Monthly Outage List Approved in WRLDC OCCM For The Month of July' 2021

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

Maharashtra State Load Despatch Centre

Monthly Outage list approved in WRLDC OCCM for the Month of July' 2021
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency

For line diversion work due to samrudhi express way near


1 1 POWERGRID_WR1 400KV WARDHA-AURANGABAD-1 C 10-Jun-21 7:00 20-Jul-21 18:00
Aurangabad.(New Construction)
For line diversion work due to samrudhi express way near
2 2 POWERGRID_WR1 400KV WARDHA-AURANGABAD-2 C 10-Jun-21 7:00 20-Jul-21 18:00
Aurangabad.(New Construction)
1.Work will be carried out by IMP
powers limited.
2.Load will be shifted on ICT-01
during outage period
3.Previous outages were proposed
from 23.11.2020 to 12.12.2020,
26.02.2021 to 17.03.2021 and
1. Draining, filtration & refilling of oil for internal inspection of 3
08.04.2021 to 27.04.2021 but all
Phase, ICT-02 due to the higher values of DGA.
previous outages were not approved
2. Internal inspection work& repairing work if any abnormality
3 4 MSETCL 400KV/220KV AKOLA-ICT-2 C 21-Jun-21 09:00 10-Jul-21 18:00 due to system constraint & GT-2 is
observed during inspection.
in breakdown at Paras TPS on date
3. All testing activities required before charging & maintenance
26.02.2021
work.
4.NOC for the 150MW load relief
will required from MSEDCL.
5.Necessary changes in the LTS
will required.
6.The outage is uploaded in the
system.
400KV Dhule-BBLR II to be kept
4 28 MSETCL 400KV-DHULE-MS-BABLESHWAR-1 Daily replacement of faulty insulator if found in PID and other maint. work 1-Jul-21 08:00 1-Jul-21 17:00
on Nonauto mode.

5 37 MSETCL 400KV-RGPPL-NEW KOYNA-2 Daily Faulty string replacement Work, Hill cutting work at loc. No.94-94 1-Jul-21 08:00 3-Jul-21 18:00 Planned outage

6 41 MSETCL 400KV-BABLESHWAR-PADGHE-1 Daily For Carrying PID Work 1-Jul-21 08:00 15-Jul-21 18:00 -

Live line installation of OPGW by


Live line installation of OPGW by MTCIL, and PID Testing work MTCIL, and PID Testing work of
7 42 MSETCL 400KV-KALWA-KHARGHAR-1 Daily of line Insulator strings at various locations. Auto-Reclose function 1-Jul-21 08:00 15-Jul-21 18:00 line Insulator strings at various
to be out of service. locations. Auto-Reclose function to
be out of service.

Chandrapur 2- Nanded Ckt-II &


Chandrapur GCR- Parli Ckt- III
8 44 MSETCL 400KV-CHANDRAPU-II-NANDED-1 Daily For PID Work, Shifting of auto reclose switch to non auto mode. 1-Jul-21 08:00 31-Jul-21 17:00
lines are on on DC tower so both
lines require on same day A/R out.

Chandrapur GCR- Parli Ckt- III &


9 45 MSETCL 400KV-CHANDRAPUR-GCR-PARLI-M-3 Daily For PID Work, Shifting of auto reclose switch to non auto mode. 1-Jul-21 08:00 31-Jul-21 17:00
Chandrapur 2- Nanded Ckt-II

Continuo
10 72 MSETCL BABLESHWAR - 400KV B/R 1 400kV CGL make CB pole overhauling work 1-Jul-21 09:00 10-Jul-21 18:00 400kV Reactor I on TBC
us

400kV SSNNL-1 A/R switch will


11 73 MSETCL 400KV-SSP-DHULE-MS-1 Daily online PID testing work 1-Jul-21 09:00 31-Jul-21 17:00
be kept on non auto mode

For replacement of old disk insulator by porcelain long rod,


Bay maint. & any abnormalities
12 77 MSETCL 220KV-NASIK-NAVSARI-1 Daily Dignostic testing,broken/flash over string replacement found during 1-Jul-21 09:32 2-Jul-21 18:29
observed attending.
monkey patrolling,signature analysis,TLS fixing if issued.

400KV Dhule-BBLR I is to be kept


13 94 MSETCL 400KV-DHULE-MS-BABLESHWAR-2 Daily replacement of faulty insulator if found in PID and other maint. work 2-Jul-21 08:00 2-Jul-21 17:00
on Nonauto mode

14 102 POWERGRID_WR1 400KV-KORADI-BHILAI L/R@ KORADI - 400KV D For AMP of Reactor Bay 2-Jul-21 08:00 2-Jul-21 18:00

Continuo
15 114 MSETCL 400KV-WARORA-CHANDRAPU-II-1 Diagnostic Testing Work 2-Jul-21 09:00 2-Jul-21 16:00 Diagnostic Testing Work
us
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency

1) FIXING OF MISSING SPACERS on line


1) FIXING OF MISSING SPACERS on line by Line maintenance S/sdn, Boisar. by Line maintenance S/sdn, Boisar.
16 116 MSETCL 220KV-BOISAR-BORIVALI-1 Daily 2-Jul-21 09:00 2-Jul-21 17:00
2) Retrofitting work of Earth Isolator & R&M Work at Borivali end 2) Retrofitting work of Earth Isolator &
R&M Work at Borivali end.

400kV SSNNL-2 A/R switch will be kept


17 124 MSETCL 400KV-SSP-DHULE-MS-2 Daily Online PID testing work 2-Jul-21 09:00 31-Jul-21 17:00
on non auto mode
1)HVDC tie required to be in
BUS COUPLER BAY - PADGHE - 400KV - BUS 1) Diagnostic testing work Service
18 126 MSETCL 1 AND PADGHE - 400KV - BUS 2 at PADGHE - Daily 2) replacement of PG Isolator 2-Jul-21 09:30 2-Jul-21 18:30 2) Outage not consider in the month of
400KV 3) Attending Hot Sopt May (21 May)
3) weather condi on should be clear.

19 130 POWERGRID_WR2 220KV-BOISAR-BORIVALI D For AMP works of line terminal equipments. Line outage is required. 2-Jul-21 09:00 2-Jul-21 17:30 PG-WR2-Boisar

20 140 MSETCL 400KV-DHULE-MS-BABLESHWAR-2 Daily Online PID testing work 3-Jul-21 08:00 14-Jul-21 17:00 Line to be kept on Nonauto mode.

21 146 POWERGRID_WR1 220KV-TALEGAON-PUNE-PG-1 D For cleaning of contacts 3-Jul-21 8:30 3-Jul-21 18:00

22 152 POWERGRID_WR2 220KV-BOISAR-BOISAR-M-2 D For AMP works of line terminal equipments. Line outage is required. 3-Jul-21 8:30 3-Jul-21 17:30 PG-WR2-Boisar

1) Measurement of Tan delta & capacitance of 400KV R, Y & B-ph CTs During outage, HVDC Ckt. No.- 1 Will
400KV-CHANDRAPUR-GCR-CHANDRAPUR
23 153 MSETCL Daily which are due since 02 years. 2) Testing of LBB relay. 3) Maintenance and 3-Jul-21 09:00 3-Jul-21 18:00 be in service and there will be power
HVDC-2
alignments of PG Isolators and CB Isolators. restriction.

Bay maint. & any abnormalities


For replacement of old disk insulator by porcelain long rod, Dignostic
observed attending.(with permission to
24 158 MSETCL 220KV-NASIK-NAVSARI-2 Daily testing,broken/flash over string replacement found during monkey 3-Jul-21 09:27 4-Jul-21 18:27
shift on TBC for CB mechaniam O/H
patrolling,signature analysis,TLS fixing if issued.
work)

25 160 MSETCL 220KV-TALEGAON-PUNE-PG-1 Daily Half yearly maintenence , Diagnostic Testing. 3-Jul-21 10:00 3-Jul-21 17:00 ---

26 172 POWERGRID_WR1 400KV-KALWA-PUNE-PG-1 D Rectification of condcutor unwind problem and relay testing works. 4-Jul-21 8:30 4-Jul-21 18:00

TIE BAY - 400KV-CHANDRAPUR-


27 174 POWERGRID_WR1 BHADRAWATI-2 AND BHADRAWATI - 400KV D AMP 4-Jul-21 8:30 4-Jul-21 18:00
B/R 1 at BHADRAWATI - 400KV

28 175 MSETCL 400KV-PARLI-M-LONIKHAND-II-1 Daily DT & Chemical cleaning Work. 4-Jul-21 09:30 4-Jul-21 17:30 ---

For erection of inline Monopole (PB+0) , DD + 0 & connectivity of Koradi-


29 181 MSETCL 400KV-WARDHA-KORADI-II-1 C Wardha Ckt on ERS at Chainage - 23+650, between existing tower no. 192 5-Jul-21 6:00 8-Jul-21 22:00
& 193 on D/C Ckt.

For erection of inline Monopole PD+6 & stringing of IEPL Ckt & charging
30 182 MSETCL 400KV-IEPL-KORADI-II-1 C of IEPL Ckt on diverted route at Chainage - 23+650, between existing 5-Jul-21 6:00 11-Jul-21 22:00
tower no. 192 & 193 on D/C Ckt.

31 188 MSETCL 400KV-RGPPL-NEW KOYNA-1 Daily Routine maint. Work 5-Jul-21 08:00 5-Jul-21 18:00 Planned outage

32 200 MSETCL 400KV-DHULE-MS-BABLESHWAR-1 Daily Online PID testing 5-Jul-21 08:00 15-Jul-21 17:00 Line to be kept on Nonauto mode

AMP OF KALA KUDUS LINE 2 EQUIPMENTS/RELAY TESTTING AT KUDUS


33 203 POWERGRID_WR1 400KV-KALA-KUDUS-2 D 5-Jul-21 8:30 5-Jul-21 17:00
END.

