Professional Documents
Culture Documents
Monthly Outage List Approved in WRLDC OCCM For The Month of July' 2021
Monthly Outage List Approved in WRLDC OCCM For The Month of July' 2021
Monthly Outage List Approved in WRLDC OCCM For The Month of July' 2021
Monthly Outage list approved in WRLDC OCCM for the Month of July' 2021
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency
5 37 MSETCL 400KV-RGPPL-NEW KOYNA-2 Daily Faulty string replacement Work, Hill cutting work at loc. No.94-94 1-Jul-21 08:00 3-Jul-21 18:00 Planned outage
6 41 MSETCL 400KV-BABLESHWAR-PADGHE-1 Daily For Carrying PID Work 1-Jul-21 08:00 15-Jul-21 18:00 -
Continuo
10 72 MSETCL BABLESHWAR - 400KV B/R 1 400kV CGL make CB pole overhauling work 1-Jul-21 09:00 10-Jul-21 18:00 400kV Reactor I on TBC
us
14 102 POWERGRID_WR1 400KV-KORADI-BHILAI L/R@ KORADI - 400KV D For AMP of Reactor Bay 2-Jul-21 08:00 2-Jul-21 18:00
Continuo
15 114 MSETCL 400KV-WARORA-CHANDRAPU-II-1 Diagnostic Testing Work 2-Jul-21 09:00 2-Jul-21 16:00 Diagnostic Testing Work
us
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency
19 130 POWERGRID_WR2 220KV-BOISAR-BORIVALI D For AMP works of line terminal equipments. Line outage is required. 2-Jul-21 09:00 2-Jul-21 17:30 PG-WR2-Boisar
20 140 MSETCL 400KV-DHULE-MS-BABLESHWAR-2 Daily Online PID testing work 3-Jul-21 08:00 14-Jul-21 17:00 Line to be kept on Nonauto mode.
21 146 POWERGRID_WR1 220KV-TALEGAON-PUNE-PG-1 D For cleaning of contacts 3-Jul-21 8:30 3-Jul-21 18:00
22 152 POWERGRID_WR2 220KV-BOISAR-BOISAR-M-2 D For AMP works of line terminal equipments. Line outage is required. 3-Jul-21 8:30 3-Jul-21 17:30 PG-WR2-Boisar
1) Measurement of Tan delta & capacitance of 400KV R, Y & B-ph CTs During outage, HVDC Ckt. No.- 1 Will
400KV-CHANDRAPUR-GCR-CHANDRAPUR
23 153 MSETCL Daily which are due since 02 years. 2) Testing of LBB relay. 3) Maintenance and 3-Jul-21 09:00 3-Jul-21 18:00 be in service and there will be power
HVDC-2
alignments of PG Isolators and CB Isolators. restriction.
25 160 MSETCL 220KV-TALEGAON-PUNE-PG-1 Daily Half yearly maintenence , Diagnostic Testing. 3-Jul-21 10:00 3-Jul-21 17:00 ---
26 172 POWERGRID_WR1 400KV-KALWA-PUNE-PG-1 D Rectification of condcutor unwind problem and relay testing works. 4-Jul-21 8:30 4-Jul-21 18:00
28 175 MSETCL 400KV-PARLI-M-LONIKHAND-II-1 Daily DT & Chemical cleaning Work. 4-Jul-21 09:30 4-Jul-21 17:30 ---
For erection of inline Monopole PD+6 & stringing of IEPL Ckt & charging
30 182 MSETCL 400KV-IEPL-KORADI-II-1 C of IEPL Ckt on diverted route at Chainage - 23+650, between existing 5-Jul-21 6:00 11-Jul-21 22:00
tower no. 192 & 193 on D/C Ckt.
31 188 MSETCL 400KV-RGPPL-NEW KOYNA-1 Daily Routine maint. Work 5-Jul-21 08:00 5-Jul-21 18:00 Planned outage
32 200 MSETCL 400KV-DHULE-MS-BABLESHWAR-1 Daily Online PID testing 5-Jul-21 08:00 15-Jul-21 17:00 Line to be kept on Nonauto mode
34 205 POWERGRID_WR1 220KV-PARLI-PARLI-M-2 D For AMP of line terminal equipments 5-Jul-21 8:30 5-Jul-21 17:30
36 249 POWERGRID_WR1 AURANGABAD - 400KV - BUS 1 D FOR AMP Works 6-Jul-21 7:00 6-Jul-21 18:00
37 250 POWERGRID_WR1 400KV-KOLHAPUR-MS-SOLAPUR-2 D For Checking of CVT and relay testing works 6-Jul-21 7:00 6-Jul-21 18:00
38 259 MSETCL 400KV-RGPPL-NAGOTHANE-1 Daily Routine Maint. Work 6-Jul-21 08:00 6-Jul-21 18:00 Planned outage
39 260 MSETCL 220KV-WARDHA-BHUGAON-1 Daily Routine line maintainace work 6-Jul-21 08:00 6-Jul-21 18:00 NA
TIE BAY - 400KV-KOLHAPUR-MS-KOLHAPUR
40 276 POWERGRID_WR1 D Bay AMP 6-Jul-21 8:30 6-Jul-21 18:00
GIS-1 AND FUTURE at Kolhapur GIS - 400KV
For safety purpose Auto Reclosure to be kept in OFF mode for 220KV-
42 281 WTPL 220KV-SOLAPUR-JEUR-1 Daily 6-Jul-21 9:00 6-Jul-21 17:00 AR Mode OFF
SOLAPUR-JEUR-1
43 301 POWERGRID_WR1 220KV-SOLAPUR-JEUR-1 D Line side equipments AMP 7-Jul-21 8:30 7-Jul-21 18:00
46 317 MSETCL 400KV-RGPPL-NAGOTHANE-2 Daily Routine Maint. Work 7-Jul-21 08:00 7-Jul-21 18:00 Planned outage
48 332 MSETCL KHAPARKHEDA - 400KV - BUS 2 Daily T-connection of Bus isolator at reactor bay 7-Jul-21 08:00 7-Jul-21 20:00 NA
49 334 POWERGRID_WR1 PARLI - 220KV - BUS 1 D For Bus AMP 7-Jul-21 8:30 7-Jul-21 17:30
