ST Mary Hill 10000 Repairing
ST Mary Hill 10000 Repairing
Excess Work & Work Not Done Div. Eng/Dist. Irrig.Eng Office……………………………….
Name of Institution: C/St. Mary Vidyalaya-Hill street
Work Description : Repairing works of buildings
Contract Amount(excluiding GST) Rs. Cts.
(as per contract agreement) Quantity Amount for
BOQ Item Actually Actual Work
Short Description of Work Unit Qty. Rate In excess Not Done Excess
No Done Done
1.00 2.00 3.00 4.00 5.00 6=5-3 7=3-5 8=4x5 9=4x6
1 chipping rendering 1,070.00 8.80 30,174.00
Sqr. 37.00 39,590.00
28.20
2 floor rendering 1/2" 4,400.00 24.08 56,848.00
Sqr. 37.00 162,800.00
12.92
3 removing iron meshes 500.00 0.00 0.00 500.00 0.00
Item 1.00 500.00
1.00
4 iron grill window 320.00 9.40 65,408.00 3,008.00
Sq.ft 195.00 62,400.00
204.40
5 painting steel 1,325.00 0.06 2,067.00 79.50
Sqr. 1.50 1,987.50
1.56
6 removing door frames 900.00 1.00 1,800.00
Nr. 3.00 2,700.00
2.00
7 door flush panelled 1,000.00 18.69 51,310.00
Sq.ft. 70.00 70,000.00
51.31
8 new wood work paint 3,030.00 0.35 3,484.50
Sqr. 1.50 4,545.00
1.15
9 brass hinges 4" x 3" 600.00 3.00 3,600.00
Nr. 9.00 5,400.00
6.00
10 mortice lock 2,160.00 1.00 4,320.00
Nr. 3.00 6,480.00
2.00
11 removing window frames 900.00 4.00 0.00
Nr. 4.00 3,600.00
0.00
12 window glazed sashes 960.00 48.00 0.00
Sq.ft. 48.00 46,080.00
0.00
13 brass hinges 4" x 2 1/2" 600.00 8.00 0.00
Nr. 8.00 4,800.00
0.00
14 brass casement stay 300.00 4.00 0.00
Nr. 4.00 1,200.00
0.00
15 brass casement fastner 250.00 4.00 0.00
Nr. 4.00 1,000.00
0.00
16 3 mm thk glass panes 230.00 10.00 0.00
Sq.ft. 10.00 2,300.00
0.00
17 semi rough plastering 5,045.00 1.59 27,293.45
Sqr. 7.00 35,315.00
5.41
18 chipping plastering 730.00 0.91 3,949.30 664.30
Sqr. 4.50 3,285.00
5.41
19 smooth plastering 6,490.00 2.50 0.00
Sqr. 2.50 16,225.00
0.00
20 water proofing baralastic 310.00 270.00 0.00
Sq.ft. 270.00 83,700.00
0.00
21 brass tower bolts 550.00 4.00 0.00
Nr. 4.00 2,200.00
0.00
22 applying barra emulsion 40.00 30.00 0.00
Sq.ft. 30.00 1,200.00
0.00
23 applying barra zinc sp 135.00 30.00 0.00
Sq.ft. 30.00 4,050.00
0.00
24 excavation 2,050.00 1.59 2,890.50
Cube 3.00 6,150.00
1.41
25 rrm 26,170.00 1.00 0.00
Cube 1.00 26,170.00
0.00
26 emulsion paint 1,980.00 4.00 0.00
Sqr. 4.00 7,920.00
0.00
27 weathershield paint 2,480.00 8.00 0.00
Sqr. 8.00 19,840.00
0.00
28 removing iron grill window 130.00 5.00 1,560.00
Nr. 17.00 2,210.00
12.00
29 iron grill window 315.00 135.42 180,992.70
Sq.ft 710.00 223,650.00
574.58
30 chipping plastering 700.00 1.24 532.00
Sqr. 2.00 1,400.00
0.76
31 semi rough plastering 5,045.00 0.95 5,297.25
Sqr. 2.00 10,090.00
1.05
32 weathershield paint 2,480.00 1.80 0.00
Sqr. 1.80 4,464.00
0.00
33 removing gutter 20.00 30.00 0.00
L.ft. 30.00 600.00
0.00
Grand Total 863,851.50 442,026.70 3,751.80
discount 15%
contract am
balance 136,254.67
FINAL
…………. Approval
A
Work Not
Reasons
Done
10=4x7
9,416.00
39,590.00 0.00
105,952.00
162,800.00 0.00
0.00
500.00 0.00
62,400.00 0.00
1,987.50 0.00