34 205 POWERGRID_WR1 220KV-PARLI-PARLI-M-2 D For AMP of line terminal equipments 5-Jul-21 8:30 5-Jul-21 17:30

400kV Ektuni ckt I&II,400kV


Samruddhi Expressway crossing 400kV Tower Erection ,stringing and
35 231 MSETCL 400KV-BHUSAWAL-BABLESHWAR-1 C 5-Jul-21 09:00 19-Jul-21 17:00 Aurangabad and 400kV Dhule I&II lines
dismantling work
will be in in service

36 249 POWERGRID_WR1 AURANGABAD - 400KV - BUS 1 D FOR AMP Works 6-Jul-21 7:00 6-Jul-21 18:00
37 250 POWERGRID_WR1 400KV-KOLHAPUR-MS-SOLAPUR-2 D For Checking of CVT and relay testing works 6-Jul-21 7:00 6-Jul-21 18:00
38 259 MSETCL 400KV-RGPPL-NAGOTHANE-1 Daily Routine Maint. Work 6-Jul-21 08:00 6-Jul-21 18:00 Planned outage
39 260 MSETCL 220KV-WARDHA-BHUGAON-1 Daily Routine line maintainace work 6-Jul-21 08:00 6-Jul-21 18:00 NA
TIE BAY - 400KV-KOLHAPUR-MS-KOLHAPUR
40 276 POWERGRID_WR1 D Bay AMP 6-Jul-21 8:30 6-Jul-21 18:00
GIS-1 AND FUTURE at Kolhapur GIS - 400KV

Replacement of faulty Polymer insulator strings at tower No:252 and


41 280 WTPL 400KV-SOLAPUR-M-SOLAPUR-1 Daily 6-Jul-21 9:00 6-Jul-21 17:00 Outage
other line maintenance activities (Solapur - Lamboti Line)
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency

For safety purpose Auto Reclosure to be kept in OFF mode for 220KV-
42 281 WTPL 220KV-SOLAPUR-JEUR-1 Daily 6-Jul-21 9:00 6-Jul-21 17:00 AR Mode OFF
SOLAPUR-JEUR-1

43 301 POWERGRID_WR1 220KV-SOLAPUR-JEUR-1 D Line side equipments AMP 7-Jul-21 8:30 7-Jul-21 18:00

Outages will be availed subject to


44 307 MSETCL KORADI-I - 400KV - BUS 2 Daily For CVT tan delta testing 7-Jul-21 06:00 7-Jul-21 18:00
weather conditions.

400kV SSNNL-2 A/R switch will be kept


45 316 MSETCL 400KV-SSP-DHULE-MS-1 Daily Routine maint. work 7-Jul-21 08:00 7-Jul-21 18:00
on non auto mode

46 317 MSETCL 400KV-RGPPL-NAGOTHANE-2 Daily Routine Maint. Work 7-Jul-21 08:00 7-Jul-21 18:00 Planned outage

Routine Maintenance & Dignostic testing work restringing of bottom ph


47 318 MSETCL 220KV-PANDURNA-KALMESHWAR-1 Daily 7-Jul-21 08:00 7-Jul-21 18:00 NA
conductor.

48 332 MSETCL KHAPARKHEDA - 400KV - BUS 2 Daily T-connection of Bus isolator at reactor bay 7-Jul-21 08:00 7-Jul-21 20:00 NA

49 334 POWERGRID_WR1 PARLI - 220KV - BUS 1 D For Bus AMP 7-Jul-21 8:30 7-Jul-21 17:30
TIE BAY - 400KV-CHAKAN-PUNE-PG-1 AND
50 341 POWERGRID_WR1 400KV-KHARGHAR-PUNE-PG-1 at PUNE-PG - D For AMP Work 7-Jul-21 8:30 7-Jul-21 18:00
400KV
Replacement of faulty Polymer insulator strings at tower No: 9, 154 and
51 344 WTPL 220KV-SOLAPUR-JEUR-1 Daily 7-Jul-21 9:00 7-Jul-21 17:00 Outage
247 and other line maintenance activities

For safety purpose Auto Reclosure to be kept in OFF mode for 400KV-
52 345 WTPL 400KV-SOLAPUR-M-SOLAPUR-1 Daily 7-Jul-21 9:00 7-Jul-21 17:00 AR Mode OFF
SOLAPUR-M-SOLAPUR-1 (Solapur - Lamboti Line)

53 346 MSETCL 132KV-PENCH-KANHAN-1 Daily Routine Maintenance work. 7-Jul-21 09:00 7-Jul-21 17:00 NA

54 348 POWERGRID_WR2 220KV-BOISAR-TARAPUR D For AMP works of line terminal equipments. Line outage is required. 7-Jul-21 9:00 7-Jul-21 17:30 PG-WR2-Boisar

MAIN BAY - 765KV-TIRODA-KORADI-III-1 AND Continuo For attending the SF6 gas leakage in
55 355 APML For attending the SF6 gas leakage in Circuit Breaker 7-Jul-21 09:00 10-Jul-21 18:00
TIRODA - 765KV - BUS 2 us Circuit Breaker

1) Complete servicing and overhauling of Mechanism Drive, SF6 gas During outage, HVDC Ckt. No.- 1 Will
400KV-CHANDRAPUR-GCR-CHANDRAPUR Continuo monitoring assembly, pump assembly, Poles and Interrupter of all 03 be in service via TBC-2 bay and there
56 356 MSETCL 7-Jul-21 09:00 16-Jul-21 18:00
HVDC-1 us phases and attending the SF6 gas leakage problem of R-ph pole. will not be power restriction.
2)Measurement of CRM, Timing & DCRM of Circuit Breaker.

57 360 MSETCL SOLAPUR - 220KV - BUS 1 Daily Outage is required for Quarterly Maintenance 7-Jul-21 10:00 7-Jul-21 16:00 Quarterly Maintenance

58 361 MSETCL 220KV-SOLAPUR-KUMBARI-1 Daily Outage is required for Quarterly Maintenance 7-Jul-21 10:00 7-Jul-21 16:00 Quarterly Maintenance

59 363 MSETCL 220KV-WARDHA-BADNERA-1 Daily Routine line maintainance work 7-Jul-21 10:00 7-Jul-21 18:00 NA

1)Replacement of R-ph metering PT


60 364 MSETCL 132KV-DHARNI-NEPANAGAR-1 Daily 7-Jul-21 11:00 7-Jul-21 16:00 Nil
2) Line Signature Analysis & Other Maintenance Works of Line

Updating Siemens Distance Relay M1 7SA522(EN100 Module) to comply


61 369 POWERGRID_WR1 400KV-PADGHE-BOISAR-1 D 8-Jul-21 7:00 8-Jul-21 16:00
for IEC61850 and resolving front port communication issue of M1 Relay.

62 377 MSETCL 400KV-CHAKAN-PUNE-PG-1 Daily Routine Line Maintenance work. 8-Jul-21 08:00 8-Jul-21 18:00 ---
400kV SSNNL-1 A/R switch will be kept
63 378 MSETCL 400KV-SSP-DHULE-MS-2 Daily Routine maint. work 8-Jul-21 08:00 8-Jul-21 18:00
on non auto mode
Continuo 400kv TBC CGL make CB overhauling &
64 385 MSETCL DHULE-MS - 400KV - TRANSFER BUS 1 400kv TBC CGL make CB overhauling & MTAMC work 8-Jul-21 08:00 10-Jul-21 18:00
us MTAMC work
MAIN BAY - 400KV-KOLHAPUR-MS-
65 392 POWERGRID_WR1 KOLHAPUR GIS-2 AND KOLHAPUR GIS - D Bay AMP 8-Jul-21 8:30 8-Jul-21 18:00
400KV - BUS 1 at Kolhapur GIS - 400KV

MAIN BAY - 220KV-BOISAR-BOISAR-M-1 AND


66 399 POWERGRID_WR2 D For AMP works 8-Jul-21 9:00 8-Jul-21 17:30 PG-WR2-Boisar
BOISAR - 220KV - BUS 1 at BOISAR - 220KV

67 407 MSETCL 400KV-PARLI-M-SOLAPUR-M-1 Daily Hardware Tightening and Fitting Work. 8-Jul-21 09:30 8-Jul-21 18:30 -

68 413 MSETCL 400KV-WARDHA-WARORA-1 Daily Routine Maintenance & Dignostic testing work . 9-Jul-21 09:00 9-Jul-21 17:00 400KV WARORA-IEPL Line is in ckt

69 421 MSETCL 220KV-PARLI-OSMANABAD-M-1 Daily Line maintenance 9-Jul-21 08:00 9-Jul-21 17:00 -

400kV SSNNL-2 A/R switch will be kept


70 423 MSETCL 400KV-SSP-DHULE-MS-1 Daily Routine maint.work 9-Jul-21 08:00 9-Jul-21 18:00
on non auto mode

71 424 MSETCL 220KV-WARDHA-PUSAD-1 Daily Routine line maintainace work 9-Jul-21 08:00 9-Jul-21 18:00 NA
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency

For replacement of quadraple conductor span between 400kV Talegaon &


72 436 MSETCL 400KV-KALWA-KHARGHAR-1 C 9-Jul-21 8:00 11-Jul-21 18:00
Kalwa line of 400kV B Bus.