TIE BAY - 400KV-CHAKAN-PUNE-PG-1 AND
50 341 POWERGRID_WR1 400KV-KHARGHAR-PUNE-PG-1 at PUNE-PG - D For AMP Work 7-Jul-21 8:30 7-Jul-21 18:00
400KV
Replacement of faulty Polymer insulator strings at tower No: 9, 154 and
51 344 WTPL 220KV-SOLAPUR-JEUR-1 Daily 7-Jul-21 9:00 7-Jul-21 17:00 Outage
247 and other line maintenance activities
For safety purpose Auto Reclosure to be kept in OFF mode for 400KV-
52 345 WTPL 400KV-SOLAPUR-M-SOLAPUR-1 Daily 7-Jul-21 9:00 7-Jul-21 17:00 AR Mode OFF
SOLAPUR-M-SOLAPUR-1 (Solapur - Lamboti Line)
53 346 MSETCL 132KV-PENCH-KANHAN-1 Daily Routine Maintenance work. 7-Jul-21 09:00 7-Jul-21 17:00 NA
54 348 POWERGRID_WR2 220KV-BOISAR-TARAPUR D For AMP works of line terminal equipments. Line outage is required. 7-Jul-21 9:00 7-Jul-21 17:30 PG-WR2-Boisar
MAIN BAY - 765KV-TIRODA-KORADI-III-1 AND Continuo For attending the SF6 gas leakage in
55 355 APML For attending the SF6 gas leakage in Circuit Breaker 7-Jul-21 09:00 10-Jul-21 18:00
TIRODA - 765KV - BUS 2 us Circuit Breaker
1) Complete servicing and overhauling of Mechanism Drive, SF6 gas During outage, HVDC Ckt. No.- 1 Will
400KV-CHANDRAPUR-GCR-CHANDRAPUR Continuo monitoring assembly, pump assembly, Poles and Interrupter of all 03 be in service via TBC-2 bay and there
56 356 MSETCL 7-Jul-21 09:00 16-Jul-21 18:00
HVDC-1 us phases and attending the SF6 gas leakage problem of R-ph pole. will not be power restriction.
2)Measurement of CRM, Timing & DCRM of Circuit Breaker.
57 360 MSETCL SOLAPUR - 220KV - BUS 1 Daily Outage is required for Quarterly Maintenance 7-Jul-21 10:00 7-Jul-21 16:00 Quarterly Maintenance
58 361 MSETCL 220KV-SOLAPUR-KUMBARI-1 Daily Outage is required for Quarterly Maintenance 7-Jul-21 10:00 7-Jul-21 16:00 Quarterly Maintenance
59 363 MSETCL 220KV-WARDHA-BADNERA-1 Daily Routine line maintainance work 7-Jul-21 10:00 7-Jul-21 18:00 NA
62 377 MSETCL 400KV-CHAKAN-PUNE-PG-1 Daily Routine Line Maintenance work. 8-Jul-21 08:00 8-Jul-21 18:00 ---
400kV SSNNL-1 A/R switch will be kept
63 378 MSETCL 400KV-SSP-DHULE-MS-2 Daily Routine maint. work 8-Jul-21 08:00 8-Jul-21 18:00
on non auto mode
Continuo 400kv TBC CGL make CB overhauling &
64 385 MSETCL DHULE-MS - 400KV - TRANSFER BUS 1 400kv TBC CGL make CB overhauling & MTAMC work 8-Jul-21 08:00 10-Jul-21 18:00
us MTAMC work
MAIN BAY - 400KV-KOLHAPUR-MS-
65 392 POWERGRID_WR1 KOLHAPUR GIS-2 AND KOLHAPUR GIS - D Bay AMP 8-Jul-21 8:30 8-Jul-21 18:00
400KV - BUS 1 at Kolhapur GIS - 400KV
67 407 MSETCL 400KV-PARLI-M-SOLAPUR-M-1 Daily Hardware Tightening and Fitting Work. 8-Jul-21 09:30 8-Jul-21 18:30 -
68 413 MSETCL 400KV-WARDHA-WARORA-1 Daily Routine Maintenance & Dignostic testing work . 9-Jul-21 09:00 9-Jul-21 17:00 400KV WARORA-IEPL Line is in ckt
69 421 MSETCL 220KV-PARLI-OSMANABAD-M-1 Daily Line maintenance 9-Jul-21 08:00 9-Jul-21 17:00 -
71 424 MSETCL 220KV-WARDHA-PUSAD-1 Daily Routine line maintainace work 9-Jul-21 08:00 9-Jul-21 18:00 NA
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency
77 462 POWERGRID_WR1 220KV-TALEGAON-PUNE-PG-2 D For cleaning of contacts 10-Jul-21 8:30 10-Jul-21 18:00
82 488 MSETCL 400KV-WARDHA-KORADI-II-1 Daily Routine Maintenance & Dignostic testing work . 11-Jul-21 09:00 11-Jul-21 17:00 400 KV WARORA - DEOLI 2 Line is in ckt
85 495 POWERGRID_WR1 AURANGABAD - 400KV - BUS 2 D FOR AMP Works 12-Jul-21 7:00 12-Jul-21 18:00
BUS COUPLER BAY - BABLESHWAR - 400KV -
86 499 MSETCL BUS 1 AND BABLESHWAR - 400KV - BUS 2 at Daily Diagnostic Testing CT CB 12-Jul-21 08:00 12-Jul-21 18:00 400KV Bus 1 & 2 seperated
BABLESHWAR - 400KV
87 500 MSETCL 220KV-WARDHA-BHUGAON-1 Daily Routine line maintainace work 12-Jul-21 08:00 12-Jul-21 18:00 NA
BUS COUPLER BAY OF DHULE - 400KV - BUS
Continuo 400kv BC CGL make CB overhauling &
88 508 MSETCL 1 AND DHULE - 400KV - BUS 2 @DHULE - 400kv BC CGL make CB overhauling & MTAMC work 12-Jul-21 08:00 14-Jul-21 18:00
us MTAMC work
400KV at DHULE - 400KV
Quarterly maint. Of bay equipments & Half yearly maint. Of 220 kV Bus
90 525 MSETCL 220KV-MUDSHINGI-CHIKKODI-II-1 Daily 12-Jul-21 9:00 12-Jul-21 18:00
Secton II & III.
