Professional Documents
Culture Documents
CPB Sem2012 p14 Separator Case Studies
CPB Sem2012 p14 Separator Case Studies
2 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study I, Schelklingen
3 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study I, Schelklingen
4 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study I, Schelklingen
Motivation of modernisation
5 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
CPB separator modernisation
6 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
CPB separator modernisation
New design
Air guide vanes
(louvres)
Rotating cage
Separation zone
Former design
8 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
CPB separator modernisation
9 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
CPB separator modernisation
10 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study I, Schelklingen
Product. in %
Production increase:
120 14,4%
114,5 %
100
100 %
90
80
CEM II/A-LL 32,5 R
70
11 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study I, Schelklingen
Product. in %
Energy savings:
120 13,78%
100
100 %
90
80 86,22 %
CEM II/A-LL 32,5 R
70
12 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study I, Schelklingen
o Before conversion:
Bypass 20%
Fineness of 3800 cm2/g is
needed for required strengths
before after
conversion conversion
o After conversion:
Bypass less than 7%
Fineness of 3600 cm2/g is
now enough for required
strengths
13 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study I, Schelklingen
14 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study II, Phoenix
15 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study II, Phoenix
Motivation of upgrade
o Diversification of products
• specific cement types of higher product fineness
16 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study II, Phoenix
17 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study II, Phoenix
o Situation
• Axial sampling
• Grindability measurement of clinker (according to Zeisel)
• Tromp curve determination of installed separators
18 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study II, Phoenix
Process approach
o Characteristic figures:
• Rated volumetric flow: 143.350 Am3/h
• Operating temperature: up to 120 °C
• Installed motor rating: 200 kW
• Max. feed rate: 258 tph
• Max. fine product: 115 tph
19 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study II, Phoenix
Plant layout
former Heyd separators and new QDK separator
2 Heyd separators
QDK separator
with cyclones
20 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study II, Phoenix
Project period
Main installation:
3d
6 weeks
21 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study II, Phoenix
22 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study II, Phoenix
23 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study II, Phoenix
Results of Modernisation
Compressive strength at different product fineness
CEM II/A-LL 32,5 R
24 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study II, Phoenix
Results of Modernisation
Product fineness
CEM II/A-LL 32,5 R
25 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study II, Phoenix
Results of Modernisation
Production capacity
CEM II/A-LL 32,5 R
26 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study II, Phoenix
Results of Modernisation
Tromp curves on different CEM I cements
o CEM I 32,5 R (light blue),
correlating to existing
product capabilities
27 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
Case study II, Phoenix
Conclusion
Specific energy savings only by exchange the separator
o CEM I 42.5 R
Specific energy savings of around 10%
o CEM I 52.5 R
Established new product at the market
28 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH
2 separator case studies
Any questions?
Feel free to ask!
29 Separator modifications – 2 case studies – September 24-26, 2012 © Christian Pfeiffer Maschinenfabrik GmbH