BUS COUPLER BAY - KHARGHAR - 400KV -


For replacement of quadraple conductor span between 400kV Talegaon &
73 437 MSETCL BUS 1 AND KHARGHAR - 400KV - BUS 2 at C 9-Jul-21 8:00 11-Jul-21 18:00
Kalwa line of 400kV B Bus.
KHARGHAR - 400KV

For replacement of quadraple conductor span between 400kV Talegaon &


74 438 MSETCL KHARGHAR - 400KV - BUS 2 C 9-Jul-21 8:00 11-Jul-21 18:00
Kalwa line of 400kV B Bus.
75 440 POWERGRID_WR1 PARLI - 220KV - BUS 2 D For Bus AMP 9-Jul-21 8:30 9-Jul-21 17:30
76 458 MSETCL 220KV-SOLAPUR-JEUR-1 Daily Outage is required for Quarterly Maintenance 9-Jul-21 10:00 9-Jul-21 17:00 Quarterly Maintenance

77 462 POWERGRID_WR1 220KV-TALEGAON-PUNE-PG-2 D For cleaning of contacts 10-Jul-21 8:30 10-Jul-21 18:00

For Conductor & Earthwire H/W


78 470 MSETCL 400KV-WARORA-CHANDRAPU-II-2 Daily For Conductor & Earthwire H/W ghtening work if found any during MP 10-Jul-21 08:00 10-Jul-21 17:00
ghtening work if found any during MP

400kV SSNNL-1 A/R switch will be kept


79 472 MSETCL 400KV-SSP-DHULE-MS-2 Daily Routine maint. work 10-Jul-21 08:00 10-Jul-21 18:00
on non auto mode
MAIN BAY - 220KV-BOISAR-BORIVALI AND
80 479 POWERGRID_WR2 D For AMP works 10-Jul-21 9:00 10-Jul-21 17:30 PG-WR2-Boisar
BOISAR - 220KV - BUS 1 at BOISAR - 220KV
81 483 MSETCL 220KV-TALEGAON-PUNE-PG-2 Daily Half yearly maintenance, Diagnostic Testing 10-Jul-21 10:00 10-Jul-21 17:00 --

82 488 MSETCL 400KV-WARDHA-KORADI-II-1 Daily Routine Maintenance & Dignostic testing work . 11-Jul-21 09:00 11-Jul-21 17:00 400 KV WARORA - DEOLI 2 Line is in ckt

REPLACEMENT OF INSULATOR STRING


REPLACEMENT OF INSULATOR STRING and 220 kV Bay maintenance at
83 489 MSETCL 220KV-BOISAR-NALASOPARA-1 Daily 11-Jul-21 09:00 11-Jul-21 17:00 and 220 kV Bay maintenance at 220 kV
220 kV Nalasopara S/S.
Nalasopara S/S.

For disconnecting on ERS & charging of 400KV Koradi-II - Wardha Ckt on


84 494 MSETCL 400KV-WARDHA-KORADI-II-1 Daily 12-Jul-21 6:00 12-Jul-21 22:00
diverted route at Ch. 23+650

85 495 POWERGRID_WR1 AURANGABAD - 400KV - BUS 2 D FOR AMP Works 12-Jul-21 7:00 12-Jul-21 18:00
BUS COUPLER BAY - BABLESHWAR - 400KV -
86 499 MSETCL BUS 1 AND BABLESHWAR - 400KV - BUS 2 at Daily Diagnostic Testing CT CB 12-Jul-21 08:00 12-Jul-21 18:00 400KV Bus 1 & 2 seperated
BABLESHWAR - 400KV
87 500 MSETCL 220KV-WARDHA-BHUGAON-1 Daily Routine line maintainace work 12-Jul-21 08:00 12-Jul-21 18:00 NA
BUS COUPLER BAY OF DHULE - 400KV - BUS
Continuo 400kv BC CGL make CB overhauling &
88 508 MSETCL 1 AND DHULE - 400KV - BUS 2 @DHULE - 400kv BC CGL make CB overhauling & MTAMC work 12-Jul-21 08:00 14-Jul-21 18:00
us MTAMC work
400KV at DHULE - 400KV

only Tie CB 412 is in OFF condition


TIE BAY - 400KV-WARORA-CHANDRAPU-II-2 Routine maintainance and DCRM/CRM/CB Timings Testing works and
89 522 MSETCL Daily 12-Jul-21 09:00 12-Jul-21 17:00 ,respective ckt charged through its own
AND 400KV-TIRODA-WARORA-1 isolater maintainance work .
main CB.

Quarterly maint. Of bay equipments & Half yearly maint. Of 220 kV Bus
90 525 MSETCL 220KV-MUDSHINGI-CHIKKODI-II-1 Daily 12-Jul-21 9:00 12-Jul-21 18:00
Secton II & III.
Quarterly maint. Of bay equipments & Half yearly maint. Of 220 kV Bus
91 526 MSETCL 220KV-MUDSHINGI-CHIKKODI-II-1 Daily 12-Jul-21 9:00 12-Jul-21 18:00
Secton II & III.
MAIN BAY - 765KV-TIRODA-KORADI-III-2 AND Continuo For attending the SF6 gas leakage in
92 535 APML For attending the SF6 gas leakage in Circuit Breaker 12-Jul-21 09:00 14-Jul-21 18:00
TIRODA - 765KV - BUS 2 us Circuit Breaker
1.Replacement of
a. 400kV TBC B bus B ph isolator
b. 400kV Solapur Bay B bus R ph isolator
2. Annual Maintenance of Main Bus 2. All 400kV Bays should be shifted online
93 538 MSETCL KOLHAPUR-MS - 400KV - BUS 2 C 12-Jul-21 09:00 17-Jul-21 18:00
3. Alignment of all 400kV B bus isolators by online shifting one by one bay on 400kV Main Bus 1
on TBC.
4. C & tan delta testing of B bus CVT.
5. Chemical cleaning of Bus Strings.

For Conductor & Earthwire H/W


94 550 MSETCL 400KV-WARORA-CHANDRAPU-II-1 Daily For Conductor & Earthwire H/W ghtening work if found any during MP 13-Jul-21 08:00 13-Jul-21 17:00
ghtening work if found any during MP

95 566 POWERGRID_WR1 400KV-PARLI-SOLAPUR-1 D For AMP of line terminal equipments and relay testing works. 13-Jul-21 8:30 13-Jul-21 17:30

MAIN BAY - 400KV-WARDHA-KORADI-II-1


96 573 MSETCL Daily Routine Maintenance & Dignostic testing work . 13-Jul-21 09:00 13-Jul-21 17:00 na
AND WARDHA - 400KV - BUS 1

For Line Equipment maintenance. (Line


97 578 MEGPTCL 400KV-KORADI-II-KORADI-III-1 Daily For Line Equipment maintenance. (Line Connected with 412 Main Bay) 13-Jul-21 09:00 13-Jul-21 18:00
Connected with 412 Main Bay)

98 592 MSETCL 220KV-AURANGABAD-CHITEGAON-2 Daily Breaker CRM & timing measurement work. 13-Jul-21 11:00 13-Jul-21 16:00 The line will be in service

Replacement of bus 1 Pantograph isolators of PGCIL ckt-1 and PGCIL ckt-2


99 632 POWERGRID_WR1 CHANDRAPUR-GCR - 400KV - BUS 1 C 15-Jul-21 8:00 18-Jul-21 18:00
at GCR
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency

Replacement of bus 1 Pantograph isolators of PGCIL ckt-3 and PGCIL ckt-4


100 633 POWERGRID_WR1 400KV-CHANDRAPUR-BHADRAWATI-3 C 15-Jul-21 8:00 18-Jul-21 18:00
at GCR
Replacement of bus 1 Pantograph isolators of PGCIL ckt-3 and PGCIL ckt-4
101 634 POWERGRID_WR1 400KV-CHANDRAPUR-BHADRAWATI-4 C 15-Jul-21 8:00 18-Jul-21 18:00
at GCR

For erection of DD+3 Inline Monopole & DD+0 inline Monopole & stringing
102 635 MSETCL 400KV-WARDHA-KORADI-II-1 C on diverted route at Ch. 27 + 650, between existing tower no. 202 & 203 15-Jul-21 6:00 20-Jul-21 22:00
on existing 400KV D/C line.

For erection of DD+3 Inline Monopole & DD+0 inline Monopole & stringing
103 636 MSETCL 400KV-IEPL-KORADI-II-1 C on diverted route at Ch. 27 + 650, between existing tower no. 202 & 203 15-Jul-21 6:00 20-Jul-21 22:00
on existing 400KV D/C line.

400KV dhule-BBLR II is to be kept on


104 643 MSETCL 400KV-DHULE-MS-BABLESHWAR-1 Daily replacement of faulty insulator if found in PID and other maint. work 15-Jul-21 08:00 15-Jul-21 17:00
Nonauto mode
TIE BAY - 400KV-WARDHA-WARORA-1 AND
105 658 MSETCL Daily Routine Maintenance & Dignostic testing work . 15-Jul-21 09:00 15-Jul-21 17:00 na
FUTURE

106 659 MSETCL 400KV-PARLI-M-PARLI-2 Daily (1) C & Tan delta measurement of CVTs. (2) Bay maintenance work. 15-Jul-21 09:00 15-Jul-21 18:00 -

TIE BAY OF 765KV/21KV TIRODA-GT-4 AND For attending the SF6 gas leakage in
Continuo For attending the SF6 gas leakage in Circuit Breaker (702 TIE BAY at
107 666 APML 765KV/400KV TIRODA-ICT-1 @TIRODA - 15-Jul-21 09:00 17-Jul-21 18:00 Circuit Breaker (702 TIE BAY at TIRODA
us TIRODA - 765KV)
765KV - 765KV)

108 674 POWERGRID_WR2 220KV-BOISAR-BOISAR-M-1 D For AMP works of line terminal equipments. Line outage is required. 16-Jul-21 9:00 16-Jul-21 17:30 PG-WR2-Boisar

400KV Dhule-BBLR I is to be kept on


109 681 MSETCL 400KV-DHULE-MS-BABLESHWAR-2 Daily replacement of faulty insulator if found in PID and other maint. Work 16-Jul-21 08:00 16-Jul-21 17:00
Nonauto mode
110 682 MSETCL 220KV-PARLI-OSMANABAD-M-1 Daily Line maintenance 16-Jul-21 08:00 16-Jul-21 17:00 -
BUS COUPLER BAY - KHARGHAR - 400KV -
Routine Maintenance work and
111 683 MSETCL BUS 1 AND KHARGHAR - 400KV - BUS 2 at Daily Routine Maintenance work and Diagnostic Testing 16-Jul-21 08:00 16-Jul-21 18:00
Diagnostic Testing
KHARGHAR - 400KV
112 693 MSETCL 400KV-BABLESHWAR-PADGHE-2 Daily For Carrying PID Work 16-Jul-21 08:00 31-Jul-21 18:00 -

Live line installation of OPGW by


Live line installation of OPGW by MTCIL, and PID Testing work of line MTCIL, and PID Testing work of line
113 694 MSETCL 400KV-KHARGHAR-PUNE-PG-1 Daily Insulator strings at various locations. Auto-Reclose function to be out of 16-Jul-21 08:00 31-Jul-21 18:00 Insulator strings at various locations.
service. Auto-Reclose function to be out of
service.