Quarterly maint. Of bay equipments & Half yearly maint. Of 220 kV Bus
91 526 MSETCL 220KV-MUDSHINGI-CHIKKODI-II-1 Daily 12-Jul-21 9:00 12-Jul-21 18:00
Secton II & III.
MAIN BAY - 765KV-TIRODA-KORADI-III-2 AND Continuo For attending the SF6 gas leakage in
92 535 APML For attending the SF6 gas leakage in Circuit Breaker 12-Jul-21 09:00 14-Jul-21 18:00
TIRODA - 765KV - BUS 2 us Circuit Breaker
1.Replacement of
a. 400kV TBC B bus B ph isolator
b. 400kV Solapur Bay B bus R ph isolator
2. Annual Maintenance of Main Bus 2. All 400kV Bays should be shifted online
93 538 MSETCL KOLHAPUR-MS - 400KV - BUS 2 C 12-Jul-21 09:00 17-Jul-21 18:00
3. Alignment of all 400kV B bus isolators by online shifting one by one bay on 400kV Main Bus 1
on TBC.
4. C & tan delta testing of B bus CVT.
5. Chemical cleaning of Bus Strings.
95 566 POWERGRID_WR1 400KV-PARLI-SOLAPUR-1 D For AMP of line terminal equipments and relay testing works. 13-Jul-21 8:30 13-Jul-21 17:30
98 592 MSETCL 220KV-AURANGABAD-CHITEGAON-2 Daily Breaker CRM & timing measurement work. 13-Jul-21 11:00 13-Jul-21 16:00 The line will be in service
For erection of DD+3 Inline Monopole & DD+0 inline Monopole & stringing
102 635 MSETCL 400KV-WARDHA-KORADI-II-1 C on diverted route at Ch. 27 + 650, between existing tower no. 202 & 203 15-Jul-21 6:00 20-Jul-21 22:00
on existing 400KV D/C line.
For erection of DD+3 Inline Monopole & DD+0 inline Monopole & stringing
103 636 MSETCL 400KV-IEPL-KORADI-II-1 C on diverted route at Ch. 27 + 650, between existing tower no. 202 & 203 15-Jul-21 6:00 20-Jul-21 22:00
on existing 400KV D/C line.
106 659 MSETCL 400KV-PARLI-M-PARLI-2 Daily (1) C & Tan delta measurement of CVTs. (2) Bay maintenance work. 15-Jul-21 09:00 15-Jul-21 18:00 -
TIE BAY OF 765KV/21KV TIRODA-GT-4 AND For attending the SF6 gas leakage in
Continuo For attending the SF6 gas leakage in Circuit Breaker (702 TIE BAY at
107 666 APML 765KV/400KV TIRODA-ICT-1 @TIRODA - 15-Jul-21 09:00 17-Jul-21 18:00 Circuit Breaker (702 TIE BAY at TIRODA
us TIRODA - 765KV)
765KV - 765KV)
108 674 POWERGRID_WR2 220KV-BOISAR-BOISAR-M-1 D For AMP works of line terminal equipments. Line outage is required. 16-Jul-21 9:00 16-Jul-21 17:30 PG-WR2-Boisar
114 720 POWERGRID_WR1 400KV-KHARGHAR-PUNE-PG-1 D For Checking of CVT and relay testing works 17-Jul-21 8:30 17-Jul-21 18:00
117 729 MP_SLDC 400KV-SSP-RAJGARH-2 D FOR LINE MAINTENANCE WORK 17-Jul-21 8:00 17-Jul-21 18:00
118 730 MP_SLDC 400KV Main Bus-I at 400KV S/s Indira Sagar D RELAY TESTING WORK BY SERVICE ENGINEER 17-Jul-21 8:00 17-Jul-21 18:00
400KV-WARDHA-WARORA-PG-2 L/R@
119 731 POWERGRID_WR1 D For AMP of Reactor Bay 17-Jul-21 8:00 17-Jul-21 18:00
WARDHA - 400KV
For AMP of line terminal equipments, relay testing works. AR to be kept in
120 734 POWERGRID_WR1 400KV-PARLI-M-PARLI-2 D 17-Jul-21 8:30 17-Jul-21 17:30
non Auto mode for 400kV Parli-Parli-I
121 738 MSETCL 220KV-TARAPUR 1&2-BORIVALI-1 Daily FIXING OF MISSING SPACERS 17-Jul-21 09:00 17-Jul-21 17:00 FIXING OF MISSING SPACERS
1) Measurement of Tan delta & capacitance of 400KV R, Y & B-ph CTs During outage, HVDC Ckt. No.- 2 Will
400KV-CHANDRAPUR-GCR-CHANDRAPUR which are due since 02 years. 2) Maintenance and alignments of PG be in service and there will be power
122 739 MSETCL Daily 17-Jul-21 09:00 17-Jul-21 18:00
HVDC-1 Isolators and CB Isolators. restriction.
