Professional Documents
Culture Documents
RC Beam Analysis & Design Bs8110: Project Job Ref
RC Beam Analysis & Design Bs8110: Project Job Ref
gweru T 6/5/2021
Support conditions
Support A Vertically restrained
Rotationally free
Support B Vertically restrained
Rotationally free
Support C Vertically restrained
Rotationally free
Support D Vertically restrained
Rotationally free
Applied loading
SELF WEIGHT Other full UDL 0.99 kN/m
WALL LOAD Other full UDL 1.97 kN/m
Load combinations
Load combination 1 Support A Other 1.00
Imposed 0.00
Span 1 Other 1.00
Project Job Ref.
gweru T 6/5/2021
Imposed 0.00
Support B Other 1.00
Imposed 0.00
Span 2 Other 1.00
Imposed 0.00
Support C Other 1.00
Imposed 0.00
Span 3 Other 1.00
Imposed 0.00
Support D Other 1.00
Imposed 0.00
Analysis results
Maximum moment support A; MA_max = 0 kNm; MA_red = 0 kNm;
Maximum moment span 1 at 1429 mm; Ms1_max = 3 kNm; Ms1_red = 3 kNm;
Maximum moment support B; MB_max = -8 kNm; MB_red = -8 kNm;
Maximum moment span 2 at 2896 mm; Ms2_max = 5 kNm; Ms2_red = 5 kNm;
Maximum moment support C; MC_max = -6 kNm; MC_red = -6 kNm;
Maximum moment span 3 at 2162 mm; Ms3_max = 1 kNm; Ms3_red = 1 kNm;
Maximum moment support D; MD_max = 0 kNm; MD_red = 0 kNm;
Maximum shear support A; VA_max = 4 kN; VA_red = 4 kN
Maximum shear support A span 1 at 209 mm; VA_s1_max = 4 kN; VA_s1_red = 4 kN
Maximum shear support B; VB_max = 9 kN; VB_red = 9 kN
Maximum shear support B span 1 at 3899 mm; VB_s1_max = -7 kN; VB_s1_red = -7 kN
Maximum shear support B span 2 at 209 mm; VB_s2_max = 8 kN; VB_s2_red = 8 kN
Maximum shear support C; VC_max = -8 kN; VC_red = -8 kN
Maximum shear support C span 2 at 5422 mm; VC_s2_max = -7 kN; VC_s2_red = -7 kN
Maximum shear support C span 3 at 209 mm; VC_s3_max = 6 kN; VC_s3_red = 6 kN
Maximum shear support D; VD_max = -2 kN; VD_red = -2 kN
Maximum shear support D span 3 at 2615 mm; VD_s3_max = -1 kN; VD_s3_red = -1 kN
Maximum reaction at support A; RA = 4 kN
Unfactored other load reaction at support A; RA_Other = 4 kN
Maximum reaction at support B; RB = 17 kN
Unfactored other load reaction at support B; RB_Other = 17 kN
Maximum reaction at support C; RC = 14 kN
Unfactored other load reaction at support C; RC_Other = 14 kN
Maximum reaction at support D; RD = 2 kN
Unfactored other load reaction at support D; RD_Other = 2 kN
Rectangular section details
Section width; b = 230 mm
Section depth; h = 255 mm
Project Job Ref.
gweru T 6/5/2021
Concrete details
Concrete strength class; C25/30
Characteristic compressive cube strength; fcu = 30 N/mm2
Modulus of elasticity of concrete; Ec = 20kN/mm2 + 200 fcu = 26000 N/mm2
Maximum aggregate size; hagg = 20 mm
Reinforcement details
Characteristic yield strength of reinforcement; fy = 460 N/mm2
Characteristic yield strength of shear reinforcement; fyv = 250 N/mm2
Nominal cover to reinforcement
Nominal cover to top reinforcement; cnom_t = 30 mm
Nominal cover to bottom reinforcement; cnom_b = 30 mm
Nominal cover to side reinforcement; cnom_s = 30 mm
Support A
gweru T 6/5/2021
Mid span 1
gweru T 6/5/2021
Support B
gweru T 6/5/2021
gweru T 6/5/2021
Mid span 2
gweru T 6/5/2021
Support C
gweru T 6/5/2021
gweru T 6/5/2021
Maximum distance between bars in tension; smax = min(47000 N/mm / fs, 300 mm) = 300 mm
PASS - Satisfies the maximum spacing criteria
Mid span 3
gweru T 6/5/2021
Support D
gweru T 6/5/2021