Professional Documents
Culture Documents
المحاضرة 3:إختبارات المفاتيح الحلقة RMU
المحاضرة 3:إختبارات المفاتيح الحلقة RMU
Short circuit
withstand current
Power frequency
Withstand voltage
Lightning Impulse
withstand voltage Up
5/26/2021 49
3-WAY
GAS
4-WAY
OIL
5/26/2021 50
CONTINUTI CHECK PRIMARY INJECTION
INSULATION
&CONTACT
• FLUKE 87 RESISTANCE TEST IR
RESISTANCE
• MEGGER MTI515
CPC100
BDV KIT
AC Hi-POT KIT BAUR
HVI
5/26/2021 51
Competent Person
Ensure competent person Risk assessment
carry out the task. • Prepared risk assessment.
تأكيد أداء المهمة بواسطة شخص • تقييم المخاطر
مؤهل
Equipment's and Tools
Safety Rules All required equipment and
tools should be checked
General Safety Rules needs
before start of work for
to be followed. suitability and integrity.
إتباع قواعد السﻼمة العامة التاكد من جهازية المعدات قبل بداية
العمل
Permit to work
Personal Protective
Permit to work system shall Equipment's
be followed with due care
wherever applicable. PPE shall be worn as
applicable.
إذن العمل
إرتداء معدات الوقاية الشخصية
5/26/2021 52
• RMU Terminal • Boundary safety tape
under test must be التأكدshould be done • At the conclusion of
cleared and • من عمل العﻼمات HV testing, attention
guarded. التحذيرﯾﺔ وعزل منطقة should be given to
• التاكد من أن أطراف اﻟﻌﻣل discharge cables and
المفاتيح الحلقية المختبرة cable systems
جاهزم ومؤمنة including test
equipment
• تفريغ شحنات المفتاح الحلقي
بعد اﻻنتهاء من اختبارات
التحمل العالي
. .
5/26/2021 53
Visual check
• ✓ Check name plate information and rating of equipment.
• ✓ Visual and wiring checks for the equipment installation & wiring
• ✓ Damages to the body /accessories and painting
Electrical Tests
✓Continuity and Phase identification check
✓ IR test at CB open & Switch 1& 2 open position
✓ Contact resistance test
✓Protection relay tests
✓ High voltage withstand test
✓Oil Breakdown voltage test (BDV) (Reports from manufacturer to be
provided at site)
✓ Testing of measuring instruments (if available) ▪ Metering CT ▪ Ammeter
✓ Operational checks for indicators
✓ Check the level of insulation medium (SF6, Oil, etc )
✓ Calibration and adjustment of instrumentation
✓ Mechanical and electrical Interlocking checks
5/26/2021 ✓ Earth fault indicator testsد 54
.
RMU TESTS
5/26/2021 55
5/26/2021 56
5/26/2021 57
The contact resistance is the resistance to the current flow in electrical connections
مقاومة التﻼمس هي ممانعة للتيار المار في الوصﻼت )نقاط الربط( الكهربائية
Due to surface conditions in the connection of contact surface, which may lead to poor or bad
connection, if it is too high causing different problems in the electrical circuits
Contact Resistance test measures the resistance of electrical connections in switching devices,
breakers, relays, joints, connectors, etc, for finding bad or corroded contacts as a preventive method,
or for diagnosis and problem solving
إختبار مقاومة التﻼمس يقيس مقاومة التﻼمس للقواطع ومفاتيح الجهد المتوسط ونقاط الربط لهذة المعدات حيث تستخدم في
تشخيص نقاط الربط السيئة وتقدم حل لهذة المشاكل
5/26/2021 58
• WHAT IS “high” Resistance?