123 747 POWERGRID_WR1 400KV-ALKUD-SOLAPUR-1 D Line Equipment AMP Works 18-Jul-21 7:00 18-Jul-21 18:00
400kV-SOLAPUR-ALKUD LR@ SOLAPUR-
124 748 POWERGRID_WR1 D Line Reactor AMP Works 18-Jul-21 7:00 18-Jul-21 18:00
400KV
125 751 MSETCL 400KV-PARLI-M-LONIKHAND-II-1 Daily Hardware Tightening and Fitting Work. 18-Jul-21 09:30 18-Jul-21 18:30 -
Insulator replacement work in Anand
126 753 MSETCL 400KV-KALWA-PADGHE-1 Daily Insulator replacement work in Anand Nagar MIDC area 18-Jul-21 08:00 18-Jul-21 18:00
Nagar MIDC area
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency
129 763 MSETCL 220KV-WARDHA-PUSAD-1 Daily Routine line maintainace work 19-Jul-21 08:00 19-Jul-21 18:00 NA
MAIN BAY - 400KV-WARDHA-WARORA-1 AND Attending of SF6 gas leakage at top of the Y-Phase pole of 429 Main CB at Line will be charged through Tie CB
130 776 MSETCL Daily 19-Jul-21 09:00 19-Jul-21 17:00
WARDHA - 400KV - BUS 2 400 KV PGCIL Deoli S/Stn. By complete O/H of Y-Pole. 428.
MAIN BAY - TIRODA - 765KV B/R 1 AND Continuo For attending the SF6 gas leakage in
131 789 APML For attending the SF6 gas leakage in Circuit Breaker 19-Jul-21 09:00 20-Jul-21 18:00
TIRODA - 765KV - BUS 1 us Circuit Breaker
Outage not availed Since last five
132 794 MSETCL 400KV-KOLHAPUR-MS-ALKUD-1 Daily Quarterly Maintenance & Diagnostic testing work 20-Jul-21 09:00 20-Jul-21 18:00
Months
133 795 MSETCL ALKUD - 400KV - BUS 1 Daily Quarterly Maintenance & Diagnostic Testing Work 20-Jul-21 09:00 20-Jul-21 18:00 Outage not availed since Dec 2020
134 811 POWERGRID_WR1 220KV-PARLI-PARLI-M-1 D For AMP of line terminal equipments 20-Jul-21 8:30 20-Jul-21 17:30
136 829 MSETCL 220KV-WARDHA-WARDHA-M-1 Daily Routine line maintainace work 20-Jul-21 10:00 20-Jul-21 18:00 NA
T-Connection of Bus isolator of Reactor bay For 400kV, 125 MVAR Bus
137 836 MSETCL KORADI-II - 400KV - BUS 2 Daily 21-Jul-21 8:00 22-Jul-21 20:00
Shunt Reactor (bay no. 415).
TIE BAY - 400KV/20KV KORADI-II-GT-9 AND T-Connection of Bus isolator of Reactor bay For 400kV, 125 MVAR Bus
138 837 MSETCL Daily 21-Jul-21 8:00 22-Jul-21 20:00
FUTURE at KORADI-II - 400KV Shunt Reactor (bay no. 415).
400kV Ektuni ckt I,400kV Bhusawal,
139 840 MSETCL 400KV-EKTUNI-BABLESHWAR-2 Daily 29D & 29C Isolator repairing work. 21-Jul-21 09:00 21-Jul-21 17:00 Dhule I&II and 400kV Aurangabad will
be in in service
140 841 MSETCL 132KV-PENCH-MANSAR-1 Daily Routine Maintenance work. 21-Jul-21 09:00 21-Jul-21 17:00 NA
765KV-TIRODA-KORADI-III-1 L/R@ TIRODA - Continuo For attending the SF6 gas leakage in
141 846 APML For attending the SF6 gas leakage in Circuit Breaker 21-Jul-21 09:00 23-Jul-21 18:00
765KV us Circuit Breaker
142 851 MSETCL KHAPARKHEDA - 400KV - BUS 1 Daily Centre Break Bus Isolator Maintenance Work 21-Jul-21 10:00 21-Jul-21 18:00 NA
Replacement of BUS-2 Pantograph isolators of PGCIL ckt-1 and PGCIL ckt-2
143 853 POWERGRID_WR1 CHANDRAPUR-GCR - 400KV - BUS 2 C 22-Jul-21 8:00 25-Jul-21 18:00
at GCR
146 856 MSETCL 220KV-WARDHA-PUSAD-1 Daily For Routine Maintenance Work 22-Jul-21 07:00 22-Jul-21 18:00 Nil
MAIN BAY - DHULE-MS - 400KV B/R 1 AND
147 857 POWERGRID_WR1 DHULE-MS - 400KV - BUS 1 at DHULE-MS - D FOR AMP WORKS 22-Jul-21 7:00 22-Jul-21 18:00
400KV
148 865 POWERGRID_WR1 220KV-PARLI-OSMANABAD-M-1 D For AMP of line terminal equipments 22-Jul-21 8:30 22-Jul-21 17:30
149 873 POWERGRID_WR2 765KV/400KV VADODARA-ICT-1 D For swapping of Spare unit with main unit. Dia will be open on both sides. 22-Jul-21 9:00 22-Jul-21 12:00 PG-WR2-Vadodara
151 875 MP_SLDC 220KV-PANDHURNA-MP-KALMESHWAR-MH D FOR LINE MAINTENANCE WORK 22-Jul-21 9:00 22-Jul-21 18:00
152 887 POWERGRID_WR2 220KV-BOISAR-BOISAR-M-3 D For AMP works of line terminal equipments. Line outage is required. 23-Jul-21 9:00 23-Jul-21 17:30 PG-WR2-Boisar
For shifting 400KV Warora-IEPL Ckt on ERS at ch. No. 27 + 400 between
153 889 MSETCL 400KV-IEPL-WARORA-1 Daily 23-Jul-21 6:00 23-Jul-21 22:00
existing tower no. 1A to 3A on this D/C ckt line.
