Kebutuhan Tenaga Kerja Per 2 Afdeling (1 Emplasemen)

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

KEBUTUHAN TENAGA KERJA PER 2 AFDELING (1 EMPLASEMEN)

Luas Afdeling 600 Ha


Tipe Rumah (Unit
Norma AFD AFD Total Total
Jabatan
(Ha/HK) A B Tenaga Kerja Pintu G1 G2

Karyawan Panen 20 30 30 60 60
Karyawan Rawat 20 30 30 60 6
Tukang Muat 150 4 4 8 8
Operator Genset/Air 1,200 0.5 0.5 1 1
Baby Sitter 300 2 2 4 0
Subtotal 133 75
Mandor 1 600 1 1 2 2
Subtotal 2 2 1
Mandor Panen 300 2 2 4 4
Mandor Rawat 300 2 2 4 4
Subtotal 8 8
Krani Buah 300 2 2 4 4
Krani Afdeling 1,200 0.5 0.5 1 1
Subtotal 5 5
KERJA PER 2 AFDELING (1 EMPLASEMEN)

Tipe Rumah (Unit)


G4 G10

7.5

2
0.5
16
16

### 60 Pemanen = 30 Istri pemanen yang bekerja


### Jabatan Laki-laki Istri Karyawan Perempuan
Karyawan Panen 60 60
Karyawan Rawat 6 6 54
Tukang Muat 8 8
Operator Genset/Air 1 1
Baby Sitter 4
Krani Buah
Total 75 75 58
Ratio Rumah 1.77 1 : 1.77
Ratio HK 9 1:9
% Laki-laki 59%
% Perempuan 45%

You might also like