High Resistance leads to higher losses, lower current carrying capacity and
dangerous hot spots in the Ring Main Unit or Switchgear
5/26/2021 59
5/26/2021 60
5/26/2021 61
د
5/26/2021 62
د
5/26/2021 63
5/26/2021 64
1.RMU SF6 11 KV TEST REPORT
5/26/2021 65
PROJECT CERTIFICATION DEAPARTMENT
SITE ACCEPTANCE TEST REPORT
Work Order No SHN/MDBI/148/2019
Contractor Name SAJ GLOBAL
Substation Number TX NO :618
Location & Date GURYEEN-3 & 14/6/2020
RELAY - RING MAIN UNIT
1. GENERAL DATA
RMU &CB DETAILS
TRANSFORMER DETAILS
Tested By Witnessed By
Name SAYED TAHA ABDULLA ALSAWWAFI
Date 14-6-2020 14-6-2020
Signature
R - R’ R - R’ R - R’
3 53 3.00 3.79
Tested By Witnessed By
Name SAYED TAHA ABDULLA ALSAWWAFI
Date 14-6-2020 14-6-2020
Signature
R - R’ Y - Y’ B - B’ (T
3.65 3.25 3.83
R - R’ Y - Y’ B - B’ (T
2.69 2.19 2.83
ISOLATOR 1 TO EARTH
R - R’ Y - Y’ B - B’
186 202 203
ISOLATOR 2 TO EARTH
R - R’ R - R’ R - R’
185 211 210
CIRCUIT BREAKER TO EARTH
R- Y- B-
661 625 688
Tested By Witnessed By
Name SAYED TAHA ABDULLA ALSAWWAFI
Date 14-6-2020 14-6-2020
Signature
4. FUNCTION CHECKS
6 OK
Tested By Witnessed By
Name SAYED TAHA ABDULLA ALSAWWAFI
Date 14-6-2020 14-6-2020
Signature
Tested By Witnessed By
Name SAYED TAHA ABDULLA ALSAWWAFI
Date 14-6-2020 14-6-2020
Signature
Tested By Witnessed By
Name SAYED TAHA ABDULLA ALSAWWAFI
Date 14-6-2020 14-6-2020
Signature
MODEL EFI-BFZ-50-CT100.3
SERIAL NO G104542
PART NO EA07000044
TRIP LEVEL 50 A
INDICATOR FLAG
POWER BATTERY
MADE IN Ireland
7. INSTRUMENTS DETAILS
Tested By Witnessed By
Name SAYED TAHA ABDULLA ALSAWWAFI
Date 14-6-2020 14-6-2020
Signature
1. GENERAL DATA
Sl .No. DESCRIPTION
1 RATED VOLTAGE 11/15.5 kV
3 RATED FREQUENCY 50 Hz
Tested By Witnessed By
Name SAYED TAHA HARITH ALSHEREIQI
Signature
Organization MZEC
Date 29.06.2020 29.06.2020
1
PROJECT CERTIFICATION DEAPARTMENT
SITE ACCEPTANCE TEST REPORT
Project Number PRIVATE JOB
Contractor Name AL OZON FOR ENGINEERING PROJECTS
Substation
ROP NIZWA
Number
Location & Date HAIL FIRQ & 29-06-2020
3. CONTINUITY CHECKS:
CONDITION TERMINALS REMARKS
PHASE TO PHASE R to R’ Y to Y’ B to B’
RING SWITCH 1 &
OK OK OK OK
BREAKER ON
RING SWITCH 2 &
OK OK OK OK
BREAKER ON
RING SWITCH 1 &
OK OK OK OK
RING SWITCH 2
4. FUNCTION CHECKS:
Sl .No. DESCRIPTION STATUS
1 R.M SWITCH & FUSE SWITCH ON AND OFF OK
2 EARTH SWITCH ON AND OFF OK
3 OIL GAS GAUGE INDICATION OK
4 RMU EARTHING ARRANGEMENT OK
Tested By Witnessed By
Name SAYED TAHA HARITH ALSHEREIQI
Signature
Organization MZEC
Date 29.06.2020 29.06.2020
2
PROJECT CERTIFICATION DEAPARTMENT
SITE ACCEPTANCE TEST REPORT
Project Number PRIVATE JOB
Contractor Name AL OZON FOR ENGINEERING PROJECTS
Substation
ROP NIZWA
Number
Location & Date HAIL FIRQ & 29-06-2020
Tested By Witnessed By
Name SAYED TAHA HARITH ALSHEREIQI
Signature
Organization MZEC
Date 29.06.2020 29.06.2020
3
PROJECT CERTIFICATION DEAPARTMENT
SITE ACCEPTANCE TEST REPORT
Project Number PRIVATE JOB
Contractor Name AL OZON FOR ENGINEERING PROJECTS
Substation
ROP NIZWA
Number
Location & Date HAIL FIRQ & 29-06-2020
INJECTED
CONDITION REMARKS
CURRENT
R - R’ Y - Y’ B - B’
BETWEEN SW-1 & OK
100A DC
SW-2 145.5 160.1 171.2
Tested By Witnessed By
Name SAYED TAHA HARITH ALSHEREIQI
Signature
Organization MZEC
Date 29.06.2020 29.06.2020
4