154 891 POWERGRID_WR1 400KV-AURANGABAD-M (WALUJ)-PUNE-PG-1 D FOR LINE CT AMP WORKS 23-Jul-21 7:00 23-Jul-21 18:00
155 892 MSETCL 220KV-PARLI-PARLI-M-2 Daily Line maintenance 23-Jul-21 08:00 23-Jul-21 17:00 -
continuou For erection of PB+0 & PD+9 Inline Monopoles & stringing of 400KV
156 917 MSETCL 400KV-IEPL-KORADI-II-1 24-Jul-21 6:00 27-Jul-21 22:00
s Koradi-II - IEPL Ckt on diverted route between existing tower no. 2A & 3A
For Khandwa-1 LR & Line CT AMP. AR to be kept in non mode for Ckt-2
157 920 POWERGRID_WR1 400KV-KHANDWA-DHULE-MS-1 D 24-Jul-21 7:00 24-Jul-21 18:00
during the outage
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency
161 931 MSETCL 220KV-TARAPUR 1&2-BOISAR-M-1 Daily REPLACEMENT OF INSULATOR STRING 24-Jul-21 09:00 24-Jul-21 17:00 REPLACEMENT OF INSULATOR STRING
MAIN BAY - 765KV/400KV TIRODA-ICT-1 AND Continuo For attending the SF6 gas leakage in
162 934 APML For attending the SF6 gas leakage in Circuit Breaker 24-Jul-21 09:00 27-Jul-21 18:00
TIRODA - 400KV - BUS 2 us Circuit Breaker
For Khandwa-2 LR & Line CT AMP. AR to be kept in non mode for Ckt-2
164 939 POWERGRID_WR1 400KV-KHANDWA-DHULE-MS-2 D 26-Jul-21 7:00 26-Jul-21 18:00
during the outage
165 947 POWERGRID_WR1 220KV-WARDHA-PUSAD-1 D For AMP of Line Bay 26-Jul-21 8:00 26-Jul-21 18:00
168 954 GETCO 220KV-NASIK-NAVSARI-2 Daily maintenance work 26-Jul-21 9:00 26-Jul-21 18:00
BUS COUPLER BAY - PARLI-M - 400KV - BUS
169 955 MSETCL 1 AND PARLI-M - 400KV - BUS 2 at PARLI-M - Daily (1) LBB & Backup relay testing work. (2)Bay maintenance work. 26-Jul-21 09:00 26-Jul-21 18:00 -
400KV
170 982 MSETCL 400KV-KORADI-II-KORADI-III-2 Daily Line maintenance work. 27-Jul-21 09:00 27-Jul-21 18:00 NA
Commissioning bus bar relay of Main 417 bay & Spare ICT and servicing
171 983 MSETCL AKOLA - 400KV - BUS 2 Daily & alignment of isolators /earth switches will be carried out by Agency and 27-Jul-21 09:00 27-Jul-21 19:00 Bus-01 will be in service
Routine maintenance & testing work
172 985 MSETCL 400KV-KORADI-II-KORADI-III-1 Daily Line maintenance work. 28-Jul-21 09:00 28-Jul-21 18:00 NA
173 986 MSETCL 400KV-IEPL-WARORA-1 Daily To disconnect 400KV Warora -IEPL from ERS & charging on diverted route. 28-Jul-21 6:00 28-Jul-21 22:00
174 988 POWERGRID_WR1 400KV-AURANGABAD-M (WALUJ)-PUNE-PG-2 D FOR LINE CT AMP WORKS 28-Jul-21 7:00 28-Jul-21 18:00
765KV-TIRODA-KORADI-III-2 L/R@ TIRODA - Continuo For attending the SF6 gas leakage in
178 1005 APML For attending the SF6 gas leakage in Circuit Breaker 28-Jul-21 09:00 29-Jul-21 18:00
765KV us Circuit Breaker
179 1008 MSETCL 220KV-SOLAPUR-KUMBARI-2 Daily Outage is required for Quarterly Maintenance 28-Jul-21 10:00 28-Jul-21 16:00 Quarterly Maintenance
180 1009 MSETCL SOLAPUR - 220KV - BUS 2 Daily Outage is required for Quarterly Maintenance 28-Jul-21 10:00 28-Jul-21 16:00 Quarterly Maintenance
181 1010 MSETCL 220KV-WARDHA-PUSAD-1 Daily For Routine Maintenance Work 29-Jul-21 07:00 29-Jul-21 18:00 Nil
QM of bay 125MVAR Reactor is ready for charge/
182 1018 MSETCL KOLHAPUR-MS - 400KV B/R 1 Daily 29-Jul-21 09:00 29-Jul-21 18:00
Diagnostic testing with PGCIL team in servive.
192 1038 MSETCL 220KV-PARLI-PARLI-M-2 Daily Line maintenance 30-Jul-21 08:00 30-Jul-21 17:00 -
Note Additional outages in the annexure 3.2 will be approved by WRLDC subjected to D-2 studies.
