Page 15 - 1 

 
TAKEDOWN
15
Christy
01:26
Kraft Pulping Building Modifications ###

ENGINEERING with the SPREADSHEET


Copyright 2006 American Society of Civil Engineers 532558390.xls  
A B C D E F G H I J K L M N
KRAFT PULPING 24 May 84
This is a sample from an actual job.
Loads must be tallied and factored for column and foundation design.

Column A2 Loads Take Down


New Existing
A2 DL LL Piping Piping Sum
Roof 6.45 0 0 6.45
2 wall 2
8.45 row 20
Conveyor flr 21.5 floor 2.6 9.4 33.5
2 21.5 conveyor 23.5
8.6 8.4 17 82.45
Operating flr 21.5 6.6 28.1
2 wall 2
112.6
Mezzanine 6.5 36.4 42.9
31 at ES 31
9.6 9.6 196.1
Ground floor row 30

Figure 15-1 Structure Elevation 92.95 30.1 11 62 196.05 196.1

row 40

row 50

row 60