MMJ Ceiling Frame

M-BAR FURRING SYSTEM


Galvanize Component Specification
Product Material
PN Items Application Description

R - 70 (Primary Frame)
MMJ Standard length = 4m
As the main frame and and as a joint
R70 38
for the secondary frame.
10 Thickness : 0.7 mm
10
7
53
25 M - Bar Furring Clip
MMJ
MA01 56 As a connector between R-70 and pcs
M-Bar Furring Frame
Thickness : 0.7 mm

M - Bar Furring Frame


(Secondary Frame)
MMJ
Standard length = 4m
TF02 22
To suspend the ceiling panel and is
joined by R-70.
40
Thickness: 0.4 mm
27
22 Suspension Rod Clamp
MMJ 42
To suspend the R-70 / Primary pcs
A001 Frame to the Concrete Bracket and is
connected by the Suspension Rod.
Thickness : 1.2 mm

45
Concrete Bracket
MMJ 20
22 It is applied to the concrete and has pcs
A002 a function to hang the Concrete
Bracket and hold the Ceiling M-Bar
Thickness : 2 mm Furring System to the ceiling.

50
CNP Bracket
MMJ 50 pcs
M A007 To Hang on ceiling bracket to steel
structure / CNP
Thickness : 0.7 mm

Rod 0 5mm
MMJ
Suspension Rod for the Ceiling Frame pcs
A003 load and it’s hung to the Concrete
Rod 0 5mm

Thickness: 5 mm Bracket.
Standard
Base Metal : JIS G 3141
Coating Mass : Indonesian Standard : SII 0137-80/SII 0884-83
Japanese Standard : JIS G 3302
American Standard : ASTM A 525/526/A, 527/A, 528
* Specifications are subject to change without notice.

M-Bar Furring
Center Line

Center Line
M-BAR FURRING FIX TO R-70 FRAME

2 Pieces of Lock
Panel A Panel B
for Easy Installation
Lock Prevent
R-70 Slide
Profile To Secure Panel Joint
Panel Leveling indicator Grove
On Screw Installation for Easy To Installation Connection Panel M-Bar Clip

Flat Ceiling Installation


1. Bolt Concrete Bracket to the ceiling Concrete Bracket (MMJ A003) / 5mm
Suspension Rod O
at pre-determined position. Drive Pin (MMJ A003)
1200mm
2. Hang Rod to Concrete Bracket. Ensure that Susp. Rod Clamp (MMJ A001)
all Rods are at the required height. Nail R -70 @1200 mm
Metal Flushing 20x30 mm (MMJ R70) See Detail 1
3. Insert Suspension Rod Clamp to R-70 and (MMJ A006)
secure to Rod.
4. Fix the M - Bar Furring to the R-70
by using the Suspension Clip (U Clip) at M - Bar Furring Clip Board
regular interval. (MMJ MA01)
M - Bar Furring
5. Using self-tapping screw, mount the board to (MMJ TF02)
the M - Bar Furring. Cover the screw hole 600 mm
with joint compound.

Concrete Bracket
(MMJ A002)

M - Bar Furring Clip


@1200 mm (MMJ MA01)
Suspension Rod o/ 5mm Suspension Rod Clamp
(MMJ A003) (MMJ A001) R -70
(MMJ R70)
R-100 @1200 mm
(MMJ R70) M - Bar Furring
(MMJ TF02)

Board

M - Bar Furring Clip


@1200 mm (MMJ MA01)

R -70
(MMJ R70)
M - Bar Furring Clip
(MMJ MA01) M - Bar Furring
600 600 600 (MMJ TF02)

Board
Board (Or as Board
Recommendation Manufacture).
Detail 1

(The fixing of the ceiling of MMJ Ceiling M-Bar Furring System is very simple and economical and takes a
relatively short time to install).