Additional Outages list approved in WRLDC OCCM for the Month of July' 2021
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency
400KV WARDHA-AURANGABAD-1 C For line diversion work due to samrudhi express way near 1-Jul-21 7:00 30-Jul-21 18:00 Additional Outage
1 AD1 POWERGRID_WR1 Aurangabad.(New Construction).
400KV WARDHA-AURANGABAD-2 C For line diversion work due to samrudhi express way near 1-Jul-21 7:00 30-Jul-21 18:00 Additional Outage
2 AD2 POWERGRID_WR1 Aurangabad.(New Construction).
400KV-PARLI-M-LONIKHAND-II-1 C Dismantling/de-stringing, tower erection and stringing work between 3-Jul-21 8:00 17-Jul-21 18:00 For making LILO arangement work for
span 258-259 for LILO arrangement to proposed 400kV Karjat 400kV Karjat S/s,
substation dismantling/destringing, tower erection
and stringing work is required to be
caried out between location on 258-
259 & location on 261-263
3 AD4 MSETCL
of existing 400kV Lonikand-II Girawali
line ckt-I & ckt-
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency
400KV-PARLI-M-LONIKHAND-II-2 C Dismantling/de-stringing, tower erection and stringing work between 19-Jul-21 8:00 30-Jul-21 18:00 For making LILO arangement work for
span 261-263 for LILO arrangement to proposed 400kV Karjat 400kV Karjat S/s,
substation dismantling/destringing, tower erection
and stringing work is required to be
4 AD40 MSETCL caried out between location on 258-
259 & location on 261-263
of existing 400kV Lonikand-II Girawali
line ckt-I & ckt-
5 AD45 WTPL 400KV-KOLHAPUR-MS-SOLAPUR-2 Daily For replacement of faulty insulator at tower No:118 25-Jul-21 9:00 25-Jul-21 18:00 AC TRANSMISSION LINE CIRCUIT
400KV-ALKUD-SOLAPUR-1 Daily For safety purpose AR to be disable while replacing insulators in 25-Jul-21 9:00 25-Jul-21 18:00 AR Mode OFF
6 AD46 WTPL 400 kV Kolhapur-MS-Solapur -2
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency
Outages not considered in WRLDC OCCM for the Month of July' 2021
OCCM Name of Requesting
Sr.No. Line / Element D/C Reason From Time To Time Remarks
Sr. No Agency
NIL
State Element List for the month of July'2021
Sr.No. Voltage Line Equipment From Date From To Date To Time Basis Reason System Agency Remark ,If any.
Time
400/220/33kV ICT-2 & ICT-3 will be in service. This
1 400 KV 400/220/33 KV 500 MVA ICT - 1 @ JEJURI 01-Jul-21 09:30 01-Jul-21 17:30 Daily Annual Testing & Maintenance work. MSETCL MSETCL outage could not be availed in May-21 due to
Loading Condition .
2 400 KV 400/220KV 315MVA ICT - 3 @ CHAKAN 01-Jul-21 09:00 01-Jul-21 17:00 Daily Diagnostic testing and maintenance activities. MSETCL MSETCL ---
13 400 KV CHANDRAPUR - KHAPERKHEDA 06-Jul-21 09:00 06-Jul-21 18:00 Daily Line maintenance work. MSETCL MSETCL NA
14 400 KV WARORA - IEPL 07-Jul-21 09:00 07-Jul-21 17:00 Daily Routine Maintenance & Dignostic testing work . MSETCL MSETCL 400 KV KORADI 2-WARDHA PGCIL Line is in ckt
15 400 KV TIE BAY (412) OF KORADI-1 @ KHAPARKHEDA 07-Jul-21 10:00 07-Jul-21 17:00 Daily Tan Delta & Capacitance of Line CVTs MSETCL MSETCL NA
19 400 KV CHANDRAPUR 2-KUMBHARGAON(NANDED) CKT - 2 07-Jul-21 08:00 07-Jul-21 18:00 Daily Line maintenance work MSETCL MSETCL Nil
21 400 KV 400/220/33 KV 315 MVA ICT - 1 @ WALUJ 08-Jul-21 10:00 09-Jul-21 18:00 Daily Dignostic Testing Work , PGI Overhauling work MSETCL MSETCL Dignostic Testing Work , PGI Overhauling work
25 400 KV NEW KOYNA - STAGE IV CKT 1 08-Jul-21 08:00 08-Jul-21 18:00 Daily Routine maint. Work MSETCL MSETCL Planned outage
26 400 KV TBC @ KOLHAPUR(TALANDGE) 08-Jul-21 09:00 08-Jul-21 18:00 Daily QM of Bay. MSETCL MSETCL TBC is free
For Conductor & Earthwire H/W tightening work if found For Conductor & Earthwire H/W tightening work if
27 400 KV CHANDRAPUR - KHAPERKHEDA 09-Jul-21 08:00 09-Jul-21 17:00 Daily MSETCL MSETCL
any during MP found any during MP
Sr.No. Voltage Line Equipment From Date From To Date To Time Basis Reason System Agency Remark ,If any.