114 720 POWERGRID_WR1 400KV-KHARGHAR-PUNE-PG-1 D For Checking of CVT and relay testing works 17-Jul-21 8:30 17-Jul-21 18:00

1) SE TCC Vashi instructed to test the


400kV Busbar system.
115 727 MSETCL KHARGHAR - 400KV - BUS 1 Daily Online testing of 400kV Busbar 17-Jul-21 08:00 17-Jul-21 18:00 2) All feeders & its own protection will
be in service.
3) No any load will be affected.

1) SE TCC Vashi instructed to test the


400kV Busbar system.
116 728 MSETCL KHARGHAR - 400KV - BUS 2 Daily Online testing of 400kV Busbar 17-Jul-21 08:00 17-Jul-21 18:00 2) All feeders & its own protection will
be in service.
3) No any load will be affected.

117 729 MP_SLDC 400KV-SSP-RAJGARH-2 D FOR LINE MAINTENANCE WORK 17-Jul-21 8:00 17-Jul-21 18:00

118 730 MP_SLDC 400KV Main Bus-I at 400KV S/s Indira Sagar D RELAY TESTING WORK BY SERVICE ENGINEER 17-Jul-21 8:00 17-Jul-21 18:00

400KV-WARDHA-WARORA-PG-2 L/R@
119 731 POWERGRID_WR1 D For AMP of Reactor Bay 17-Jul-21 8:00 17-Jul-21 18:00
WARDHA - 400KV
For AMP of line terminal equipments, relay testing works. AR to be kept in
120 734 POWERGRID_WR1 400KV-PARLI-M-PARLI-2 D 17-Jul-21 8:30 17-Jul-21 17:30
non Auto mode for 400kV Parli-Parli-I

121 738 MSETCL 220KV-TARAPUR 1&2-BORIVALI-1 Daily FIXING OF MISSING SPACERS 17-Jul-21 09:00 17-Jul-21 17:00 FIXING OF MISSING SPACERS

1) Measurement of Tan delta & capacitance of 400KV R, Y & B-ph CTs During outage, HVDC Ckt. No.- 2 Will
400KV-CHANDRAPUR-GCR-CHANDRAPUR which are due since 02 years. 2) Maintenance and alignments of PG be in service and there will be power
122 739 MSETCL Daily 17-Jul-21 09:00 17-Jul-21 18:00
HVDC-1 Isolators and CB Isolators. restriction.

123 747 POWERGRID_WR1 400KV-ALKUD-SOLAPUR-1 D Line Equipment AMP Works 18-Jul-21 7:00 18-Jul-21 18:00
400kV-SOLAPUR-ALKUD LR@ SOLAPUR-
124 748 POWERGRID_WR1 D Line Reactor AMP Works 18-Jul-21 7:00 18-Jul-21 18:00
400KV
125 751 MSETCL 400KV-PARLI-M-LONIKHAND-II-1 Daily Hardware Tightening and Fitting Work. 18-Jul-21 09:30 18-Jul-21 18:30 -
Insulator replacement work in Anand
126 753 MSETCL 400KV-KALWA-PADGHE-1 Daily Insulator replacement work in Anand Nagar MIDC area 18-Jul-21 08:00 18-Jul-21 18:00
Nagar MIDC area
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency

1) Bay Maintenance work 2) Diagnostic Testing work


127 756 MSETCL 400KV-KALWA-PADGHE-1 Daily 18-Jul-21 09:30 18-Jul-21 18:30 Weather condition should be clear
3) A ending Hot Spot

1) Bay maintenance work


128 758 POWERGRID 400KV-PADGHE-BOISAR-1 Daily 2) Diagnostic Testing work 19-Jul-21 09:30 19-Jul-21 18:30 Weather condition should be clear
3) Attending Hot Spot

129 763 MSETCL 220KV-WARDHA-PUSAD-1 Daily Routine line maintainace work 19-Jul-21 08:00 19-Jul-21 18:00 NA

MAIN BAY - 400KV-WARDHA-WARORA-1 AND Attending of SF6 gas leakage at top of the Y-Phase pole of 429 Main CB at Line will be charged through Tie CB
130 776 MSETCL Daily 19-Jul-21 09:00 19-Jul-21 17:00
WARDHA - 400KV - BUS 2 400 KV PGCIL Deoli S/Stn. By complete O/H of Y-Pole. 428.

MAIN BAY - TIRODA - 765KV B/R 1 AND Continuo For attending the SF6 gas leakage in
131 789 APML For attending the SF6 gas leakage in Circuit Breaker 19-Jul-21 09:00 20-Jul-21 18:00
TIRODA - 765KV - BUS 1 us Circuit Breaker
Outage not availed Since last five
132 794 MSETCL 400KV-KOLHAPUR-MS-ALKUD-1 Daily Quarterly Maintenance & Diagnostic testing work 20-Jul-21 09:00 20-Jul-21 18:00
Months

133 795 MSETCL ALKUD - 400KV - BUS 1 Daily Quarterly Maintenance & Diagnostic Testing Work 20-Jul-21 09:00 20-Jul-21 18:00 Outage not availed since Dec 2020

134 811 POWERGRID_WR1 220KV-PARLI-PARLI-M-1 D For AMP of line terminal equipments 20-Jul-21 8:30 20-Jul-21 17:30

400kV Ektuni ckt II,400kV Bhusawal,


135 816 MSETCL 400KV-EKTUNI-BABLESHWAR-1 Daily 29D & 29C Isolator repairing work. 20-Jul-21 09:00 20-Jul-21 17:00 Dhule I&II and 400kV Aurangabad will
be in in service

136 829 MSETCL 220KV-WARDHA-WARDHA-M-1 Daily Routine line maintainace work 20-Jul-21 10:00 20-Jul-21 18:00 NA
T-Connection of Bus isolator of Reactor bay For 400kV, 125 MVAR Bus
137 836 MSETCL KORADI-II - 400KV - BUS 2 Daily 21-Jul-21 8:00 22-Jul-21 20:00
Shunt Reactor (bay no. 415).
TIE BAY - 400KV/20KV KORADI-II-GT-9 AND T-Connection of Bus isolator of Reactor bay For 400kV, 125 MVAR Bus
138 837 MSETCL Daily 21-Jul-21 8:00 22-Jul-21 20:00
FUTURE at KORADI-II - 400KV Shunt Reactor (bay no. 415).
400kV Ektuni ckt I,400kV Bhusawal,
139 840 MSETCL 400KV-EKTUNI-BABLESHWAR-2 Daily 29D & 29C Isolator repairing work. 21-Jul-21 09:00 21-Jul-21 17:00 Dhule I&II and 400kV Aurangabad will
be in in service

140 841 MSETCL 132KV-PENCH-MANSAR-1 Daily Routine Maintenance work. 21-Jul-21 09:00 21-Jul-21 17:00 NA

765KV-TIRODA-KORADI-III-1 L/R@ TIRODA - Continuo For attending the SF6 gas leakage in
141 846 APML For attending the SF6 gas leakage in Circuit Breaker 21-Jul-21 09:00 23-Jul-21 18:00
765KV us Circuit Breaker
142 851 MSETCL KHAPARKHEDA - 400KV - BUS 1 Daily Centre Break Bus Isolator Maintenance Work 21-Jul-21 10:00 21-Jul-21 18:00 NA
Replacement of BUS-2 Pantograph isolators of PGCIL ckt-1 and PGCIL ckt-2
143 853 POWERGRID_WR1 CHANDRAPUR-GCR - 400KV - BUS 2 C 22-Jul-21 8:00 25-Jul-21 18:00
at GCR

Replacement of BUS-2 Pantograph isolators of PGCIL ckt-1 and PGCIL ckt-2


144 854 POWERGRID_WR1 400kV BHADRAWATI-CHANDRAPUR-1 C 22-Jul-21 8:00 25-Jul-21 18:00
at GCR

Replacement of BUS-2 Pantograph isolators of PGCIL ckt-1 and PGCIL ckt-2


145 855 POWERGRID_WR1 400kV BHADRAWATI-CHANDRAPUR-2 C 22-Jul-21 8:00 25-Jul-21 18:00
at GCR

146 856 MSETCL 220KV-WARDHA-PUSAD-1 Daily For Routine Maintenance Work 22-Jul-21 07:00 22-Jul-21 18:00 Nil
MAIN BAY - DHULE-MS - 400KV B/R 1 AND
147 857 POWERGRID_WR1 DHULE-MS - 400KV - BUS 1 at DHULE-MS - D FOR AMP WORKS 22-Jul-21 7:00 22-Jul-21 18:00
400KV
148 865 POWERGRID_WR1 220KV-PARLI-OSMANABAD-M-1 D For AMP of line terminal equipments 22-Jul-21 8:30 22-Jul-21 17:30

149 873 POWERGRID_WR2 765KV/400KV VADODARA-ICT-1 D For swapping of Spare unit with main unit. Dia will be open on both sides. 22-Jul-21 9:00 22-Jul-21 12:00 PG-WR2-Vadodara

400kV Parali-Lonikand-II Ckt-I will be in


150 874 MSETCL 400KV-PARLI-M-LONIKHAND-II-2 Daily Half yearly maintenance and diagnostic testing. 22-Jul-21 09:00 22-Jul-21 18:00
service.

