Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

INSPECTION REQUEST

TO BE FILLED-IN BY CONTRACTOR
Contractor Request No: ASKEC-ADDL-EREC-01
Check the box if this is a request for re-inspection
PROJECT TITLE :

CONTRACT NO. : 4400003961 B.I.NO. : J.O. NO. :


NAME OF CONTRACTOR : Al Sharif Group & KEC Limited Co. (ASKEC)
INSPECTION CATEGORY AND APPLICATION (Check Appropriate Box):
Civil / Architectural Electrical Safety
√ Mechanical Communication Others (Specify)
1. Item for Inspection : Tower Assembly and Erection
2. Relevant Specs. and Drawings :
3.
Inspection
Location: T#57 4. Date: 25-02-18 5. Time: 7.00 am - 5.00 pm
Work is ready for inspection and complies with the Scope of Work and Technical Specifications.

Name, Signature and Date: Sitaram Pani Mobile. No.: 0547519915


Contractor’s QA/QC Engineer E Mail ID: panis@kecrpg.com
TO BE FILLED-IN BY CTAPD
TO: Division Manager, TAPD/TSPD, Rm. 1-200E, SEC-EOA (Tel. No. 858-6866, Fax No. 858-5376)
Division Manager, ISD/FF&LPD, Rm. 3-100E, SEC-EOA (Tel. No. 858-5120, Fax No. 858-5397)
Supervisor, TS&SD/ESD/PQS, Rm. 1-200E, SEC-EOA (Tel. No. 858-6627, Fax No. 858-6447)
√ Others: “SEC/AMD-LMD/ABQIAQ”
Please send your Engineer to conduct inspection of the work covered by this Inspection Request
Tel. No.:
Mobil No.:
Engr. Email. ID.:
MANAGER-AMD-LMD
TO BE FILLED-IN BY TS&SD/ESD, TAPD/TSPD, ISD/FF&LPD, SMED\P&T or BY OTHERS
INSPECTION RESULTS AND COMMENTS: Control No.: ASKEC-ADDL-EREC- 01

1. Inspection Date and Time:


2. Results and Comments: See Below Refer to Logbook Page No.

Inspected by: Return To:


Signature: Name:
Name/Dept./Div.:
Date: Tel. No.: Rm. 2-200E, SEC-EOA Tel. No.:
Note: Send this Inspection Request 48-hour prior to start of the activity except re-inspection and concreting work where only 24-
hours advance notice is required.

You might also like