Time
28 400 KV NEW KOYNA - STAGE IV CKT 2 09-Jul-21 08:00 09-Jul-21 18:00 Daily Routine maint. Work MSETCL MSETCL Planned outage
29 400 KV GTR - 8 @ CHANDRAPUR SWITCHING SS 09-Jul-21 09:00 09-Jul-21 17:00 Continuous Diagnostic testing and allied bay maintenace work MSETCL MSETCL Diagnostic testing and allied bay maintenace work
30 400 KV NEW KOYNA-KARAD -CKT1 10-Jul-21 08:00 10-Jul-21 18:00 Daily Routine maint. Work MSETCL MSETCL planned outage
Bay Maitenance & Testing work Bay Maitenance & Testing work
31 400 KV 400/220/20 KV 500MVA ICT - 1 @ KALWA 11-Jul-21 09:00 11-Jul-21 18:00 Daily MSETCL MSETCL
RTV coating work on open delta RTV coating work on open delta
32 400 KV 80 MVAr BUS REACTOR - 1 @ BABHALESHWAR 11-Jul-21 09:00 11-Jul-21 18:00 Daily CT, CB relay testing work MSETCL MSETCL -
34 400 KV 400/220/33 KV 315 MVA ICT - 2 @ WALUJ 12-Jul-21 10:00 13-Jul-21 18:00 Daily Dignostic Testing Work , PGI Overhauling work MSETCL MSETCL Dignostic Testing Work , PGI Overhauling work
35 400 KV 400/220KV 315 MVA ICT - 1 @ NEW KOYNA 12-Jul-21 08:00 12-Jul-21 18:00 Daily Routine maint. Work MSETCL MSETCL Planned outage
for PID Testing Work,shifting autoreclose switch to Non for PID Testing Work,shifting autoreclose switch to
36 400 KV CHANDRAPUR - KHAPERKHEDA 12-Jul-21 08:00 24-Jul-21 17:00 Daily MSETCL MSETCL
auto Mode Non auto Mode
For replacement of faulty insulator strings detected in MP
37 400 KV KHADKA-AURANGABAD 13-Jul-21 06:00 15-Jul-21 18:00 Daily MSETCL MSETCL NIL
& PID
For Conductor & Earthwire H/W tightening work if found For Conductor & Earthwire H/W tightening work if
38 400 KV CHANDRAPUR-PARLI CKT-3 13-Jul-21 08:00 13-Jul-21 17:00 Daily MSETCL MSETCL
any during MP found any during MP
Servicing & alignment of isolators /earth switches will be
39 400 KV 400/220/33 KV 315MVA ICT - 2 @ AKOLA 13-Jul-21 09:00 13-Jul-21 18:00 Daily carried out by Agency.and Routine maintenance & MSETCL MSETCL ICT-01 will be in service
testing work
40 400 KV NEW KOYNA-KARAD-CKT 2 13-Jul-21 08:00 13-Jul-21 18:00 Daily Routine maint. Work MSETCL MSETCL Planned outage
Servicing & alignment of isolators /earth switches will be
41 400 KV AKOLA - KHADKA (BHUSAWAL) 14-Jul-21 09:00 14-Jul-21 18:00 Daily carried out by Agency and Routine maintenance & MSETCL MSETCL Nandgaon Ckt will be in service
testing work
42 400 KV CHANDRAPUR 2- KUMBHARGAON (NANDED) CKT - 1 14-Jul-21 09:00 14-Jul-21 16:00 Continuous Diagnostic Testing Work MSETCL MSETCL Diagnostic Testing Work
For Conductor & Earthwire H/W tightening work if found For Conductor & Earthwire H/W tightening work if
43 400 KV CHANDRAPUR 2-KUMBHARGAON(NANDED) CKT - 2 14-Jul-21 08:00 14-Jul-21 17:00 Daily MSETCL MSETCL
any during MP found any during MP
44 400 KV JAIGAD-NEW KOYNA-I 14-Jul-21 08:00 14-Jul-21 18:00 Daily Routine maint. Work MSETCL MSETCL Planned outage
45 400 KV MAIN BAY (411) OF KORADI-1 @ KHAPARKHEDA 14-Jul-21 10:00 14-Jul-21 17:00 Daily Tan Delta & Capacitance of Line CVTs MSETCL MSETCL NA
Load will be managed on 400/220/33 KV 500 MVA
46 400 KV 400/220/33 KV 500 MVA ICT - 2 @ LAMBOTI 14-Jul-21 10:00 14-Jul-21 18:00 Daily Diagnostic testing work MSETCL MSETCL
ICT - 1 @ LAMBOTI
Line will be shifted on TBC & 400 kV Bus reactor
47 400 KV KORADI-KHAPERKHEDA I 14-Jul-21 09:00 14-Jul-21 17:00 Daily CB timing, DCRM,CRM testing work MSETCL MSETCL
need to be taken out while shifting on TBC
Routine maintainance and DCRM/CRM/CB Timings only Tie CB 418 is in OFF condition ,respective ckt
48 400 KV TIE BAY (418) OF IEPL AND FUTURE LINE-1 @ WARORA 14-Jul-21 09:00 14-Jul-21 17:00 Daily MSETCL MSETCL
Testing works and isolater maintainance work . charged through its own main CB.
49 132 KV KANHAN-MANSAR 14-Jul-21 09:00 14-Jul-21 17:00 Daily Routine Maintenance work. MSETCL MSETCL NA
Servicing & alignment of isolators /earth switches will be
50 400 KV AKOLA-NANDGAONPETH (RPL-AMT) 15-Jul-21 09:00 15-Jul-21 18:00 Daily carried out by Agency and Routine maintenance & MSETCL MSETCL Bhusawal ckt will be in service
testing work
For Conductor & Earthwire H/W tightening work if found For Conductor & Earthwire H/W tightening work if
51 400 KV CHANDRAPUR 2- KUMBHARGAON (NANDED) CKT - 1 15-Jul-21 08:00 15-Jul-21 17:00 Daily MSETCL MSETCL
any during MP found any during MP
52 400 KV JAIGAD-NEW KOYNA-II 15-Jul-21 08:00 15-Jul-21 18:00 Daily Routine maint. Work MSETCL MSETCL Planned outage
Sr.No. Voltage Line Equipment From Date From To Date To Time Basis Reason System Agency Remark ,If any.
Time
400/220/33kV ICT-1 & ICT-2 will be in service. This
53 400 KV 400/220/33 KV 500 MVA ICT - 3 @ JEJURI 15-Jul-21 09:30 15-Jul-21 17:30 Daily Annual Testing & Maintenance work. MSETCL MSETCL outage could not be availed in May- 21 due to
loading condition.
54 400 KV 400/220/33 KV 500MVA ICT - 2 @ LONIKAND 2 15-Jul-21 09:00 15-Jul-21 18:00 Daily Half yearly maintenance and diagnostic testing. MSETCL MSETCL 400/220kV 501 MVA ICT-I will remain in service
DT & Routine Maintenance Work/ DT & Insulator String
55 400 KV LONIKAND 1 -JEJURI 15-Jul-21 09:30 15-Jul-21 17:30 Daily MSETCL MSETCL ---
replacement Work.