151 875 MP_SLDC 220KV-PANDHURNA-MP-KALMESHWAR-MH D FOR LINE MAINTENANCE WORK 22-Jul-21 9:00 22-Jul-21 18:00

152 887 POWERGRID_WR2 220KV-BOISAR-BOISAR-M-3 D For AMP works of line terminal equipments. Line outage is required. 23-Jul-21 9:00 23-Jul-21 17:30 PG-WR2-Boisar

For shifting 400KV Warora-IEPL Ckt on ERS at ch. No. 27 + 400 between
153 889 MSETCL 400KV-IEPL-WARORA-1 Daily 23-Jul-21 6:00 23-Jul-21 22:00
existing tower no. 1A to 3A on this D/C ckt line.

154 891 POWERGRID_WR1 400KV-AURANGABAD-M (WALUJ)-PUNE-PG-1 D FOR LINE CT AMP WORKS 23-Jul-21 7:00 23-Jul-21 18:00

155 892 MSETCL 220KV-PARLI-PARLI-M-2 Daily Line maintenance 23-Jul-21 08:00 23-Jul-21 17:00 -

continuou For erection of PB+0 & PD+9 Inline Monopoles & stringing of 400KV
156 917 MSETCL 400KV-IEPL-KORADI-II-1 24-Jul-21 6:00 27-Jul-21 22:00
s Koradi-II - IEPL Ckt on diverted route between existing tower no. 2A & 3A

For Khandwa-1 LR & Line CT AMP. AR to be kept in non mode for Ckt-2
157 920 POWERGRID_WR1 400KV-KHANDWA-DHULE-MS-1 D 24-Jul-21 7:00 24-Jul-21 18:00
during the outage
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency

Replacement of AUXILLARY BUS Pantograph isolators of PGCIL ckt-1 and


158 925 POWERGRID_WR1 CHANDRAPUR-GCR - 400KV - TRANSFER BUS C 24-Jul-21 8:00 27-Jul-21 18:00
PGCIL ckt-2 at GCR

Replacement of AUXILLARY BUS Pantograph isolators of PGCIL ckt-1 and


159 926 POWERGRID_WR1 400kV BHADRAWATI-CHANDRAPUR-1 C 24-Jul-21 8:00 27-Jul-21 18:00
PGCIL ckt-2 at GCR

Replacement of AUXILLARY BUS Pantograph isolators of PGCIL ckt-1 and


160 927 POWERGRID_WR1 400kV BHADRAWATI-CHANDRAPUR-2 C 24-Jul-21 8:00 27-Jul-21 18:00
PGCIL ckt-2 at GCR

161 931 MSETCL 220KV-TARAPUR 1&2-BOISAR-M-1 Daily REPLACEMENT OF INSULATOR STRING 24-Jul-21 09:00 24-Jul-21 17:00 REPLACEMENT OF INSULATOR STRING

MAIN BAY - 765KV/400KV TIRODA-ICT-1 AND Continuo For attending the SF6 gas leakage in
162 934 APML For attending the SF6 gas leakage in Circuit Breaker 24-Jul-21 09:00 27-Jul-21 18:00
TIRODA - 400KV - BUS 2 us Circuit Breaker

Insulator replacement work in Anand


163 936 MSETCL 400KV-KALWA-PADGHE-2 Daily Insulator replacement work in Anand Nagar MIDC area 25-Jul-21 08:00 25-Jul-21 18:00
Nagar MIDC area

For Khandwa-2 LR & Line CT AMP. AR to be kept in non mode for Ckt-2
164 939 POWERGRID_WR1 400KV-KHANDWA-DHULE-MS-2 D 26-Jul-21 7:00 26-Jul-21 18:00
during the outage

165 947 POWERGRID_WR1 220KV-WARDHA-PUSAD-1 D For AMP of Line Bay 26-Jul-21 8:00 26-Jul-21 18:00

for PID Testing Work,shifting


166 948 MSETCL 400KV-WARORA-CHANDRAPU-II-2 Daily for PID Tes ng Work,shi ing autoreclose switch to Non auto Mode 26-Jul-21 08:00 31-Jul-21 17:00
autoreclose switch to Non auto Mode

for PID Testing Work,shifting


167 949 MSETCL 400KV-WARORA-CHANDRAPU-II-1 Daily for PID Tes ng Work,shi ing autoreclose switch to Non auto Mode 26-Jul-21 08:00 31-Jul-21 17:00
autoreclose switch to Non auto Mode

168 954 GETCO 220KV-NASIK-NAVSARI-2 Daily maintenance work 26-Jul-21 9:00 26-Jul-21 18:00
BUS COUPLER BAY - PARLI-M - 400KV - BUS
169 955 MSETCL 1 AND PARLI-M - 400KV - BUS 2 at PARLI-M - Daily (1) LBB & Backup relay testing work. (2)Bay maintenance work. 26-Jul-21 09:00 26-Jul-21 18:00 -
400KV
170 982 MSETCL 400KV-KORADI-II-KORADI-III-2 Daily Line maintenance work. 27-Jul-21 09:00 27-Jul-21 18:00 NA
Commissioning bus bar relay of Main 417 bay & Spare ICT and servicing
171 983 MSETCL AKOLA - 400KV - BUS 2 Daily & alignment of isolators /earth switches will be carried out by Agency and 27-Jul-21 09:00 27-Jul-21 19:00 Bus-01 will be in service
Routine maintenance & testing work

172 985 MSETCL 400KV-KORADI-II-KORADI-III-1 Daily Line maintenance work. 28-Jul-21 09:00 28-Jul-21 18:00 NA

173 986 MSETCL 400KV-IEPL-WARORA-1 Daily To disconnect 400KV Warora -IEPL from ERS & charging on diverted route. 28-Jul-21 6:00 28-Jul-21 22:00

174 988 POWERGRID_WR1 400KV-AURANGABAD-M (WALUJ)-PUNE-PG-2 D FOR LINE CT AMP WORKS 28-Jul-21 7:00 28-Jul-21 18:00

Routine maintainance and diagonastic testing such as CVT/ CT


175 990 MSETCL WARORA - 400KV - BUS 1 Daily 28-Jul-21 08:00 28-Jul-21 18:00 400KV MAIN BUS-2 WILL BE IN SERVICE
tandelta,and ,isolater maintainance work

Quarterly Maint. Work & Diagnostic Testing Work


176 1001 MSETCL ALKUD - 400KV - BUS 2 Daily 28-Jul-21 09:00 28-Jul-21 18:00 Outage not Availed since DEC 2020

Quarterly Maint. Work & Diagnostic Testing Work


177 1002 MSETCL 400KV-ALKUD-SOLAPUR-1 Daily 28-Jul-21 09:00 28-Jul-21 18:00 Outage not availed since DEC 2020

765KV-TIRODA-KORADI-III-2 L/R@ TIRODA - Continuo For attending the SF6 gas leakage in
178 1005 APML For attending the SF6 gas leakage in Circuit Breaker 28-Jul-21 09:00 29-Jul-21 18:00
765KV us Circuit Breaker

179 1008 MSETCL 220KV-SOLAPUR-KUMBARI-2 Daily Outage is required for Quarterly Maintenance 28-Jul-21 10:00 28-Jul-21 16:00 Quarterly Maintenance

180 1009 MSETCL SOLAPUR - 220KV - BUS 2 Daily Outage is required for Quarterly Maintenance 28-Jul-21 10:00 28-Jul-21 16:00 Quarterly Maintenance
181 1010 MSETCL 220KV-WARDHA-PUSAD-1 Daily For Routine Maintenance Work 29-Jul-21 07:00 29-Jul-21 18:00 Nil
QM of bay 125MVAR Reactor is ready for charge/
182 1018 MSETCL KOLHAPUR-MS - 400KV B/R 1 Daily 29-Jul-21 09:00 29-Jul-21 18:00
Diagnostic testing with PGCIL team in servive.

(1) For Main-2 distance relay testing work.(2)Bay maintenance work. 3)


183 1019 MSETCL 400KV-PARLI-M-LONIKHAND-II-2 Daily 29-Jul-21 09:00 29-Jul-21 18:00 -
Hardware Tightening and Fitting Work.

Servicing & alignment of isolators /earth switches will be carried out by


184 1020 MSETCL AKOLA - 400KV - BUS 1 Daily 29-Jul-21 09:00 29-Jul-21 18:00 Bus-02 will be in service
Agency and Routine maintenance & testing work
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency

Outage is required on 400KV GCR


C'pur - PGCIL Bhadrawati Ckt. No.- 3
1) For replacement of old damaged quadraple bus conductor of Main Bus-I
line, as the this circuit can not be
185 1023 MSETCL 400KV-CHANDRAPUR-BHADRAWATI-1 C in 400KV HVDC ckt.-1 bay and 400KV GT-6 bay section span. 2)Tightening 29-Jul-21 09:00 31-Jul-21 18:00
shifted on 400KV Main Bus-2 due to
of nut bolts & hardware of Main Bus-I.
problems of PG isolators of Bus-2 .