900.00
2,700.00 0.00
18,690.00
70,000.00 0.00
1,060.50
4,545.00 0.00
1,800.00
5,400.00 0.00
2,160.00
6,480.00 0.00
3,600.00
3,600.00 0.00
46,080.00
46,080.00 0.00
4,800.00
4,800.00 0.00
1,200.00
1,200.00 0.00
1,000.00
1,000.00 0.00
2,300.00
2,300.00 0.00
8,021.55
35,315.00 0.00
3,285.00 0.00
16,225.00
16,225.00 0.00
83,700.00
83,700.00 0.00
2,200.00
2,200.00 0.00
1,200.00
1,200.00 0.00
4,050.00
4,050.00 0.00
3,259.50
6,150.00 0.00
26,170.00
26,170.00 0.00
7,920.00
7,920.00 0.00
19,840.00
19,840.00 0.00
650.00
2,210.00 0.00
42,657.30
223,650.00 0.00
868.00
1,400.00 0.00
4,792.75
10,090.00 0.00
4,464.00
4,464.00 0.00
600.00
600.00 0.00
425,576.60
863,851.50
Form - B Comparative Statement FINAL
Extra Contractual Works Div. Eng/Dist. Irrig.Eng Office………………………………. Approval
Name of Institution: C/St. Mary Vidyalaya-Hill street B
Work Description : Repairing works of buildings
Contract Amount(excluiding GST) Rs. Cts.
Rate
Amount
Item No Description of Work Quantity Unit Recommende Recommended Reasons
Dept Contractor's d by the by the Engineer
Engineer
1 2 3 4 5 6 7 8=3x7 9
Ex-1 rendering 1 1/2" 16.70 sqr 6,500.00 108,550.00
Ex-2 cement bedding 1 1/2" 15.19 sqr 3,500.00 53,165.00
As per Guidelines on Government Tender Procedure (Revised Edition - August 1997) & Public Finance Circular No. 352(11) of 09.02.2001
Note :- The GST values for rows 2 to 8 I certified that the details given above are true and correct
should be given only if the contractor is
registered for GST
………………………………………………..
Date:-……………………… Divisional Engineer/Dist .Irrig. Engineer
FINAL Approval
Summary
ghe(SLTS 11B)
S Special Grade)
k Not Done
Total
974,000.00
967,513.68
4,202.02
319,987.64
324,189.66
476,645.79
152,456.14
815,057.54
…………………………………………..
visional Engineer/Dist .Irrig. Engineer
Variation To Contracts
Contingencies 133.12
Excess 3,751.80
Extra 285,703.25
815,057.54
Rendering 1 1/2" thick in cement and sand 1:3 in R.C.C. floors and
brick paved floors finished smooth with 3/8" thick neat cement
slurry without colour pigment.
Per Square
Materials
2.5 Cwt. cement 2.50 835.00 2,087.50
0.11 Cube sand 0.11 11,050.00 1,215.50
Sub Total 3,303.00
Labour
1 Day mason 1.00 950.00 950.00
1 1/2 Day labour ( including curing ) 1.50 780.00 1,170.00
Sub Total 2,120.00
SAY 6,500.00
Per Square
Materials
1.8 Cwt. Cement 1.80 835.00 1,503.00
0.08 Cube sand 0.08 11,050.00 884.00
Sub Total 2,387.00
Labour
1/8 Day mason 0.125 950.00 118.75
1/2 Day labour ( including curing ) 0.50 780.00 390.00
Sub Total 508.75
SAY 3,500.00
Per 18 L.ft.
Cement Cwt. 0.1 0.10 835.00 83.50
Lime 2 kg 2.00 12.00 24.00
Sand Cube 0.15 0.02 11,050.00 165.75
Mason Day 1.0 1.00 950.00 950.00
Labour Day 0.5 0.50 780.00 390.00
Rate per 18 L.ft. 1,613.25
SAY 100.00
Per Item
Electrician Day 3 3.00 950.00 2,850.00
SAY 3,400.00
Per 3 Sqr.
Materials
1 set of Finco Platinum fill paint ( 25 kg) 1.00 11,000.00 11,000.00
Labour
8 day Mason 8.00 980.00 7,840.00
8 day Labour 8.00 780.00 6,240.00
Sub Total 14,080.00
SAY 100.00