56 400 KV 400/220KV 315 MVA ICT - 2 @ NEW KOYNA 16-Jul-21 08:00 16-Jul-21 18:00 Daily Routine maint. Work MSETCL MSETCL Planned outage
57 400 KV 400/220/33 KV 315 MVA ICT - 1 @ DHULE 16-Jul-21 08:00 16-Jul-21 18:00 Daily Routine Testing & Maint work MSETCL MSETCL Routine Testing & Maint work
58 400 KV GTR - 9 @ CHANDRAPUR SWITCHING SS 16-Jul-21 09:00 16-Jul-21 17:00 Continuous Diagnostic testing and allied bay maintenace work MSETCL MSETCL Diagnostic testing and allied bay maintenace work
59 400 KV 400/220/33 KV 500 MVA ICT - 3 @ WALUJ 16-Jul-21 10:00 17-Jul-21 18:00 Daily Diagnostic Testing Work , PGI Overhauling work MSETCL MSETCL Diagnostic Testing Work , PGI Overhauling work
Routine maintainance and Line/Bus/Tie CT TAN 400KV PGCIL Line will be charged through main
60 400 KV 400 KV FUTURE BAY II @ WARORA 16-Jul-21 09:00 16-Jul-21 17:00 Daily MSETCL MSETCL
DELTA,IR and isolater maintainance work etc . CB 420.
61 400 KV 400/220/33 KV 501MVA ICT - 4 @ BABHALESHWAR 18-Jul-21 08:00 18-Jul-21 18:00 Daily Bushing, CT,CB Diagnostic testing MSETCL MSETCL ICT 1, 2, 3 will be in service
1. QM of Bay Load will be managed on 400kV Karad-Talandge
62 400 KV KARAD - TALANDGE CKT 1 19-Jul-21 09:00 19-Jul-21 18:00 Daily MSETCL MSETCL
2. C & tan delta testing of CTs & CVTs ckt -2
Fro replacement of faulty insulator strings detected in MP
63 400 KV KHADKA - BABLESHWAR 20-Jul-21 06:00 22-Jul-21 18:00 Daily MSETCL MSETCL NIL
& PID
Quarterly Maint. Work & Diagnostic Testing Work
64 400 KV 125 MVAr BUS REACTOR @ ALKUD 21-Jul-21 09:00 21-Jul-21 18:00 Daily MSETCL MSETCL Outage Required
65 400 KV CHANDRAPUR 2 - DHARIWAL CKT - 1 21-Jul-21 09:00 21-Jul-21 16:00 Continuous Diagnostic Testing Work MSETCL MSETCL Diagnostic Testing Work
66 400 KV JEJURI- KOYNA STAGE-IV 22-Jul-21 09:30 22-Jul-21 17:30 Daily DT & Insulator String replacement Work. MSETCL MSETCL ---
1)Measurement of CRM, Timing & DCRM of Circuit During this, GTR-5 bay will be in will service via
68 400 KV GTR - 5 @ CHANDRAPUR SS 22-Jul-21 09:00 22-Jul-21 18:00 Continuous Breaker. 2) Maintenance and alignments of PG-1 & 2 MSETCL MSETCL TBC-2 bay.
Isolators
69 400 KV 400/220KV 500MVA ICT 2 AT 400KV DHULE S/S 23-Jul-21 08:00 23-Jul-21 18:00 Daily Routine Testing & Maint work MSETCL MSETCL Routine Testing & Maint work
70 400 KV GTR - 8 @ CHANDRAPUR SWITCHING SS 23-Jul-21 09:00 23-Jul-21 17:00 Continuous Diagnostic testing and allied bay maintenace work MSETCL MSETCL Diagnostic testing and allied bay maintenace work
During outage, 400KV CHD_2 Ckt. No- 1 & 2,
1) Measurement of Tan delta & capacitance of 400KV
400KV Khaparakheda ckt, 400KV PGCIL Ckt. - 1,
71 400 KV CHANDRAPUR-PARLI CKT-3 24-Jul-21 09:00 24-Jul-21 18:00 Continuous R, Y & B-ph CTs which are due since 02 years. 2) MSETCL MSETCL
2, 3 and 4 will be in service.
Maintenance and alignments of PG Isolators and CB
72 400 KV 400/220/33 KV 500 MVA ICT - 3 @ DHULE 24-Jul-21 08:00 24-Jul-21 18:00 Daily Routine Testing & Maint work MSETCL MSETCL Routine Testing & Maint work
73 400 KV TBC @ BABHALESHWAR 25-Jul-21 08:00 25-Jul-21 18:00 Daily CT,CB Diagnostic testing, Relay testing MSETCL MSETCL -
Routine maintainance and Line/Bus/Tie CT TAN Bay No 404 charged upto line CT (400KV
74 400 KV 400/220/33 KV 500MVA ICT - 1 @ WARORA 26-Jul-21 08:00 26-Jul-21 17:00 Daily MSETCL MSETCL
DELTA,IR and isolater maintainance work etc . ICT No -1 handed over to 400kv Bableshwar )
1) Measurement of Tan delta & capacitance of 400KV During outage, 400KV CHD_2 Ckt. No- 1 & 2,
R, Y & B-ph CTs which are due since 02 years. 2) 400KV Parli ckt-3, 400KV PGCIL Ckt. - 1, 2, 3 and
75 400 KV CHANDRAPUR - KHAPERKHEDA 26-Jul-21 09:00 26-Jul-21 18:00 Continuous MSETCL MSETCL
Maintenance and alignments of PG Isolators and CB 4 will be in service.
Isolators.
76 400 KV 125 MVAr BUS REACTOR @ TALANDGE 28-Jul-21 09:00 28-Jul-21 18:00 Daily Dignostic testing of reactor bushings, Wdg & CTs MSETCL MSETCL 80MVAR reactor is ready to charge/ in service