Outage is required on 400KV GCR


C'pur - PGCIL Bhadrawati Ckt. No.- 4
1) For replacement of old damaged quadraple bus conductor of Main Bus-I
line, as the this circuit can not be
186 1024 MSETCL 400KV-CHANDRAPUR-BHADRAWATI-4 C in 400KV HVDC ckt.-1 bay and 400KV GT-6 bay section span. 2)Tightening 29-Jul-21 09:00 31-Jul-21 18:00
shifted on 400KV Main Bus-2 due to
of nut bolts & hardware of Main Bus-I.
problems of PG isolators of Bus-2 .

During outage, all connected


1) For replacement of old damaged quadraple bus conductor of Main Bus-I bays/feeders of Main Bus-I will be
in 400KV HVDC ckt.-1 bay and 400KV GT-6 bay section span. 2)Tightening shifted to Main Bus-II by using the TBC-
187 1025 MSETCL 400KV/11.5KV CHANDRAPUR-GCR-ST-4 C of nut bolts & hardware of Main Bus-I. 3) Measurement of Tan delta & 29-Jul-21 09:00 31-Jul-21 18:00 I & TBC-II bay. After shifting of all
Capaciatnce of CT's bays/feeders connected to Main Bus-I
on 400KV Main Bus-II, then after the
400KV Bus Coupler bay will be kept off.
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency

During outage, all connected


bays/feeders of Main Bus-I will be
1) For replacement of old damaged quadraple bus conductor of Main Bus-I shifted to Main Bus-II by using the TBC-
188 1026 MSETCL CHANDRAPUR GCR - 400KV - BUS 1 C in 400KV HVDC ckt.-1 bay and 400KV GT-6 bay section span. 2)Tightening 29-Jul-21 09:00 31-Jul-21 18:00 I & TBC-II bay. After shifting of all
of nut bolts & hardware of Main Bus-I. bays/feeders connected to Main Bus-I
on 400KV Main Bus-II, then after the
400KV Bus Coupler bay will be kept off.

During outage, all connected


bays/feeders of Main Bus-I will be
1) For replacement of old damaged quadraple bus conductor of Main Bus-I shifted to Main Bus-II by using the TBC-
400KV-CHANDRAPUR-GCR-CHANDRAPUR
189 1027 MSETCL C in 400KV HVDC ckt.-1 bay and 400KV GT-6 bay section span. 2)Tightening 29-Jul-21 09:00 31-Jul-21 18:00 I & TBC-II bay. After shifting of all
HVDC-1
of nut bolts & hardware of Main Bus-I. bays/feeders connected to Main Bus-I
on 400KV Main Bus-II, then after the
400KV Bus Coupler bay will be kept off.

During outage, all connected


bays/feeders of Main Bus-I will be
1) For replacement of old damaged quadraple bus conductor of Main Bus-I shifted to Main Bus-II by using the TBC-
190 1028 MSETCL 400KV/21KV CHANDRAPUR-GT-6 C in 400KV HVDC ckt.-1 bay and 400KV GT-6 bay section span. 2)Tightening 29-Jul-21 09:00 31-Jul-21 18:00 I & TBC-II bay. After shifting of all
of nut bolts & hardware of Main Bus-I. bays/feeders connected to Main Bus-I
on 400KV Main Bus-II, then after the
400KV Bus Coupler bay will be kept off.

1) For dismantling of IPS tube of B-ph PG-1 Isolator required for


During this, HVDC ckt.-2 will be in
400KV-CHANDRAPUR-GCR-CHANDRAPUR replacement of old damaged quadraple bus conductor of Main Bus-I in
191 1032 MSETCL Daily 29-Jul-21 14:00 29-Jul-21 17:00 service via TBC-2 bay from Main Bus-2.
HVDC-2 400KV HVDC ckt.-1 bay and 400KV GT-6 bay section span. 2)Tightening of
nut bolts & hardware of Main Bus-I.

192 1038 MSETCL 220KV-PARLI-PARLI-M-2 Daily Line maintenance 30-Jul-21 08:00 30-Jul-21 17:00 -

1) For re connecting IPS tube of B-ph PG-1 Isolator required for


During this, HVDC ckt.-2 will be in
400KV-CHANDRAPUR-GCR-CHANDRAPUR Continuo replacement of old damaged quadraple bus conductor of Main Bus-I in
193 1052 MSETCL 31-Jul-21 09:00 31-Jul-21 18:00 service via TBC-2 bay from Main Bus-2.
HVDC-2 us 400KV HVDC ckt.-1 bay and 400KV GT-6 bay section span. 2)Tightening of
nut bolts & hardware of Main Bus-I.

Note Additional outages in the annexure 3.2 will be approved by WRLDC subjected to D-2 studies.

Additional Outages list approved in WRLDC OCCM for the Month of July' 2021
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency
400KV WARDHA-AURANGABAD-1 C For line diversion work due to samrudhi express way near 1-Jul-21 7:00 30-Jul-21 18:00 Additional Outage
1 AD1 POWERGRID_WR1 Aurangabad.(New Construction).

400KV WARDHA-AURANGABAD-2 C For line diversion work due to samrudhi express way near 1-Jul-21 7:00 30-Jul-21 18:00 Additional Outage
2 AD2 POWERGRID_WR1 Aurangabad.(New Construction).

400KV-PARLI-M-LONIKHAND-II-1 C Dismantling/de-stringing, tower erection and stringing work between 3-Jul-21 8:00 17-Jul-21 18:00 For making LILO arangement work for
span 258-259 for LILO arrangement to proposed 400kV Karjat 400kV Karjat S/s,
substation dismantling/destringing, tower erection
and stringing work is required to be
caried out between location on 258-
259 & location on 261-263
3 AD4 MSETCL
of existing 400kV Lonikand-II Girawali
line ckt-I & ckt-
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency

400KV-PARLI-M-LONIKHAND-II-2 C Dismantling/de-stringing, tower erection and stringing work between 19-Jul-21 8:00 30-Jul-21 18:00 For making LILO arangement work for
span 261-263 for LILO arrangement to proposed 400kV Karjat 400kV Karjat S/s,
substation dismantling/destringing, tower erection
and stringing work is required to be
4 AD40 MSETCL caried out between location on 258-
259 & location on 261-263
of existing 400kV Lonikand-II Girawali
line ckt-I & ckt-

5 AD45 WTPL 400KV-KOLHAPUR-MS-SOLAPUR-2 Daily For replacement of faulty insulator at tower No:118 25-Jul-21 9:00 25-Jul-21 18:00 AC TRANSMISSION LINE CIRCUIT

400KV-ALKUD-SOLAPUR-1 Daily For safety purpose AR to be disable while replacing insulators in 25-Jul-21 9:00 25-Jul-21 18:00 AR Mode OFF
6 AD46 WTPL 400 kV Kolhapur-MS-Solapur -2
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency

Outages not considered in WRLDC OCCM for the Month of July' 2021
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency
NIL
State Element List for the month of July'2021
Sr.No. Voltage Line Equipment From Date From To Date To Time Basis Reason System Agency Remark ,If any.
Time
400/220/33kV ICT-2 & ICT-3 will be in service. This
1 400 KV 400/220/33 KV 500 MVA ICT - 1 @ JEJURI 01-Jul-21 09:30 01-Jul-21 17:30 Daily Annual Testing & Maintenance work. MSETCL MSETCL outage could not be availed in May-21 due to
Loading Condition .
2 400 KV 400/220KV 315MVA ICT - 3 @ CHAKAN 01-Jul-21 09:00 01-Jul-21 17:00 Daily Diagnostic testing and maintenance activities. MSETCL MSETCL ---

(1) ICT Units Bushing and Wdg. C & Tan delta


3 400 KV 400/220/33 KV 500 MVA ICT - 3 @ PARLI 01-Jul-21 09:00 01-Jul-21 18:00 Daily MSETCL MSETCL -
measurement work. (2) Bay maintenance work.

PID testing of insulator strings.


A/R shall be kept in non auto PID of 400 kV AkolaNandgaonpeth (RPL) line shall
4 400 KV AKOLA-NANDGAONPETH (RPL-AMT) 01-Jul-21 10:00 31-Jul-21 15:00 Daily mode. PID of 400 kV AkolaNandgaonpeth (RPL) line shall MSETCL MSETCL be carried out by PID unit
be carried out by PID unit Akola
Akola.
for PID Testing Work,shifting autoreclose switch to Non for PID Testing Work,shifting autoreclose switch to
5 400 KV CHANDRAPUR 2-KUMBHARGAON(NANDED) CKT - 2 01-Jul-21 08:00 10-Jul-21 17:00 Daily MSETCL MSETCL
auto Mode Non auto Mode
MTAMC project work
6 400 KV DHULE- - BABLESHWAR - I 02-Jul-21 09:00 03-Jul-21 18:00 Continuous for retorfitting of BCU , 186, 286 relay and MFM meter MSETCL MSETCL MTAMC work
etc.
7 400 KV GTR - 9 @ CHANDRAPUR SWITCHING SS 03-Jul-21 09:00 03-Jul-21 17:00 Continuous Diagnostic testing and allied bay maintenace work MSETCL MSETCL Diagnostic testing and allied bay maintenace work
Bay Maitenance & Testing work Bay Maitenance & Testing work
8 400 KV 400/220 KV 3X200 MVA ICT - 2 @ KALWA 04-Jul-21 09:00 04-Jul-21 18:00 Daily MSETCL MSETCL
RTV coating work on open delta RTV coating work on open delta
Diagnostic Testing work . Faulty WTI & OTI replacement
9 400 KV 400/220/33KV ICT - 167 MVA SPARE ICT @LAMBOTI 05-Jul-21 10:00 05-Jul-21 18:00 Daily MSETCL MSETCL Without load interruption as it is of spare unit.
work
MTAMC project work for the retrofitting of BUS, 186 286
10 400 KV DHULE- - BABLESHWAR - II 05-Jul-21 09:00 06-Jul-21 18:00 Continuous MSETCL MSETCL MTAMC work
and MFM meter.
1. 400kV A Bus iso alignment work by Hot line unit
11 400 KV KARAD - TALANDGE CKT 2 05-Jul-21 09:00 05-Jul-21 18:00 Daily 2. Diagnostic Testing of CTs MSETCL MSETCL load will be managed on 400kV karad-Talandge ckt-1
3. QM of Bay

(1) C & Tan delta measurement of CTs. (2) Bay


12 400 KV CHANDRAPUR-PARLI CKT-3 05-Jul-21 09:00 05-Jul-21 18:00 Daily MSETCL MSETCL -
maintenance work.

