated.
connecting south side to north side of plant. details of walkways, road and
Meeting Conclusion 21-
drain at different sections in
Moreover, please clarify how the water will flow from the 04-2021:
updated drawings.
west side ground towards the main road and further
Point will remain open
across the road to the east side drain.
until the typical details &
elevation of walkway,
road & ground is
finalised.

10. 0 NES NIL Please clarify the routing/draining of rainwater from the HEI confirm and guarntee that Open:
road (north of point X = -499.587 & Y= -11.482) the Elevation & Grading of
Shall be concluded after
connecting to the cooling water pump house. Cooling water Pump House
receipt of Grading Plan.
area will be developed in such
manner that all the rainwtaer
runoff will ultimatlely flow in to
Meeting Conclusion 21-
Page 4 of 8
Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = revised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
exisiting Trench on north side. 04-2021:
The details shall be Open: The point will be
incorporated in the Grading closed as per the
Plan of Plant. conclusion of open point
in grading drawing.

11. 0 NES NIL Layout of rain water drains in the newly developed area HEI confirm and guarntee that Open:
around and in front of cooling water pump house & the Elevation & Grading of
Shall be concluded after
Pipeline foundations is missing. Please add the detail in Cooling water Pump House
receipt of Grading Plan.
drawing. area will be developed in such
manner that all the rainwtaer Meeting Conclusion 21-
runoff will ultimatlely flow in to 04-2021:
exisiting Trench on north side.
Open: The point will be
closed as per the
conclusion of open point
in grading drawing.

12. 0 NES NIL As per the attached arrangement drawing the drain line HEI will incorporate the typical Not incorporated.
south of Phase 4 area (C1 – C6) and D1-D2 etc. are details of walkways, road and
Meeting Conclusion 21-
directly coming under the walkway. drain at different sections in
04-2021:
updated drawings.
Please incorporate the construction detail of drain coming
Point will remain open
underneath the walkway in drawing.
until the typical details &
elevation of walkway,
road & ground is
finalised.

13. 0 NES NIL Point B10 shall be upstream of connection of point F5. HEI will update drawing. Not incorporated.
Please rectify in layout drawing.
Meeting Conclusion 21-
04-2021:
Closed as per Drawing #

Page 5 of 8
Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = revised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
Z0205-01 discussion

14. 0 NES NIL The inverts of overflow pipe from fire water tanks HEI will check from Hydraulic All parties agreed
connecting into drain line H1 –H2 shall be incorporated. Speciaility and incorporate the
levels.

15. 0 NES NIL Please mention the width (B) of Main Drain (B1 to B12) in HEI will update drawing. All parties agreed.
layout Plan. At the sections where the width is increased,
the upstream transition length shall also be marked.

16. 0 NES NIL At the major interface points such as D11 & D13 and F2 HEI agreed to provide smooth Open: Detail not
& F4 etc., it must be ensured that the section size is transition for all major trench incorporated
increased prior to connection of branch line with the main interfaces similar to point # 17
Meeting Conclusion (21-4-
line. on comment sheet for Drawing
2021):
# Z0205-01.
HEI will update the drawing
and resubmit by 28-04-
2021.

17. 0 NES NIL All the rainwater surface drainage from the areas Refer to H0804, Chemical All parties agreed.
susceptible to oil leakages shall not be directly routed to group already finalized this
Rain water trenches and shall be routed through Oil water principle.
Separators of adequate capacity.

18. 0 NES NIL Please incorporate the locations of walkway provided Noted. Main water trench will Open: Branch Trench
along road in layout drawing, so that the grading, location be updated in the drawing and detail will be reviewed at
of drain and finished elevations of road centreline and branch typical details will be later stage.
kerbstone is reviewed and finalised accordingly. provided in later stage.
Meeting Conclusion 21-
04-2021:
Point will remain open
until the typical details &
Page 6 of 8
Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = revised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
elevation of walkway,
road & ground is
finalised.

19. 0 NES NIL The open areas around HRSG unit 1 area and other There is no need to provide OPEN: It will be decided
locations that are located away from road sides drains such catch basins. Rain water upon submission of
shall be provided with catch basins connected with will drain to the trench Grading Plan.
longitudinal drains. automatictly due to area slope.
As agreed to submit in two
weeks time during 17-12-
2020 DDRM, please
expedite the submission of
Grading Plan and all other
typical details.
Meeting Conclusion (21-
4-2021):
Shall be closed as per
Final Grading Drawing.

20. 0 NES NIL The connection point of drainage lines from sump pits This will not show in this Open: Not clear. What
provided in all trenches & tunnel with the Storm water drawing, it will be site route. mean of site route.
drainage channels is missing.
Shall be discussed in
As per Plant drainage scheme, all the water from the DDRM Discussions.
sumps provided inside the outdoor & indoor cable
Meeting Conclusion (21-
trenches & tunnel shall be ultimately connected to storm
4-2021):
water drainage system.
HEI will add a note in
drawing regarding the
provision of sleeve for
Page 7 of 8
Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = revised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
drainage from sump pits
of tunnel/trench to rain
water drains as per site
conditions.

One behalf ofthe Owner On behalf of the Owner’s Engineer On behalf of the Contractor
Name:

Signature
:

Date:

Page 8 of 8