Professional Documents
Culture Documents
Naag Chandeshwar Bridge-Model
Naag Chandeshwar Bridge-Model
BRIDGE
LVL = 4.508
NOTES:
CEILING H = 2.806
LVL = 4.687
LVL = 5.569
1. ALL DIMENSIONS ARE IN METERS
LVL = 4.889
2. DRAWING ARE NOT TO SCALE HENCE
CEILING H = 2.74
SHOULD NOT BE MEASURED.
H=2.31
LVL = 4.668
CEILING H = 2.49
CEILING H = 2.84
CEILING H = 4.310
OMKARESHWAR
PRIOR TO COMMENCEMENT OF
LVL = 5.585
H=2.79
LVL = 5.849
LVL = 5.776
MAHADEV
LVL = 4.513
UP.
UP.
CONSTRUCTION, FABRICATION OR
LVL = 4.823
UP.
CEILING H = 2.28
LVL = 5.023
A B C D E
GATE
26.57
CEILING H = 3.08
CEILING H = 2.28
CEILING H = 3.40
LVL = 5.157
LVL = 5.397
LVL = 5.087
0.3
STEEL COLMN
CEILING H = 3.57
CEILING H = 3.51
CEILING H = 3.57
CEILING H = 3.51
CEILING H = 3.48
VISHRAM DHAM
DN.
3
3 m. wide Connecting bridge in fabrication
CEILING H = 4.08
SS Railing
Checkered plat
CEILING H = 3.62
as per structure
Project : MAHAKAL RUDRA-SAGAR INTEGRATED
CEILING H = 3.58
CEILING H = 4.30
CEILING H = 3.55
ms column
LVL = 4.965
C:\Users\Abhishek\Pictures\bpl-r3112006-large.jpg
UJJAIN SMART CITY LIMITED (USCL), UJJAIN
C:\Users\Abhishek\Pictures\925845356s.png
IPE GLOBAL LIMITED. (LEAD CONSULTANT)
C:\Users\Abhishek\Pictures\pwc-company-logo.jpg
PWC. (ASSOCIATES CONSULTANT)
DWG. TITLE :
SECTION ELEVATION
SS Railing
Team Leader SANJAY SHAKYA
Checkered plat
as per structure
Date & seal(PDMC)
ms column
NAG CHANDRESHWAR
as per structure
EXISTING BUILDING
3.326
MAHAKAL TEMPLE
7.5
6.5
5.5
Approved by
4.5
Designation Signature & seal
COURT
YARD LVL Superintending Engg.
ELEVATION 0.00M