13 400 KV CHANDRAPUR - KHAPERKHEDA 06-Jul-21 09:00 06-Jul-21 18:00 Daily Line maintenance work. MSETCL MSETCL NA

14 400 KV WARORA - IEPL 07-Jul-21 09:00 07-Jul-21 17:00 Daily Routine Maintenance & Dignostic testing work . MSETCL MSETCL 400 KV KORADI 2-WARDHA PGCIL Line is in ckt

15 400 KV TIE BAY (412) OF KORADI-1 @ KHAPARKHEDA 07-Jul-21 10:00 07-Jul-21 17:00 Daily Tan Delta & Capacitance of Line CVTs MSETCL MSETCL NA

Quarterly Maint. Work & Diagnostic Testing Work


16 400 KV 400/220 KV 500 MVA ICT @ ALKUD 07-Jul-21 09:00 07-Jul-21 18:00 Daily MSETCL MSETCL Outage not Availed since Dec 2020

Load will be managed on 400/220/33 KV 500 MVA


17 400 KV 400/220/33 KV 500 MVA ICT - 1 @ LAMBOTI 07-Jul-21 10:00 07-Jul-21 18:00 Daily Diagnostic Testing work MSETCL MSETCL
ICT - 2 @ LAMBOTI
Tan Delta & Capacitance of Synch. CVTs & T-connection
18 400 KV TIE BAY - 409 OF GT - 5 @KHAPARKHEDA S/s 07-Jul-21 08:00 08-Jul-21 20:00 Daily MSETCL MSETCL NA
of Bus isolator at reactor bay

19 400 KV CHANDRAPUR 2-KUMBHARGAON(NANDED) CKT - 2 07-Jul-21 08:00 07-Jul-21 18:00 Daily Line maintenance work MSETCL MSETCL Nil

MAIN BAY (403) OF CHANDRAPUR GCR CKT - 1 @


20 400 KV 07-Jul-21 09:00 07-Jul-21 16:00 Continuous Diagnostic Testing Work MSETCL MSETCL Diagnostic Testing Work
CHANDRAPUR - 2

21 400 KV 400/220/33 KV 315 MVA ICT - 1 @ WALUJ 08-Jul-21 10:00 09-Jul-21 18:00 Daily Dignostic Testing Work , PGI Overhauling work MSETCL MSETCL Dignostic Testing Work , PGI Overhauling work

400/220/33kV ICT-1 & ICT-3 will be in service.This


22 400 KV 400/220/33 KV 500 MVA ICT - 2 @ JEJURI 08-Jul-21 09:30 08-Jul-21 17:30 Daily Annual Testing & Maintenance work. MSETCL MSETCL outage could not be availed in May-21 due to
Loading Condition.
DT & Routine Maintenance Work & Replacement of REF
23 400 KV 400/220/33 KV 315 MVA ICT - 1 @ LONIKAND 08-Jul-21 09:30 08-Jul-21 17:30 Daily MSETCL MSETCL ---
Relay.
24 400 KV 400/220/33 KV 315 MVA ICT - 2 @ PARLI 08-Jul-21 09:00 08-Jul-21 18:00 Daily (1) REF & NDR Relay Testimg work & maintenance work. MSETCL MSETCL -

25 400 KV NEW KOYNA - STAGE IV CKT 1 08-Jul-21 08:00 08-Jul-21 18:00 Daily Routine maint. Work MSETCL MSETCL Planned outage

26 400 KV TBC @ KOLHAPUR(TALANDGE) 08-Jul-21 09:00 08-Jul-21 18:00 Daily QM of Bay. MSETCL MSETCL TBC is free

For Conductor & Earthwire H/W tightening work if found For Conductor & Earthwire H/W tightening work if
27 400 KV CHANDRAPUR - KHAPERKHEDA 09-Jul-21 08:00 09-Jul-21 17:00 Daily MSETCL MSETCL
any during MP found any during MP
Sr.No. Voltage Line Equipment From Date From To Date To Time Basis Reason System Agency Remark ,If any.
Time

28 400 KV NEW KOYNA - STAGE IV CKT 2 09-Jul-21 08:00 09-Jul-21 18:00 Daily Routine maint. Work MSETCL MSETCL Planned outage

29 400 KV GTR - 8 @ CHANDRAPUR SWITCHING SS 09-Jul-21 09:00 09-Jul-21 17:00 Continuous Diagnostic testing and allied bay maintenace work MSETCL MSETCL Diagnostic testing and allied bay maintenace work

30 400 KV NEW KOYNA-KARAD -CKT1 10-Jul-21 08:00 10-Jul-21 18:00 Daily Routine maint. Work MSETCL MSETCL planned outage

Bay Maitenance & Testing work Bay Maitenance & Testing work
31 400 KV 400/220/20 KV 500MVA ICT - 1 @ KALWA 11-Jul-21 09:00 11-Jul-21 18:00 Daily MSETCL MSETCL
RTV coating work on open delta RTV coating work on open delta

32 400 KV 80 MVAr BUS REACTOR - 1 @ BABHALESHWAR 11-Jul-21 09:00 11-Jul-21 18:00 Daily CT, CB relay testing work MSETCL MSETCL -

Replacement of Air cell & MOG of B phase unit and


Servicing & alignment of isolators /earth switches will be
33 400 KV 400/220/33 KV 315MVA ICT - 1 @ AKOLA 12-Jul-21 08:00 12-Jul-21 19:00 Daily MSETCL MSETCL ICT-02 will be in service
carried out by Agency and routine maintenance & testing
work.

34 400 KV 400/220/33 KV 315 MVA ICT - 2 @ WALUJ 12-Jul-21 10:00 13-Jul-21 18:00 Daily Dignostic Testing Work , PGI Overhauling work MSETCL MSETCL Dignostic Testing Work , PGI Overhauling work

35 400 KV 400/220KV 315 MVA ICT - 1 @ NEW KOYNA 12-Jul-21 08:00 12-Jul-21 18:00 Daily Routine maint. Work MSETCL MSETCL Planned outage

for PID Testing Work,shifting autoreclose switch to Non for PID Testing Work,shifting autoreclose switch to
36 400 KV CHANDRAPUR - KHAPERKHEDA 12-Jul-21 08:00 24-Jul-21 17:00 Daily MSETCL MSETCL
auto Mode Non auto Mode
For replacement of faulty insulator strings detected in MP
37 400 KV KHADKA-AURANGABAD 13-Jul-21 06:00 15-Jul-21 18:00 Daily MSETCL MSETCL NIL
& PID

For Conductor & Earthwire H/W tightening work if found For Conductor & Earthwire H/W tightening work if
38 400 KV CHANDRAPUR-PARLI CKT-3 13-Jul-21 08:00 13-Jul-21 17:00 Daily MSETCL MSETCL
any during MP found any during MP
Servicing & alignment of isolators /earth switches will be
39 400 KV 400/220/33 KV 315MVA ICT - 2 @ AKOLA 13-Jul-21 09:00 13-Jul-21 18:00 Daily carried out by Agency.and Routine maintenance & MSETCL MSETCL ICT-01 will be in service
testing work
40 400 KV NEW KOYNA-KARAD-CKT 2 13-Jul-21 08:00 13-Jul-21 18:00 Daily Routine maint. Work MSETCL MSETCL Planned outage
Servicing & alignment of isolators /earth switches will be
41 400 KV AKOLA - KHADKA (BHUSAWAL) 14-Jul-21 09:00 14-Jul-21 18:00 Daily carried out by Agency and Routine maintenance & MSETCL MSETCL Nandgaon Ckt will be in service
testing work
42 400 KV CHANDRAPUR 2- KUMBHARGAON (NANDED) CKT - 1 14-Jul-21 09:00 14-Jul-21 16:00 Continuous Diagnostic Testing Work MSETCL MSETCL Diagnostic Testing Work
For Conductor & Earthwire H/W tightening work if found For Conductor & Earthwire H/W tightening work if
43 400 KV CHANDRAPUR 2-KUMBHARGAON(NANDED) CKT - 2 14-Jul-21 08:00 14-Jul-21 17:00 Daily MSETCL MSETCL
any during MP found any during MP
44 400 KV JAIGAD-NEW KOYNA-I 14-Jul-21 08:00 14-Jul-21 18:00 Daily Routine maint. Work MSETCL MSETCL Planned outage

45 400 KV MAIN BAY (411) OF KORADI-1 @ KHAPARKHEDA 14-Jul-21 10:00 14-Jul-21 17:00 Daily Tan Delta & Capacitance of Line CVTs MSETCL MSETCL NA
Load will be managed on 400/220/33 KV 500 MVA
46 400 KV 400/220/33 KV 500 MVA ICT - 2 @ LAMBOTI 14-Jul-21 10:00 14-Jul-21 18:00 Daily Diagnostic testing work MSETCL MSETCL
ICT - 1 @ LAMBOTI
Line will be shifted on TBC & 400 kV Bus reactor
47 400 KV KORADI-KHAPERKHEDA I 14-Jul-21 09:00 14-Jul-21 17:00 Daily CB timing, DCRM,CRM testing work MSETCL MSETCL
need to be taken out while shifting on TBC
Routine maintainance and DCRM/CRM/CB Timings only Tie CB 418 is in OFF condition ,respective ckt
48 400 KV TIE BAY (418) OF IEPL AND FUTURE LINE-1 @ WARORA 14-Jul-21 09:00 14-Jul-21 17:00 Daily MSETCL MSETCL
Testing works and isolater maintainance work . charged through its own main CB.
49 132 KV KANHAN-MANSAR 14-Jul-21 09:00 14-Jul-21 17:00 Daily Routine Maintenance work. MSETCL MSETCL NA
Servicing & alignment of isolators /earth switches will be
50 400 KV AKOLA-NANDGAONPETH (RPL-AMT) 15-Jul-21 09:00 15-Jul-21 18:00 Daily carried out by Agency and Routine maintenance & MSETCL MSETCL Bhusawal ckt will be in service
testing work
For Conductor & Earthwire H/W tightening work if found For Conductor & Earthwire H/W tightening work if
51 400 KV CHANDRAPUR 2- KUMBHARGAON (NANDED) CKT - 1 15-Jul-21 08:00 15-Jul-21 17:00 Daily MSETCL MSETCL
any during MP found any during MP

52 400 KV JAIGAD-NEW KOYNA-II 15-Jul-21 08:00 15-Jul-21 18:00 Daily Routine maint. Work MSETCL MSETCL Planned outage
Sr.No. Voltage Line Equipment From Date From To Date To Time Basis Reason System Agency Remark ,If any.
Time
400/220/33kV ICT-1 & ICT-2 will be in service. This
53 400 KV 400/220/33 KV 500 MVA ICT - 3 @ JEJURI 15-Jul-21 09:30 15-Jul-21 17:30 Daily Annual Testing & Maintenance work. MSETCL MSETCL outage could not be availed in May- 21 due to
loading condition.
54 400 KV 400/220/33 KV 500MVA ICT - 2 @ LONIKAND 2 15-Jul-21 09:00 15-Jul-21 18:00 Daily Half yearly maintenance and diagnostic testing. MSETCL MSETCL 400/220kV 501 MVA ICT-I will remain in service
DT & Routine Maintenance Work/ DT & Insulator String
55 400 KV LONIKAND 1 -JEJURI 15-Jul-21 09:30 15-Jul-21 17:30 Daily MSETCL MSETCL ---
replacement Work.

56 400 KV 400/220KV 315 MVA ICT - 2 @ NEW KOYNA 16-Jul-21 08:00 16-Jul-21 18:00 Daily Routine maint. Work MSETCL MSETCL Planned outage

57 400 KV 400/220/33 KV 315 MVA ICT - 1 @ DHULE 16-Jul-21 08:00 16-Jul-21 18:00 Daily Routine Testing & Maint work MSETCL MSETCL Routine Testing & Maint work

58 400 KV GTR - 9 @ CHANDRAPUR SWITCHING SS 16-Jul-21 09:00 16-Jul-21 17:00 Continuous Diagnostic testing and allied bay maintenace work MSETCL MSETCL Diagnostic testing and allied bay maintenace work

59 400 KV 400/220/33 KV 500 MVA ICT - 3 @ WALUJ 16-Jul-21 10:00 17-Jul-21 18:00 Daily Diagnostic Testing Work , PGI Overhauling work MSETCL MSETCL Diagnostic Testing Work , PGI Overhauling work
Routine maintainance and Line/Bus/Tie CT TAN 400KV PGCIL Line will be charged through main
60 400 KV 400 KV FUTURE BAY II @ WARORA 16-Jul-21 09:00 16-Jul-21 17:00 Daily MSETCL MSETCL
DELTA,IR and isolater maintainance work etc . CB 420.
61 400 KV 400/220/33 KV 501MVA ICT - 4 @ BABHALESHWAR 18-Jul-21 08:00 18-Jul-21 18:00 Daily Bushing, CT,CB Diagnostic testing MSETCL MSETCL ICT 1, 2, 3 will be in service
1. QM of Bay Load will be managed on 400kV Karad-Talandge
62 400 KV KARAD - TALANDGE CKT 1 19-Jul-21 09:00 19-Jul-21 18:00 Daily MSETCL MSETCL
2. C & tan delta testing of CTs & CVTs ckt -2
Fro replacement of faulty insulator strings detected in MP
63 400 KV KHADKA - BABLESHWAR 20-Jul-21 06:00 22-Jul-21 18:00 Daily MSETCL MSETCL NIL
& PID
Quarterly Maint. Work & Diagnostic Testing Work
64 400 KV 125 MVAr BUS REACTOR @ ALKUD 21-Jul-21 09:00 21-Jul-21 18:00 Daily MSETCL MSETCL Outage Required

65 400 KV CHANDRAPUR 2 - DHARIWAL CKT - 1 21-Jul-21 09:00 21-Jul-21 16:00 Continuous Diagnostic Testing Work MSETCL MSETCL Diagnostic Testing Work

66 400 KV JEJURI- KOYNA STAGE-IV 22-Jul-21 09:30 22-Jul-21 17:30 Daily DT & Insulator String replacement Work. MSETCL MSETCL ---

DT & Routine Maintenance Work & Replacement of REF


67 400 KV 400/220/33KV 315MVA ICT - 2 @ LONIKAND 22-Jul-21 09:00 22-Jul-21 18:30 Daily MSETCL MSETCL ---
& Master Relay.

1)Measurement of CRM, Timing & DCRM of Circuit During this, GTR-5 bay will be in will service via
68 400 KV GTR - 5 @ CHANDRAPUR SS 22-Jul-21 09:00 22-Jul-21 18:00 Continuous Breaker. 2) Maintenance and alignments of PG-1 & 2 MSETCL MSETCL TBC-2 bay.
Isolators
69 400 KV 400/220KV 500MVA ICT 2 AT 400KV DHULE S/S 23-Jul-21 08:00 23-Jul-21 18:00 Daily Routine Testing & Maint work MSETCL MSETCL Routine Testing & Maint work

70 400 KV GTR - 8 @ CHANDRAPUR SWITCHING SS 23-Jul-21 09:00 23-Jul-21 17:00 Continuous Diagnostic testing and allied bay maintenace work MSETCL MSETCL Diagnostic testing and allied bay maintenace work
During outage, 400KV CHD_2 Ckt. No- 1 & 2,
1) Measurement of Tan delta & capacitance of 400KV
400KV Khaparakheda ckt, 400KV PGCIL Ckt. - 1,
71 400 KV CHANDRAPUR-PARLI CKT-3 24-Jul-21 09:00 24-Jul-21 18:00 Continuous R, Y & B-ph CTs which are due since 02 years. 2) MSETCL MSETCL
2, 3 and 4 will be in service.
Maintenance and alignments of PG Isolators and CB
72 400 KV 400/220/33 KV 500 MVA ICT - 3 @ DHULE 24-Jul-21 08:00 24-Jul-21 18:00 Daily Routine Testing & Maint work MSETCL MSETCL Routine Testing & Maint work

73 400 KV TBC @ BABHALESHWAR 25-Jul-21 08:00 25-Jul-21 18:00 Daily CT,CB Diagnostic testing, Relay testing MSETCL MSETCL -

Routine maintainance and Line/Bus/Tie CT TAN Bay No 404 charged upto line CT (400KV
74 400 KV 400/220/33 KV 500MVA ICT - 1 @ WARORA 26-Jul-21 08:00 26-Jul-21 17:00 Daily MSETCL MSETCL
DELTA,IR and isolater maintainance work etc . ICT No -1 handed over to 400kv Bableshwar )
1) Measurement of Tan delta & capacitance of 400KV During outage, 400KV CHD_2 Ckt. No- 1 & 2,
R, Y & B-ph CTs which are due since 02 years. 2) 400KV Parli ckt-3, 400KV PGCIL Ckt. - 1, 2, 3 and
75 400 KV CHANDRAPUR - KHAPERKHEDA 26-Jul-21 09:00 26-Jul-21 18:00 Continuous MSETCL MSETCL
Maintenance and alignments of PG Isolators and CB 4 will be in service.
Isolators.

76 400 KV 125 MVAr BUS REACTOR @ TALANDGE 28-Jul-21 09:00 28-Jul-21 18:00 Daily Dignostic testing of reactor bushings, Wdg & CTs MSETCL MSETCL 80MVAR reactor is ready to charge/ in service

Outages will be availed subject to weather


77 400 KV KORADI-KHAPERKHEDA II 28-Jul-21 10:00 28-Jul-21 17:00 Daily For CVT tan delta testing MSETCL MSETCL
conditions.
During outage, all connected bays/feeders of Main
1) For replacement of old damaged quadraple bus Bus-I will be shifted to Main Bus-II by using the
conductor of Main Bus-I in 400KV HVDC ckt.-1 bay and TBC-I & TBC-II bay. After shifting of all
78 400 KV GTR - 6 @ CHANDRAPUR 29-Jul-21 09:00 31-Jul-21 18:00 Continuous MSETCL MSETCL
400KV GT-6 bay section span. 2)Tightening of nut bolts bays/feeders connected to Main Bus-I on 400KV
& hardware of Main Bus-I. Main Bus-II, then after the 400KV Bus Coupler bay
will be kept off.
Required to free the TBC-2 bay and shifting of
For re connecting the IPS tube of HVDC ckt. -2
79 400 KV GTR - 6 @ CHANDRAPUR 31-Jul-21 18:00 31-Jul-21 20:00 Continuous MSETCL MSETCL HVDC ckt.2 on TBC-2 bay re connecting IPS tube.

You might also like